124
|
25 May 2020, 15:29 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 25.05.2020 |
General Announcement:
- Machine started SA2 lasing last weekend. Currently photon energy is 0.5mJ at 9keV.
- CTRL OCD was called Friday on the SR slits position and movement. It was quickly solved.
- XO ask people who carries work in tunnels to use this meeting to raise questions and concerns.
- XO also ask people to discuss during this series of meetings possible resource conflicts among the support groups for the upcoming week(s).
CTRL:
- New Karabo version installed at MID is working nicely. Instrument staff is creating new panels with Karabo9 and CTRL hopes to integrate
this Karabo version in the whole facility during summer shutdown.
DA:
- Not present.
EEE:
- Working in normal duties.
- Cabling installation in SQS is done. The FXE installation has a mismatch with a rack planning (XGMD) and responsible company for installation
may come back on Wednesday to solve it.
VAC:
- Tunnel works are nicely ongoing.
XPD:
- Working on tunnels and looking at lasing in SA2.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- A water leakage in an amplifier box in SA1 laser occurred last Thursday. It is repaired but LAS will have to investigate on possible damages on optics
(due to water inside). Laser operation will be possible only tomorrow or at the end of the week. LAS will provide further details on Wednesday.
SPB:
- Nothing to report.
FXE:
- Nothing to add besides the cabling installation issue mentioned by EEE.
MID:
- New Karabo is working nicely up to now.
- Tunnels work is also finished; MID staff continues with work on the hutch/optics.
HED:
- No issues to report.
SCS:
- SCS will be busy with an external company and needs assistance of SRP on hot work permit. Sandra Plett will communicate with Michael Prollius.
- SCS has informed DET that there is data in the computer to be saved. DET is aware and has taken needed actions.
SQS:
- Nothing to report: activities are progressing normally. |
319
|
25 Apr 2022, 10:09 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 25.04.2022 |
General Announcement:
- Regarding the use of special diagnostics devices: on THU XPD received a call for supporting the use of HIREX in the tunnels. XO would like to ask instruments to inform XPD or XO well in advance for such
requests, if possible.
Please include that in the "Comments" column of the X-ray delivery tables.
- Deadline for submitting the 2022 summer maintenance period is next Friday 29.04.
- A. Silenzi reminds instruments to join the Jour-Fixe meeting with DRC today at 13:00.
- Thomas Michelat reminds that during the night the instruments shall call the regular DOC number and not directly e.g. the CTRL OCD number.
- A. Galler inform the operation affair on the FXE mono is to be prepared in the next week or so, following the updated process for Operation Affairs.
CTRL:
- CTRL reminds that today at 13:00 there is an update of Karabo device in tunnels (for Beckhoff systems).
- Also at 13:00 an update of Aravis cameras in tunnels will take place.
DA:
- Nothing to report.
EEE:
- EEE is continuing the work with PnCCD issues.
- A ZZ in XTD6 will be done today for HED Mono.
- Investigating a motor in a CRL that showed issues.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Marcin S. says that one of the AGIPD central tiles was lost last week after a sudden beam jump. This will be discussed/investigated by DET / Olivier M.
ITDM:
- Sync&Share service is not accessible tomorrow 26.04.
- Today at 10AM the Redmine service will be updated.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Issue on Friday with SA2/cell33 not moving the gap. A remote reset solved the problem.
- Last night when moving SA3/cell21: it did not move and the cause was a strong applied taper. Now it is solved.
SPB:
- Experiments went well.
- AGIPD was affected due to beam movement.
FXE:
- Commissioned the Johann spectrometer last week and this week the plan is commissioning the Gotthard spectrometer.
MID:
- All fine at MID.
HED:
- Different settings for M1 and M2: changed positions have to be coordinated with MID, XPD and XRO when beam will be aligned again to HED. It caused problems for the HIREX alignment.
- A meeting/communication among these groups have to be organized. Angel R.-F. says that today and tomorrow morning work on the mirrors will work. XRO will lead and new positions to be communicated to HED.
SCS:
- Problems with cell21 last night.
- MDL devices for multi-pattern showed issues and will be discussed among SCS and CTRL.
SQS:
- Issue with two digitizers in the same uTCA board that can not be used in interleaved. Current understanding is that one has to ship device back to the manufacturer. |
501
|
25 Mar 2024, 10:24 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 25.03.2024 |
General Announcement:
- A power glitch happened last night around 02:50AM.
