  451   13 Sep 2023, 09:49 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 13.09.2023
General Announcement:
- The current week is the long delivery beam week for instruments. Operation continues up to next Wednesday 20.09 at 7AM. The DRC, PRC and RC will change as usual on Monday 18.09.

CTRL:
- Nothing to report.

DA:
- Not present.

EEE:
- Different problems with digitizers being addressed: 1. At XPD/ PES (card not working, it is then disabled); 2. FXE with jitter scene; 3. SQS is solved (undulator panel).

VAC:
- Everything good.

XPD:
- Apart of issues with PES nothing to report.

DET:
- Nothing to report.

ITDM: 
- At a retreat.

XRO:
- Nothing major to report.

LAS:
- Not present.

UNSYS:
- Not present.

SPB:
- Everything fine.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
  450   11 Sep 2023, 09:47 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 11.09.2023
General Announcement:
- A Cryo issue taking place in the night Fri-SAT lead to beam not being delivered since them. The failure was at a magnetic bearing with a misreading of motor position. 
In parallel motors 3 and 4 were exchanged as preventive measure during this downtime. Cryo OK came back on Sunday afternoon and efforts are focusing in bringing machine up for cw37.

CTRL:
- Pulse on demand for FXE (main scene) will be updated today.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Not present.

DET:
- Nothing to report.

ITDM: 
- Not present.

XRO:
- Change middle layer for the bunch patter at SA1 for fixing today.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Between Synchronization issue and cryo failure only a total of 6-7hs of data were collected.

SCS:
- Beamtime affected by cryo failure.

SQS:
- Nothing to report.

SXP:
- Nothing to report.
  449   06 Sep 2023, 10:03 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 06.09.2023
General Announcement:
-	 

CTRL:
- Issues with cameras are being addressed.

DA:
- Nothing to report.

EEE:
- Yesterday issue with SEPS/HED being investigated/addressed.

VAC:
- Not present.

XPD:
- Nothing to report.
- As PRC, Naresh K. reports 1: new SEPS interlock at HED not properly working; 2. FXE reported crosstalk from SA3 pulses being lasing at SA1; also when switching 0 pulses in SA1 the SA3 went to zero also. 

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Mikako M. is aware of HED SEPS issue and is helping EEE.

LAS:
- Nothing to report.

UNSYS:
- SA2/cell25 fixed (terminal replaced) and is functioning.

SPB:
- Nothing to report.

FXE:
- Crosstalk SA1/SA3.

MID:
- Not present.

HED:
- Issues with ADC fixed by EEE (rear module) - seems a recurring feature with a 1 week frequency.

SCS:
- Motors at ending station solved by DOC;
- Issue with bunch/crosstalk. 

SQS:
- Nothing to report.

SXP:
- Not present.
  448   04 Sep 2023, 09:46 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 04.09.2023
General Announcement:
- Last week was a facility development week / blue week. Another cyo issue happened on Friday morning which was recovered quickly.
- As DRC, Steffen H. reminds on the Jour-Fixe today at 13:00 to instruments communicate needed data allocation; also reminds on calling DOC may have a quicker help than sending a ticket.

CTRL:
- DOOCS clone devices disappearing from topics was fixed on Friday and since then works nicely.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Not present.

XPD:
- XPD involved in facility development since Friday. All activities went fine and more studies for Harmonic lasing and Aspect will be continued.
- J. Gruenert mentions for cw38 XPD and XRO colleagues are in Trieste for a conference and only limited staff is available for support. Basic functionality of devices is guaranteed.
- REXX servers were down last week. 

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Message to SA2 instruments: last week the Euler calibration was done for M1 and M2 and instruments can make use. The link is on the main mirror scene and the SA2 scene will be updated.

LAS:
- Nothing to report.

UNSYS:
- Issue with cell 25/SA2 terminal: undulator could not be used for harmonic lasing. Needs access for fixing.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- During the blue week it repaired the long arm for detector angular motion.

HED:
- Issues with IDC on rear module; EEE is working on it.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
  447   30 Aug 2023, 10:55 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 30.08.2023
General Announcement:
- Facility development week is ongoing.
- After the cryo incident last weekend the machine colleagues have an impression everything is in good shape and next tuning day can be made on Monday. 
- Next UOM will have an invitation for instruments to briefly report on jitter issues (pointing, temporal, etc) that impact performance from last weeks. 
If you have found any jitter issues please mention it during the UOM for discussion with machine colleagues.

