Subject: Notes XO Integration Meeting 10.05.2021 
General Announcement:
- Two smoke sensors affected in SA3 triggering fire alarm: The first one could be reset but for the second one the reset did not work and fire brigade was in. 
Beam operation was recovered only after the External company came to reset it. The downtime of about 4 hours for SA1/SA3 operation happened.

CTRL:
- Nothing to report.

DA:
- On behalf of calibration team: this morning a major upgrade will be done. No access to calibration services during this time.

EEE:
- One loop in FXE was not working during the weekend. Issues with movs/motor loops and the cause has to be investigated (old scripts were in use). No devices were 
damaged.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Deployment for HED calibration taking place shall fix last week's issue.
- A fix for DAQ on AGIPD to be done.
- FXE issue with LPD calibration: still open. This is not related to the DA deployment today. Jolanta S-D. will follow it inside DET.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Nothing to report.

UNSYS:
- Fire alarms in SA3 / cell#22-23 on Saturday evening: BKR informed that could be related to synchrotron radiation on the detector signal. Fire brigade was on-site but no 
fire was found.

SPB:
- Nothing to report.

FXE:
- Thanks to EEE help with Gotthard.
- M2 Mirror pitch issues seems to be back to normal as before. Antje T. (XRO) made ZZ to correct loose gear box.
- Motor loops issues found and addressed by EEE.

MID:
- Nothing to report.

HED:
- Motor stop working and ticket has been written.
- Preparing for experiment this week.

SCS:
- Zoom problems last week has been taken care; Thanks to ITDM.

SQS:
- Nothing to report.