CTRL:
- Nothing to report.
- DAQ update: MID had operation during the weekend and seems to run fine; one issue after several hours needed a recycling but further investigation is ongoing to provide a fix in the coming days.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing major to be report.
- AGIPD in SPB/SFX is running with 16modules; issue with connection caused one module to do not work (due to positions). There is a golden position and for next quadrant move has to be observed.
For a fix one needs a heavy intervention (disassemble half the detector - for the big shutdown).
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Not present.
UNSYS:
- Everything is fine.
SPB:
- Nothing to report.
FXE:
- Not present.
MID:
- All fine at MID.
HED:
- Nothing to report.
SCS:
- Experiment goes well so far.
- Hall crew will support SCS this week.
SQS:
- Nothing to report.
SXP:
- Not present. |
389
|
25 Jan 2023, 11:01 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 25.01.2022 |
General Announcement:
- As PRC, Raul V. thanks to CTRL and EEE for the work with the SEPS yesterday.
CTRL:
- New version for bunch alignment monitor devices (for pulse resolved operation). An e-mail will be sent to xo-info list.
- Regarding the issue reported by LAS: Karabo Beckhoff device went in error and a work around solution has been developed and to be implemented to reset the system.
- Issues with SEPS interlocks: PLCs devices went down at HED during tests.
Steffen H. says an interface issue with Karabo happened; interlock settings are protected; yesterday CTRL had to implement a new update and as consequence many PLCs went down.
DA:
- Bring up days going smoothly; few issues found were fixed.
EEE:
- Nerea J. informs that fix for the MDL for IMGS is deployed and shall work.
- SEPS modifications were done by lunch time yesterday. SA1 and SA2 were tested by end of the day. The SA3 SEPS tests will be done on Monday.
VAC:
- Nothing to report.
XPD:
- Hard X-ray PES was recommissioned last week. New Metrocal acquisition did not work; DA will investigate and inform XPD.
DET:
- Bring up days are ongoing.
ITDM:
- E-mail was sent for the dCache maintenance scheduled for next Monday.
XRO:
- Not present.
LAS:
- Issues with stages are under work and to be implemented today.
UNSYS:
- A ZZ in SA2 to replace PS motor in cell 17 took place. The motor was replaced and a few spares are still remaining.
- This or next week Pb shields will be received and ZZ would be required for their installation.
- Tomorrow the alignment of 4mm aperture in SA2 will take place.
SPB:
- Not present.
FXE:
- Nothing to report.
MID:
- Comment to XRO: alignment in tunnel XTD1 in ongoing.
HED:
- Broken pile-up on Monday happened. Steffen H. says that macros can be restarted now.
- Alignment in tunnels by XRO: HED needs some information on activities.
SCS:
- Busy with bring up days at hutch.
SQS:
- Not present. |
193
|
25 Jan 2021, 09:28 |
Arvid Gebhardt | General | Information | Notes XO Integration Meeting 25.01.2021 |
General Announcement:
- Test of automatic switch of power bridge is shifted to Feb.2: this affects all devices connected to orange or green power sockets (no power for few seconds/minute). General e-mail will be sent. Instruments will need to care for equipment which is connected to these sockets. This also affects the E0 level as well as office space in XHQ. Pease plug devices out or re-plug in other sockets.
- The Covid-19 regulations continue valid. Only critical work in the XHEXP1 or tunnel activities shall take place.
- Work on the Soft Mono in XTD10 (SA3) takes place this week. XRO and ME asks everybody to do not move any motors in this device during the whole week.
CTRL:
- New Script to fix label issues in Karabo is ready and will be run today. An e-mail will be sent.
- ITDM and CTRL managed to get updated the “Read the docs”. It runs properly.
DA:
- Not present due to Satellite Workshop.
EEE:
- nothing to report
VAC:
- continuing with tunnel works
XPD:
- Ongoning with few tasks in the tunnel
DET:
- Not present
ITDM:
- nothing to report. Offline GPFS under work today: no Maxwell access during this time.
XRO:
- Not present. Please see general announcements on the Soft Mono.
LAS:
- Error with remote operation on mirrors for SA3/SQS PP-laser is found. A discussion after the meeting will take place between LAS and XO.