CTRL:
- Today 13:00 new version for the DOOCS devices will be deployed for undulator controls. It takes 2-3 minutes.
- Follow up of PP-ODL devices: Wajid E. will right a ticket to DOOCS colleagues.

DA:
- Nothing to report.

EEE:
- Yesterday a SA2 SEPS interlock was updated and tested with XRO group and it went fine.

VAC:
- V0 closed after the SA2 loop update which was promptly re-opened.

XPD:
- Nothing to report.

DET:
- Not present.

ITDM: 
- Upgrade of GPFS was finished yesterday successfully.

XRO:
- SEPS interlock update in SA2 worked well.
- One issue: communication to DOOCS was unstable in the early afternoon. Late on the day it was better.

LAS:
- Nothing to report. All fine.

UNSYS:
- At 15:30 a ZZ will be done to fix 3-way valve at SA2/cell4.
- Issues with MARWIN robot in SA3 and A. Leuschner will make a ZZ for fixing it.

SPB:
- Small issues on last THU and MON related to middle layer device and macros. DOC is informed and have recognized it. Further investigation in the particular macro that may can cause the issue. 

FXE:
- Preparing for next week.

MID:
- All fine at MID.

HED:
- Nothing special; preparing next experiment.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
  446   23 Aug 2023, 09:47 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 23.08.2023
General Announcement:
- Next Monday, 28.08 there is no XO Integration Meeting due to agenda unavailability of XO. 

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Not present.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Tri way valve SA2 cell4 causing warm water in vacuum chamber which drifts the gap for few um. To be fixed in a shutdown.
- Cell25/SA2 feedback of temperature sensors is solved.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Waiting for beam. Tuning under way.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
  445   21 Aug 2023, 09:26 Andreas GallerGeneralInformationNotes XO Integration Meeting 23.08.2023

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing major

EEE:

  • nothing major

VAC:

  • nothing to report

XPD:

  • nothing

DET:

  • nothing major 

ITDM: 

  • nothing major

XRO:

  • nothing major

LAS:

  • nothing to report

UNSYS: 

  • nothing to major
  •  

SPB/SFX:

  • due techincal issues no beamtime

FXE:

  • not present

MID:

  • nothing to report

HED:

  • not enough intensity to pump samples
    • experiment was a partial succes

SCS:

  • nothing to report

SQS:

  • nothing to report

SXP:

  • not present

DRC

  •  

PRC

  •  
  444   16 Aug 2023, 09:24 Andreas GallerGeneralInformationNotes XO Integration Meeting 16.08.2023

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing major

EEE:

  • nothing 

VAC:

  • nothing

XPD:

  • nothing 

DET:

  • nothing

ITDM: 

  • nothing

XRO:

  • nothing

LAS:

  • nothing

UNSYS: 

  • nothing

SPB/SFX:

  • Issue with Hexapod of sample changer.

FXE:

  • not present;
  • frequent error with PPODL, locked station --> investigated by CTRL (wajid)

MID:

  • Julabo chiller
    • switching off recurrenlty

HED:

  • nothing to report

SCS:

  • nothing to report

SQS:

  • nothing to report

SXP:

  • not present

DRC

  • nothing

PRC

  • nothing
  443   14 Aug 2023, 09:30 Andreas GallerGeneralInformationNotes XO Integration Meeting 14.08.2023
General Announcement:

CTRL:
- nothing to report

DA:
- Nothing to report.

EEE:
- Motor issue with SPB
PLC is investigating

VAC:
- All running fine.

XPD:
- Everything fine from XPD.

DET:
- Nothing to add.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Everything is fine.

SPB:
- see motor issue EEE

FXE:
- nothing to report

MID:
- Julabo Chiller
    switched off by itself --> curculation stopped
    AGIPD not harmed

HED:
- nothing to report

SCS:
- Nothing to report.

SQS:
- Nothing to report

SXP:
- Nothing to report

 

 

  442   09 Aug 2023, 09:43 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 09.08.2023
General Announcement:
- Starting this semester, a jitter report will be started at the UOM on the blue weeks. 
Instruments are kindly requested to make a 2-3 mins report on experience with jitter for the previous few weeks, especially in relation to instabilities with beam.

