Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 366     Entry time: 17 Oct 2022, 09:31
Author: Andreas Galler 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 17.10.2022 

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing special

EEE:

  • OCD call on Friday
    • ion pump controller broken in XTD1

VAC:

  • see EEE --> additionally over the weekend the pump was taken out of the interlock

XPD:

  • nothing

DET:

  • JungFrau damagat at SPB/SFX in cw 40
    • two powder rings permantnly burned into detector

ITDM:

  • SA2 online system (gpfs) one enclosure is bahving strangely, --> fixed no replacement needed

XRO:

  • nothing to report

LAS:

  • crash of PPLaser in SA1 over the weekend
    • TRGDly was upgraded recently/ crashed for SPB --> TRGDly device being rolled back and PPLAS1 should be back up today.

UNSYS: 

  • ccell 25 SA1 fixed --> now only 6 motors are left.
    • Lead shields ETA beginning of February --> will have to be done through ZZ
    • broken motors and encoders are sent back to Beckhoff
      • repair time approx. 2 - 3 months

SPB/SFX:

  • Jet control stopped
  • PPLAS
    • on Friday there was no LAS output --> fixed
      • no LAS OCD in blue weeks, and on Friday no LAS group member on site --> earliest service on Saturday through good will.
    • shift change not successful due to miscommunication
      • SPB let the laser run over night for measurements --> FXE did shift change over night eventually destroying the SPB measurement
    • see LAS TRGDLY device
  • SPB requests to not upgrade software thorugh run for PPLasers.
    • recently there were some upgrades on a Monday which then later fail for operation
  • SPB notest that there is only limited OCD by LAS group and then LAS cannot cover critical components

FXE:

  • set up built for User Experiment
    • HallCrew supported in build up
    • LAS use --> see SPB/SFX

MID:

  • all fine at MID

HED:

  • user experiment being set up

SCS:

  • not present

SQS:

  • nothing to report

DRC

  •  

PRC

  •  