UNSYS:
- Nothing to report
SPB:
- Nothing to report
FXE:
- Nothing to add
MID:
- all fine
HED:
- Nothing to report
SCS:
- Nothing to report
SQS:
- Nothing to report |
281
|
24 Nov 2021, 09:56 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 24.11.2021 |
General Announcement:
- Discussions on 3G rules access controlling are ongoing by the Covid task force. However, there is nothing else apart of what was recently announced.
- Next Monday and Tuesday (29-30.11) is dedicated to the ramp-down of the accelerator and photon systems and from Wednesday 01.12 it is the start of the Maintenance period.
CTRL:
- Nothing to report.
DA:
- P. Schmidt informs that instruments noticed early in the morning some issues with calibration.
DA is catching up to make it stable again (it relates to the new measure/state for the expected high data on this week). Please contact DOC if issues can't be solved by staff instrument.
EEE:
- Nothing to report.
VAC:
- Not present.
XPD:
- SA2 Filter interlock is put back (EPS limit of 300 bunches).
DET:
- DSSC cooling system issue (reported at SCS operation e-log): chiller had an alarm due to low level of coolant. The detector was stopped; chiller was refilled and brought back to operation; it seems to be
fine.
DET is investigating why the level had dropped. SCS is also investigating if it relates to a leak or low temperatures. Monica T. is in contact with Jan-Torben D.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Nothing to report.
SPB:
- Confirm that data will be taken also during the night.
FXE:
- Nothing to report; happy with beam performance.
MID:
- Organizing to get a training for the compressor to be able to switch it off when this is not needed.
HED:
- User onsite at the end of the week.
SCS:
- PLC-1 crashed on Monday taking time away for the experiments. A fan went off. Patrick G. says this is recognized that the fan went off and some cooling had to be switched down.
The maintenance of cooling systems is done by TS and it relates to a closed/sealed rack that can't exchange heat.
A solution permitting to spot/alarm when issues with cooling system appears in the racks must be put in place.
SQS:
- Nothing to report. Users are expected this week. |
368
|
24 Oct 2022, 09:47 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 24.10.2022 |
General Announcement:
- Processing of the maintenance tasks lists is delayed but effort in background is ongoing. Lists will not be published next Friday and scheduling meetings will take place during this and next week.
The release will take place on November 11th.
- As PRC, A. Galler says that nothing major is to report apart of the laser interlocks issues on Thursday and Saturday, fixed either by SRP or the instruments.
- A. Galler inform on the e-mail sent to the xo-info@xfel mailing list on the the beam quality device at Karabo. Instruments are very much invited to use it at least once per shift or when beam conditions
change.
CTRL:
- Nothing to report.
DA:
- Nothing to report.
EEE:
- Having group retreat today but OCD is available.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing major to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Incidents: AMPHOS was OFF in SA3 - reason not fully understood but OCD has brought it up again.
UNSYS:
- Nothing to report.
SPB:
- Last week's Extra-foam issue with AGIPD was solved by DOC.
FXE:
- Problem with calibration of Jungfrau: it was fixed but an issue still remains. DET will discuss together with Calibration team.
- Question regarding the He gas supply: A. Galler in forms there is no new supply apart of what was received two weeks ago. The central supply must have around 40 bars as of today.
MID:
- All fine at MID.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Nothing to report. |
352
|
24 Aug 2022, 09:28 |
Andreas Galler | General | Information | Notes XO Integration Meeting 24.08.2022 |
General Announcement:
CTRL:
DA:
EEE:
- actions from Monday (SA3 PLC master update, PNACT testing) successful
VAC:
XPD:
DET:
ITDM:
XRO:
LAS:
UNSYS:
SPB/SFX:
FXE:
MID:
HED:
- undulator setting off by 100 eV --> HED had means to accurately measure the delivered photon energy and compensate for that.
SCS:
SQS:
DRC
PRC
|
154
|
24 Aug 2020, 11:39 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 24.08.2020 |
General Announcement:
- The safety rules require the use of masks when moving around as well as the limitation on the number of allowed people per room.
XO asks people to stick to rules of 1 person per office as well as using masks when working closely.
CTRL:
- Few minor issues during the weekend. Major one related to SQS optical spectrometer which did not reach 10 Hz.
