Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 645     Entry time: 10 Sep 2025, 10:31
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 10.09.2025 
General Announcement:
- M. Doering announces on the LIMP-25: 
1. XTD10 Scaffolding is installed for cabling work in October; 
2. PLC updates: remaining work in tunnels to be done next week (discussed with VAC and XPD) as well as at SQS; 
3. Update task list: M. Doering will send to the groups the Task list for that it is updated accordingly to the latest status (e.g. completed, cancelled, delayed...); 
4. Recurring tasks for the Winter Maintenance will be planned for the end of the year. A list will be sent to the groups and please inform XO if you have new activities to be done before 2026. 

CTRL:
- Karabo upgrade: start with MID next week to spot possible issues. MID topic will be accessible from the hutch only. 

DA:
- Nothing to report.

EEE:
- PLC updates: see above.

VAC:
- Everything progressing well in XTD6 also with PLCs. 

XPD:
- Nothing to report.

DET:
- Nothing to report; starting AGIPD at MID before Karabo is down in October.

ITDM: 
- Nothing to report.
- Fast-X gateway upgrade last week is done.

XRO:
- Busy with SA1 activities.

LAS:
- Not present.

UNSYS:
- Delays with water and cable from Desy groups; but all ongoing.

SPB:
- Not present.

FXE:
- Nothing to report.

MID:
- MID control room is very warm: needs to check temperatures in control room; Gerd W. says technical infrastructure needs to be modified.

HED:
- Nothing to report.

SCS:
- Issue with installation of beam stop and AIBS position.

SQS:
- Not present.
SXP:
•	Not present.