Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 375     Entry time: 21 Nov 2022, 10:09
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 21.11.2022 
General Announcement:
- The procedure for requesting gases and cryogenic liquids consists in submitting a ticket to TS at least one week prior your plans for usage/needs. 
Please avoid requests by phone or e-mail or at last minute which may not be possible to grant.
- An e-mail on the effects of the Electrical and Drinking water activities of 03.Dec was sent to xo-info@xfel.eu mailing list. In case of questions please contact xo-planning@xfel.eu.

CTRL:
- Busy together with EEE preparing for the deployment and test SA2 VAC update.

DA:
- All fine.

EEE:
- VAC SA2 update activity starting at 12:00 today.

VAC:
- Nothing to report.
- As PRC, Martin Dommach says the weekend was quiet with no major issues.

XPD:
- Nothing to report. All fine.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report. Issue with pump diode at PP-laser SA1 last Wednesday was solved by replacing it.

UNSYS:
- Nothing to report.

SPB:
- Last shifts on weekend were cancelled.

FXE:
- Lost 2 days with PP-laser operation.
- Weekend problem with digitizer: stopping every two hours but lately more often. Had to start acquisition manually. Called DOC and solved by re-instantiating the Karabo. 
It should investigate if a permanent solution can happen.
- Issues with undulator scans energy: beam instability while scanning - BKR switched OFF feedback which somewhat helped. Pulse energy fluctuates during the scans.

MID:
- All fine - start preparing for the power outage of Dec.3rd.

HED:
- Minor issues: 1. DAQ aggregator slow again; 2. Saturday the proposal was finished due to issues; 
3. issues with Jungfrau (DOC contacted): experiment killed the rep rate with communication between Karabo and detector SA2 topic (Jungfrau not triggered at the right trains of laser pulses).
- Drop in HXRSS ending with on Sunday with 100uJ.

SCS:
- Nothing to report.

SQS:
- Nothing to report.
ELOG V3.1.4-7c3fd00