- Today an upgrade in the archiving system will take place. The update of timing servers for all SASEs will take this afternoon.
The property “bunch pattern table” will not be filled anymore.
DA:
- Few OCDs calls were all manageable. DA reminds instruments and groups to let system online to be monitored.
EEE:
- One OCD call during the weekend.
- Cabling with Detector group to happen.
- EEE asks if the SA3 interlock/pre-absorber will be tested today.
VAC:
- Nothing to report.
XPD:
- There was a problem with XTD2/SA1 graphite filter accordingly to Operation E-log entry. Maybe it got damaged between 20. and 21. This will be further investigated
between XPD and SPB/SFX.
DET:
- 1 OCD call which was easily solved.
ITDM:
- Friday the Scratch system (for temporary data) was out of space and data were removed (70Tb). It may be a problem again and ITDM would like to remind people to keep
data only for short time.
There is 1.5 Petabytes storage with currently only 60Terabytes free space.
- An e-mail about this issue was sent to a distribution list stating that from 01/09 data will be removed. ITDM asks people to clean their data in the proposals
directories.
XRO:
- Preparing for ZZ accesses in XTD2 and in XTD10.
LAS:
- SA1 laser is temporarily fixed with stable operation during the weekend. It required changes in software. This PP-laser is working and further exchanges are postponed.
- LAS reminds that OCD calls regarding timing synchronization between laser pattern and beam must be addressed with CTRL OCDs.
- Jan G. offers assistance with 5Hz operation on diagnostic cameras. A. Galler suggests to include also EEE and CTRL in discussions.
UNSYS:
- Nothing to report.
SPB:
- Graphite issue: inserted on Tuesday for 15 keV and was in the beam for 4 days until Saturday. J. Gruenert says this is not wrong. An e-log entry was done by Romain
Letrun.
- 1MHz images in camera worked during the weekend.
FXE:
- Issues: 1. Electron bunch arrival monitor recording did not work; 2. When SASE3 changes to many bunches, then FXE sees decreased intensity; 3. PP-laser seems not
suitable for our operation.
- For #1, ITDM will have a look in it; For #2, this will be discussed with machine; For #3, further discussions will happen in separate meeting.
MID:
- No issues: Split delay line is under commissioning. It was quite successful week.
HED:
- Successful week.
- The shot on demand feature was tested with EEE and CTRL.
SCS:
- Issue with saving sample position.
SQS:
- SA1 and SA3 interactions: FXE suffers when we have many pulses. M. Meyer proposes to have discussion with machine.
A. Galler proposes to discuss during the machine meeting at 10AM and asks for additional info per e-mail. |
533
|
24 Jul 2024, 09:29 |
Andreas Galler | General | Information | Notes XO Integration Meeting 24.07.2024 |
General Announcement:
-
CTRL:
- last bring up days
DA:
- minor issues fixed during bring up days
EEE:
- nothing
VAC:
- nothing
XPD:
- SA1/2 HiREX working
- Diamond detector small isue
DET:
-
ITDM:
- nothing
XRO:
- ramp up mostly completed --> reports send to all Instruments
- SA3 monochromator back in operation
LAS:
- SA1 all good automatic peak integration of dynamic trigger is being implemented
- SA3: 600 uJ short
UNSYS:
- SA2 cell 10 issue
- EtherCAT communication with
SPB:
- JF4M:
- last week tghe power supply stopped working, with help of DET and EEE the MPOD was made working, hower read out boards would not power trigger
FXE:
- nothing
MID:
- no big isues with bring up days, vacuum is ok
HED:
- JF issue was solved yesterday with replacing the board
SCS:
- bakeout commecning
SQS:
-
SXP:
- |
437
|
24 Jul 2023, 09:49 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 24.07.2023 |
General Announcement:
- Machine still works in improving performance. News will be posted at xo-info.
- Mikako M. And Idoia F. presented the summary of photon commissioning activities for SA1, SA2 and SA3:
SA1: https://in.xfel.eu/elog/XRO+Beam+Commissioning/206
SA2: https://in.xfel.eu/elog/XRO+Beam+Commissioning/186
SA3: https://in.xfel.eu/elog/XRO+Beam+Commissioning/201
CTRL:
- Last week prioritized work with bring up days at instrument workplaces.