CTRL:
- Issue at HED with Jungfrau detector module2: workaround is put in please and seem to work fine. Also issue looks like to be specific only to this module / detector controller. 
Once experts return from holidays more investigation will be done.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- All running fine.

XPD:
- Everything fine from XPD.

DET:
- Nothing to add.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Problem with SA3/cell9 got stuck (third time). Not clear if it is a mechanical or control system issue. Further investigation during the winter maintenance period. 
Error is currently fixed and undulator is running.

SPB:
- Nothing to report. PCS experiment is running well.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Will get in touch with CTRL to discuss Detector fix.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Nothing to report.
  441   07 Aug 2023, 09:50 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.08.2023
General Announcement:
-  A. Silenzi is the DRC for this week and will send an e-mail to instrument local contacts for the jour-fixe meeting this afternoon.

CTRL:
- Movement issue in SA3 watchdog: after splitting the system it became more stable and will monitor it for next days.
- HED reported a bug with Jungfrau and will deploy the fix today.

DA:
- Nothing to report.

EEE:
- Follow up of a problem in SQS rack room (grounding): it was corrected in Thursday and now everything is fine.

VAC:
- Nothing to report.

XPD:
- Solution from CTRL to watchdog in SA3 is working fine.

DET:
- AGIPD at SPB: the chiller for cooling electronics (not the Julabo) failed. Investigation shows that interlock worked well and further investigation to be done after replacement.
- Jungfrau module2 needs work at HED and will be followed up.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Sunday morning issue with SA1 PP-laser that shutdown the AMPHOS. It was brought up by OCD at the same day. 
- Need to coordinate with EEE on crate work for SA2.

UNSYS:
- All fine with Undulators systems.

SPB:
- Issue with AGIPB: there is a spare to be changed and further investigations to be done.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- All fine with beam last week.
- Ticket is ongoing to solve issue on Jungfrau for next week. Wajid E. says a deployment will be made this week.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Nothing to report.
  440   02 Aug 2023, 10:12 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 02.08.2023
General Announcement:
- Status of machine: a lot of work was done last days on laser injector and RF jitter; all seems to be OK and improvement were done. 
Concluded that electron beam shape is now Gaussian and right now SASE is being tuned. Aim is to have about 2mJ in SA1 and 1mJ in SA2 at 9keV. Beam to be handled to the instruments on Thursday morning, as 
planned.
- MID HED asked on use of HXRSS this week/next week. To be discussed at the daily Ops meeting today.

CTRL:
- Investigating the MOV loop in SA3 watchdog. 

DA:
- Nothing to report.

EEE:
- Routine checks in rack for instruments (currents for ground lines). One rack presented an issue and today there is a plan to disconnect the wrong wiring line and a second power will be installed. 
No impact shall be seen on motors using 40V at SQS.

VAC:
- Nothing to report.

XPD:
- If HED or MID goes to use seeding then N. Kujala has to setup the Hirex.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Progress in SA1 PP-L going well.

UNSYS:
- Error in gap of SA1 cell 10 undulator. It seems to be fine now.

SPB:
- Preparing for the shifts from tomorrow.

FXE:
- Nothing to report.

MID:
- Will discuss with HED on the using of beam for next 2-3 weeks.

HED:
- Nothing to add.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Nothing to report.
  439   02 Aug 2023, 09:27 Andreas GallerGeneralInformationNotes XO Integration Meeting 31.07.2023

CTRL
    - still investigating the slowness in SA3 --> which wtachdog is repsonsible
DA:
    - not present
EEE:
    - nothing to be reported

VAC
    - nothing major to report
XPD:
    - part of slownwss in SA3 response team with CTRL

DET:
    - nothinbg major, and despite beam qualityu some calibration data could be taken
iTDM:
    - wil investagete BSASLER 2 issues

XRO:
    - nothing major
LAS:
    - SA1 AMPHOS service finsihed
    - NOPAs are being brought up

    SA3:
        - spurious switch off of seeder over the weekend, but could be brought up
        - comment on LASERMET 
UNSYS:
    - last week issue with cel9 SA3, undulator was not moving but isue solved

PRC:
    - beam was not super performing but some instruent tuning tasks could be done
    - SXP wanring light was broken and repaired on Sat
    - pointing difference between SQS and SCS leads to delays in tuning by the machine
        - the beam should be on the crosshair, and if that needed to be changed XPD can do that easily.
    - SA1 FEL imager stalled on Sunday -->

SPB/SFX:
    - beam could be used over the weekend, but only calibration constants could be taken or AGIPD

FXE:
    - nothing to report

MID:
    - beam was used and to a major fraction this was succesful

HED:
    - the planned program could be done

SCS:
    - nothing to report
SQS:
    - 
SXP:
    - PPLASER couldn't be used

  438   26 Jul 2023, 09:21 Andreas GallerGeneralInformationNotes XO Integration meeting 26.07.2023

General Announcement:

  • The injector Laser Window had been exchanged yesterday and currently leak search is ongoing. Tuning is expected to start around lunch time. 

