Entry   Notes XO Integration Meeting 02.02.2022, posted by Andreas Galler on 02 Feb 2022, 08:39 


General Announcement:


 


CTRL:
Entry   Notes XO Integration Meeting 31.01.2022, posted by Frederik Wolff-Fabris on 31 Jan 2022, 10:03 
General Announcement:
-  On this current run, beam delivery to instruments will start on Tuesday at 07:00AM.
Entry   Notes XO Integration Meeting 26.01.2021, posted by Frederik Wolff-Fabris on 26 Jan 2022, 10:46 
General Announcement:
- The cold compressor failed this morning and beam operation is currently stopped. We expect the beam operation for the alignment of beam systems will
resume tomorrow morning (Thursday).
Entry   Notes XO Integration Meeting 24.01.2022, posted by Frederik Wolff-Fabris on 24 Jan 2022, 11:18 
General Announcement:
- Steffen H. states DOC starts in special operation mode 09:00-17:00 for the weekdays. Jour-fixe also starts today at 13:00. Instruments are welcome to
join.
Entry   Notes XO Integration Meeting 19.01.2022, posted by Frederik Wolff-Fabris on 19 Jan 2022, 11:00 
General Announcement:
- Machine status: SA2 is currently lasing @ 9keV and 2.5mJ. North Branch was closed yesterday and after a quick ZZ in XTD10 this morning the BBA and tuning
will resume today and tomorrow.
Entry   Notes XO Integration Meeting 17.01.2022, posted by Frederik Wolff-Fabris on 17 Jan 2022, 10:41 
General Announcement:
- SEPS interlock tests are scheduled for this Friday January 21st; Zunaira A. needs XTD6 closed by the SEPS interlock at 09:00. 
Martin D. will evaluate if it is possible to close XTD6 before Friday pending to finish the work (without closed vacuum we won't have beam in future).
Entry   Notes XO Integration Meeting 12.01.2022, posted by Frederik Wolff-Fabris on 12 Jan 2022, 10:06 
General Announcement:
- SEPS interlock tests are scheduled for January 21st: starting early morning from 08:00 to 16:00 across all the SASEs; 
In parallel D-3 tests the interlocks in all hutches including SXP. An e-mail to instruments was sent and a reply has to be directed to Zunaira A.
Entry   Notes XO Integration Meeting 10.01.2022, posted by Frederik Wolff-Fabris on 10 Jan 2022, 09:22 
General Announcement:
- The "Readiness" mailing list will be discontinued and substituted by the "xo-info@xfel.eu" list. This new list is owned by XO and please use it in future
for sharing information to a broad audience.
Entry   Notes XO Integration Meeting 05.01.2022, posted by Andreas Galler on 05 Jan 2022, 09:29 


General Announcement:


 


CTRL:
Entry   Notes XO integration meeting 20.12.2021, posted by Andreas Galler on 20 Dec 2021, 09:25 
General Announcement:


 


CTRL:


no update


DA:
Entry   Notes XO Integration Meeting 15.12.2021, posted by Frederik Wolff-Fabris on 15 Dec 2021, 10:26 
General Announcement:
- Severe power cut affected Schenefeld campus yesterday: it seems to be associated to human error but investigations are still ongoing. As soon as information
will be available, it will be distributed via 
Entry   Notes XO Integration Meeting 13.12.2021, posted by Frederik Wolff-Fabris on 13 Dec 2021, 10:51 
General Announcement:
- The cooling water various types shall be working/restored and it seems that temperatures are back to normal. In case of finding deviations in temperatures
let TS or XO know. Racks and racks rooms can in 
Entry   Notes XO Integration Meeting 08.12.2021, posted by Frederik Wolff-Fabris on 08 Dec 2021, 11:02 
General Announcement:
- The temperatures in the Hall are warming and accordingly to Tobias C. this is related to cooling water as ventilation is also affected.
- A. Galler reminds on an e-mail sent yesterday related to check-in at XFEL today: one has to show vaccination status at the gate. For next week likely
Entry   Notes XO Integration Meeting 06.12.2021, posted by Frederik Wolff-Fabris on 06 Dec 2021, 11:54 
General Announcement:
- Cooling water situation at XHQ: initially there is no cooling water until possibly 13.12. To the best of XO knowledge all groups are informed. If this
is not the case please contact XO. 
Entry   Notes XO Integration Meeting 01.12.2021, posted by Frederik Wolff-Fabris on 01 Dec 2021, 09:49 
General Announcement:
- Info that today the 20C cooling water will be switched to the towers was sent. Please also open rack doors to help until further notice. Tomorrow we
will understand if cooling water tower is working and 
Entry   Notes XO Integration Meeting 29.11.2021, posted by Frederik Wolff-Fabris on 29 Nov 2021, 11:50 
General Announcement:
- Today and tomorrow are the two last days of operation with ramp down of tunnels components. On Wednesday many activities are planned for the start of
the maintenance period. 
Entry   Notes XO Integration Meeting 24.11.2021, posted by Frederik Wolff-Fabris on 24 Nov 2021, 09:56 
General Announcement:
- Discussions on 3G rules access controlling are ongoing by the Covid task force. However, there is nothing else apart of what was recently announced.
- Next Monday and Tuesday (29-30.11) is dedicated to the ramp-down of the accelerator and photon systems and from Wednesday 01.12 it is the start of the
Entry   Notes XO Integration Meeting 22.11.2021, posted by Frederik Wolff-Fabris on 22 Nov 2021, 10:13 
General Announcement:
- On Accessing EuXFEL premises at Schenefeld: it is no longer necessary to present the test result at the Gate; it is necessary to present the QR code
for vaccination/recovery as well as the DACHS card at 
Entry   Notes XO Integration Meeting 17.11.2021, posted by Frederik Wolff-Fabris on 17 Nov 2021, 11:20 
General Announcement:
- XO will publish on Friday the full maintenance task list. Everyone is invited to also look at the Infrastructure calendar which contains main dates on
this topic. 
Entry   Notes XO Integration Meeting 15.06.2021, posted by Frederik Wolff-Fabris on 15 Nov 2021, 09:57 
General Announcement:
-  
ELOG V3.1.4-7c3fd00