DA:
- Bring up days last week; everything went smooth.
EEE:
- Bring up days went well.
VAC:
- Nothing to report.
XPD:
- Everything is fine with Diagnostics.
DET:
- Bring up days went fine.
ITDM:
- Dcache update taking place tomorrow for two days (old data affected). GPFS storage works as usual.
XRO:
- Handover to be explained after the meeting (see above).
LAS:
- Nothing to report.
UNSYS:
- Everything is fine.
SPB:
- Bring up days went well and some minor issues are being worked on.
FXE:
- Nothing to report.
MID:
- All fine at MID.
HED:
- Quick ZZ today to XTD6 to verify camera motors.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Not present. |
524
|
24 Jun 2024, 10:11 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 24.06.2024 |
General Announcement:
- Eric Boyd and Torsten Schoen: work by MPS / Wille company in SA3 radiation protection hutches will trigger emergency OFF button on Wednesday. Rack rooms connected to these hutches are also affected.
Decision if task takes place to be done after internal discussions between parts. XO will coordinate together with Eric Boyd.
CTRL:
- Start with summer maintenance: today with SA1 area.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Not present.
XPD:
- Not present.
DET:
- Nothing to be reported.
ITDM:
- Continuing with maintenance activities: today Maxwell cluster is updated; all activities are going accordingly to the plan.
XRO:
- Not present.
LAS:
- Nothing to report.
UNSYS:
- Not present.
SPB:
- Nothing to report.
FXE:
- Not present.
MID:
- Nothing to report.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Not present. |
136
|
25 Jun 2020, 10:27 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 24.06.2020 |
General Announcement:
- Exceptionally next Friday the XO Intergration Meeting will not take place. The meeting will resume next Monday.
Please send us an e-mail to xo@xfel.eu in case of any issue.
- Details on the Interlock Tests:
1. D3/SRP has the responsibility to carry on the tests;
2. TS and XO (communication) are supporting groups;
3. There is no rehearsal date;
4. Tests on the Instruments/SASE wll take place on July 1st, 2nd and 3rd (reserve date);
5. Access to the instruments and optics hutches is forbidden;
6. Access to the laser rooms are not restricted, apart from the HED laser which needs clarification;
7. Emergency off will be disabled on July 1st at 08:00AM. As soon as the emergency offs are tested, they can be enabled again;
8. The participating EuXFEL Radiation Protection Officer can inform the instruments as soon as tests are ready with the respective SASEs for resuming access and work.
- Maurizio V. and Nerea J. mention that an EPS check must be scheduled prior beam delivery. XO will check with Zunaira/SRP on its status.
- Suren K. points the PKG in SA3 undulators is still switched off. TS shall switch it on prior tunnel closure.
- Suren K. asks on tunnel access for next weekend. XO states tunnels will be put in Interlock tomorrow (June 25th) and shall remain interlocked until the next shutdown.
Access to XTD6, XTD9 and (maybe) XTD10 can be done for few days after the interlock tests. Access to all other tunnels must be via ZZ.
Tunnels will not be open for the weekend. (after the meeting DESY/MXL confirms this procedure).
CTRL:
- Nothing to report.
DA:
- Working on small requirements with the instruments.
EEE:
- SA1 VAC signal's issue from last Monday: it has been fixed. There was problems related to filter in the train-ID communication: the addresses were not properly set.
- Cabling is ongoing on SCS; HED cabling waits for time/schedule for installation (to be discussed between EEE and HED);
Cabling works ongoing with DESY-MPS which connect MID to PPS.
VAC:
- Closing the activities - SA1 VAC signals are OK.
XPD:
- Nothing to report.
DET:
- XO asks for an status on the MID/AGIPD train-ID issue from last Monday. S. Aplin and K. Wrona say it has to be further investigated as is not clear where the problem
lays.
The DAQ gets data from AGIPB, DOOCS, Karabo, labelled with train-ID and the labeling have to be checked for consistence. This is not a new issue and has to be addressed
in the frame of data reduction.
- A clear independent signal has to be also checked. P. Gessler says it is needed to get various patterns for a complete understanding. A clear strategy to develop and
address has to be made.
- S. Aplin will overlook the efforts among different groups.
ITDM:
- DAQ installations: this morning a fix for big detectors is done; after leaving DAQ for longtime there are some issues that will be fixed next week.
