Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 360     Entry time: 21 Sep 2022, 10:18
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 21.09.2022 
General Announcement:
- A power glitch was detected at around 05:50AM today and it was transparent for the machine. Please check your systems are also running normally.
- A reminder will be sent to xo-info for the deadline to submit the winter maintenance task list.

CTRL:
- CTRL was able to reproduce the issue locally at the Imager and the work on a fix is ongoing.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Issue with SA3 FEL IMAGER yesterday morning: a damage to the YAG was found and it was adjusted to a new position. 
A reminder for SA3 instruments: please look at the watchdogs and at higher photon intensities it is preferable to start with the Diamond screen for tuning purposes.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Issue with a stuck phase shifter in SA3 / cell16 was solved by a ZZ by placing a spare motor. Cause is likely due to radiation damage. 
Purchase of Lead shields are ordered and will be delivered next year. 

SPB:
- Nothing to report.

FXE:
- Yesterday it contacted operators to discuss the RF window for SA1 which was set shorter than the requested.
- No further information on the "ghost" beam last week. It was seen only in the detector placed at the beam when SA2 or SA3 were set to zero bunches. 

MID:
- Trouble with hexapod during the weekend, which revealed to be broken. It was removed yesterday and is impacting the sample motion. A workaround is being put in place.
- New monitoring for Agipd gets stuck with calibration. DA is looking into it.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Installing spectrometer during this and next week.