Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 376     Entry time: 23 Nov 2022, 10:03
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 23.11.2022 
General Announcement:
- Remind the 03.12 activity on Electrical and drinking water is nearing: please contact XO if you have any questions on their effects or where electricity is affected.


CTRL:
- Monday SA2 VAC tests went fine.

DA:
- Nothing to report.

EEE:
- TCP/IP VAC SA2 tests went fine on Monday.

VAC:
- Nothing to report.

XPD:
- No incident to report; Preparing for the studies e.g. 30keV.

DET:
- Jungfrau 1M module at FXE: work ongoing in the detector to understand why burst mode was not working. Work with firmware is done.
- MID detector update is ongoing (opened detector; needed support from Desy). Now it is back online.
- SPB AGIPD firmware update was done and tomorrow exchange front end modules.

ITDM: 
- Nothing to report.

XRO:
- Reported by SQS strange behavior of M1 in SA3 (related to beam moving event of last weekend): after investigation it was found one electronics was dying near the Dump, probably related to radiation 
damage. 
It will be disconnected as it is not needed at the moment. During the WMP more activities will be done. 
- Monday there is the Ramp-down activity scheduled to access conditions of mirrors: SA3 hutches must be interlocked at lest for the morning. An agreement for time schedule will be done.

LAS:
- Nothing to report.
UNSYS:
- All fine with Undulators. There are 5 spare encoders for PS.

SPB:
- AGIPD intervention planned for tomorrow.

FXE:
- EEE is looking into homing procedure with encoders today.
- PP-laser issues from last week were resolved.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.
- Giuseppe M. will ask internally if hutch can be closed on Monday.

SQS:
- Suffering from artefact on DAQ 412 digitizer recently: if another instrument also see such problems, please contact Alberto de Fanis.
- SQS can close the hutch on Monday.