- Majority of acceptance tests are done - slow data is fixed.
XRO:
- Everything is done. The last check on tunnels was performed.
LAS:
- Nothing to report.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- Finished with the tunnel components check.
SCS:
- Nothing to report.
SQS:
- Nothing o report. |
421
|
24 May 2023, 09:50 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 24.05.2023 |
General Announcement:
-
CTRL:
- Not present.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Everything working fine.
DET:
- Not present.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- PP-lasers are back and running. All fine.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- Issue with clipping the beam was found and relates to a combination of devices.
- Progress is being made for user experiment.
HED:
- Preparation for next week ongoing.
- Needs to get in contact with RCs for next Monday tuning.
SCS:
- Preparing the THz setup for beamtime.
SQS:
- Nothing to report.
SXP:
- Used beam yesterday for commissioning KB. |
509
|
24 Apr 2024, 09:49 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 24.04.2024 |
General Announcement:
-
CTRL:
- Broker incident on SA2 and LAS topics last Saturday: update to be done in a split mode;
SA2 topic could not be done yesterday so is planned for Tuesday 30.04 morning and LAS topic to be done still this week as none uses PP-laser.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Everything fine;
- SA2 FEL IMG issue: linked mainly to a bridge connection to DOOCS (left over from broker issue on Saturday). Restart it only yesterday and not during the weekend.
DET:
- Nothing major;
- Feedback from Jungfrau test at SPB last week: unfortunately, did not fully run as expected as user Bragg magnifier scene was optimized at 10keV and not 21keV.
Nevertheless, data could be seen and it was useful to have beamtime.
ITDM:
- On EXFEL Gateway: need to apply a fix and update security; an e-mail will be sent for scheduling on next Tuesday.
XRO:
- Not present.
LAS:
- Nothing to report.
UNSYS:
- Everything fine.
SPB:
- Nothing o report.
FXE:
- Problem with middle layer server reported to DOC this morning. It seems solved after server restarted.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Issue with detector/data found last week and on the way to be fixed for next week. |
413
|
24 Apr 2023, 09:53 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 24.04.2022 |
General Announcement:
- Two cryo events happened last week: one Friday morning 03:30AM and one on Saturday evening. Machine has fully recovered by now. First event was caused by a ceramic bearing of the cold compressor.
- Power glitches were reported at Desy last few days but it seems that no equipment was impacted at XFEL. In case you see differently, please contact XO and TS.
- Next Friday 28.04 it is the deadline for submitting the summer maintenance task list.
CTRL:
- DOC shift was in place until this morning to help from recovery of the cryo events.
DA:
- Quiet week for OCD.
EEE:
- Issues that appeared are being followed by EEE.
VAC:
- All fine with VAC.
XPD:
- No issues with XPD.
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- SA2 PP-laser was back running and fine.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- Joerg H. will get in touch with XRO / Maurizio V. on a beam clipping issue (originated at the end of MID branch).
- HXRSS was recovered fast during last week.
HED:
- Nothing to report.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Nothing to report. |
113
|
24 Apr 2020, 13:48 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 24.04.2020 |
Relaxation control network:
- CTRL and XO remind the groups to submit the planned activities on e.g. scenes, projects, until Fridays.
- For next week case: please limit any hardware change. Reason is the current limitation on the physical presence of staff.
Groups will support only emergency and priority tasks. From May 4th the situation will be different.
- However, we do not want to stop any progress on activities. This also includes work on Karabo that affects critical work like VAC in tunnels.
Tunnel access for the coming weeks:
- A scheduling plan will be made due to the restrictions of allowed people working on tunnel at the same time.
Plan will be made in order to respect safety rules and minimize number of people working in tunnels.
- Tunnel access will be a first agenda point from next week.
General:
- For next meetings, we will continue with the small report from the support and instrument groups.
- Tasks to happen in the hutches are decided by the groups. XO/PMO plan tasks in tunnels.
- We encourage groups to start as earlier as May 4th the tasks which were originally planned to be conducted during the summer shutdown.
If it needs tunnel access, then one must respect the coming schedule.
- XO is looking together with Desy on all tunnel activities. A schedule is being prepared and will be communicated to the groups as soon as possible.
