Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 375
Entry time: 21 Nov 2022, 10:09
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 21.11.2022 |
|
|
General Announcement:
- The procedure for requesting gases and cryogenic liquids consists in submitting a ticket to TS at least one week prior your plans for usage/needs.
Please avoid requests by phone or e-mail or at last minute which may not be possible to grant.
- An e-mail on the effects of the Electrical and Drinking water activities of 03.Dec was sent to xo-info@xfel.eu mailing list. In case of questions please contact xo-planning@xfel.eu.
CTRL:
- Busy together with EEE preparing for the deployment and test SA2 VAC update.
DA:
- All fine.
EEE:
- VAC SA2 update activity starting at 12:00 today.
VAC:
- Nothing to report.
- As PRC, Martin Dommach says the weekend was quiet with no major issues.
XPD:
- Nothing to report. All fine.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Nothing to report. Issue with pump diode at PP-laser SA1 last Wednesday was solved by replacing it.
UNSYS:
- Nothing to report.
SPB:
- Last shifts on weekend were cancelled.
FXE:
- Lost 2 days with PP-laser operation.
- Weekend problem with digitizer: stopping every two hours but lately more often. Had to start acquisition manually. Called DOC and solved by re-instantiating the Karabo.
It should investigate if a permanent solution can happen.
- Issues with undulator scans energy: beam instability while scanning - BKR switched OFF feedback which somewhat helped. Pulse energy fluctuates during the scans.
MID:
- All fine - start preparing for the power outage of Dec.3rd.
HED:
- Minor issues: 1. DAQ aggregator slow again; 2. Saturday the proposal was finished due to issues;
3. issues with Jungfrau (DOC contacted): experiment killed the rep rate with communication between Karabo and detector SA2 topic (Jungfrau not triggered at the right trains of laser pulses).
- Drop in HXRSS ending with on Sunday with 100uJ.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |