Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 340
Entry time: 11 Jul 2022, 09:52
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 11.07.2022 |
|
|
General Announcement:
- User Operation Meeting will re-start on cw30 (Friday 29.07).
CTRL:
- Nothing major to report.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Tunnels were searched and closed last Thursday and photon tunnels XTD6 and XTD9 can be opened again when Interlock tests are done.
XPD:
- Nothing to report.
DET:
- Problem with in-vacuum cooling pipes at DSSC detector: reason is not yet known and is under investigation.
ITDM:
- Nothing to report.
XRO:
- Not present.
LAS:
- Issues with timing system; issues with Doocs also. LAS needs to discuss with EEE and Desy groups. Patrick G. points that there is ticket with Tim Wilksen ongoing. Investigation will take place today.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- All fine at MID.
- It requests to get an information when TUEV tests are done on THU or FRI, if available.
HED:
- HED thanks EEE for solving last week's issues.
SCS:
- Nothing to report.
SQS:
- Not present. |