- In case of delay of activities due to e.g. excess of people in tunnel, prioritization will be made together with XO and Desy. |
598
|
24 Mar 2025, 09:42 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 24.03.2025 |
General Announcement:
- A. Galler informs that on Friday there is the LIMP meeting organized by Martin Doering. Please contact him in case of questions. Information will be transmitted to people who does not attend it.
- As PRC, A. Galler mentions the SXP laser shutter issue happened on Saturday (see SXP).
- As DRC, David Lomidze informs it was a quiet week.
CTRL:
- Nothing to report.
DA:
- Not present.
EEE:
- Issue with CRL lenses in XTD2 with a stuck motor. A ZZ is needed tomorrow if possible to fix it.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM:
- Problems with GPFS system still in investigation.
XRO:
- Nothing to report.
LAS:
- Not present.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report.
FXE:
- Data were collected; CRL got stuck.
- Pulse energy decreased ~20% every day and recovered in the morning; Also when SA2 changed number of pulses.
- uTCA crate crashed and a ticket is sent to EEE, together with DOC being called.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Not present.
SXP:
- Saturday problem with Laser interlock related to AMPHOS shutter. A quick fix was found by PRC and Pouneh S.
- Responsibility for AMPHOS shutter will be discussed with LAS. |
210
|
24 Mar 2021, 10:06 |
Frederik Wolff-Fabris | General | Information | Notes XO Integration Meeting 24.03.2021 |
General Announcement:
-
CTRL:
- In SA2/HED few interlocks are protected and not altered. CTRL needs to re-start the HEDloop1 and HEDcryo loop and SA2 EPS loop. It takes about 5-10 minutes without PLC
restart.
Suggestion is to make it today: XO will communicate to HED.
- When submitting a ticket, please include the device ID on it.
DA:
- Not present due to training.
EEE:
- Nothing to report.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Problem with SPB Jungfrau: M. Sikorski says the chiller was OFF and two modules are misbehaving. One can’t be fixed now and cards are ordered and have to be replaced.
The Chiller went OFF manually. It may become protected by EPS.
ITDM:
- Nothing to report.
XRO:
- Not present.
LAS:
- SA1 and SA2 PP-lasers are fine;
- In SA3 still ongoing due to small problem of missing train-IDs in ADC cards. Consequently, no DAQ data can be taken for SCS and SQS.
Nevertheless, the laser is ready for SCS use (not yet available to SQS).
UNSYS:
- ZZ for the cell36/SA1 took place on Monday. The problem related to a coupler (spare parts are available and were replaced). It is fixed.
SPB:
- Start with data collection. Aside from detector, no other issues.
FXE:
- Nothing to report.
MID:
- All fine.
HED:
- Not present.
SCS:
- A problem was found on Monday regarding the door interlock.
Zunaira A. comments that during a hutch search training it was found that a switch off (red button /panic switch) was pressed and did not release the magnet locks.
SRP has contacted a company and they have to come in to fix it.
Zunaira A. sends another instruction to SCS staff in how to proceed in case of emergencies (one has to open door manually).
SQS:
- Nothing to report. Panic button at SQS works normally. |
590
|
24 Feb 2025, 09:26 |
Andreas Galler | General | Information | Notes XO Integration Meeting 24.02.2025 |
General Announcement:
-
CTRL:
- nothing major
DA:
- nothing major
EEE:
- DOC call wrt AGIPD, possibly chiller
VAC:
- nothing
XPD:
- PES in XTD10, prevcauum got worse now at 6x10E-1 mbar.
DET:
- MID AGIPD chiller issue being investigated
ITDM:
- nothing to report
XRO:
- nothing major
LAS:
- not present
UNSYS:
- nothing to report
SPB:
- SPB useres request more computation nodes on Maxwell
FXE:
- issue with PicoMotors over the weekend, already solved
MID:
- issues with cryo jet --> vacuum problem triggered warm up of AGIPD
- during warm up there was ice formation in the Silicon oil, but after resolving the AGIPD could be cooled down again.
- seeeding looks ok
HED:
- all good
SCS:
- not present
SQS:
- not present
SXP:
- nohting, all set
SRP
- SQS couldn't open AMPHOS shutter, however resetting the AMPHOS interlock box solved the issue
- Eric informs on CRL1 seps issue to bfixed in tomorrows ZZ. |