CTRL:

  • nothing major to report

DA:

  • not present

EEE:

  • nothing mjor to report

VAC:

  • same

XPD:

  • nothing

DET:

  • nothing

ITDM: 

  • nothing

XRO:

  • nothing

LAS:

  • PPLAS in SA1 will not be ready this week
    • hopefully finished by the end of this week
      • please conatct Radu for continuous updates

UNSYS: 

  • Everything is fine

SPB/SFX:

  • Nothing to repoert ready for beam

FXE:

  • same

MID:

  • same

HED:

  • some

SCS:

  • nothing

SQS:

  • not present

SXP:

  • nothing

DRC

  • nothing

PRC

  • nothing
  437   24 Jul 2023, 09:49 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 24.07.2023
General Announcement:
- Machine still works in improving performance. News will be posted at xo-info.
- Mikako M. And Idoia F. presented the summary of photon commissioning activities for SA1, SA2 and SA3:
SA1: https://in.xfel.eu/elog/XRO+Beam+Commissioning/206
SA2: https://in.xfel.eu/elog/XRO+Beam+Commissioning/186
SA3: https://in.xfel.eu/elog/XRO+Beam+Commissioning/201

CTRL:
- Last week prioritized work with bring up days at instrument workplaces.

DA:
- Bring up days last week; everything went smooth.

EEE:
- Bring up days went well.

VAC:
- Nothing to report.

XPD:
- Everything is fine with Diagnostics.

DET:
- Bring up days went fine.

ITDM: 
- Dcache update taking place tomorrow for two days (old data affected). GPFS storage works as usual.

XRO:
- Handover to be explained after the meeting (see above).

LAS:
- Nothing to report.

UNSYS:
- Everything is fine.

SPB:
- Bring up days went well and some minor issues are being worked on.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Quick ZZ today to XTD6 to verify camera motors.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Not present.
  436   19 Jul 2023, 10:25 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 19.07.2023
General Announcement:
- SEPS interlock tests are done in SA1 and SA2. It continues tomorrow in SA3 during the morning.
- Machine accelerator startup is ongoing. Photons are being produced and operators are working hard to improve conditions.
- When summer maintenance started in mid-June some instruments' staff were entirely gone and none were available to open hutches, which delayed some tasks. 
XO will have a look next maintenance into this issue.

CTRL:
- Proceeding with bring up days.

DA:
- Working on the bring up days.

EEE:
- Work with bring up days and support SEPS tests.

VAC:
- All normal with VAC systems.

XPD:
- Not present.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Starting today with ramp up.
- ZZ for M6 mirror in SA3 tomorrow morning.

LAS:
- Received report from Pouneh S. on the Lasermet events. 

UNSYS:
- All fine.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Busy at beamline.

SQS:
- Not present.

SXP:
- Not present.
  435   17 Jul 2023, 09:53 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 17.07.2023
General Announcement:
- SEPS interlock tests are taking place today. An e-mail was sent to xo-info last Friday containing information about the order of the tests.

CTRL:
- Start with bring up days (SCS and SXP today) the whole week.
- Workaround solution for PLC/Karabo was deployed but needs to be redone tomorrow at 8AM tomorrow. An e-mail will be sent to xo-info.

DA:
- Nothing to report.

EEE:
- Bring up days and support of SEPS. 

VAC:
- Nothing to report.
- As PRC, Martin D. says on Saturday morning issues with AIBS blocked beam operation. Solved by DRC and EEE/PLC OCD.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Data analysis of experiments (past ones): to be migrated on next week over three days. E-mail to be sent to xo-info.

XRO:
- Involved in the SEPS interlock today.
- ZZ for HED Mono was successful by power cycling device Not yet clear if camera is broken or a Karabo/PLC issue. 

LAS:
- Nothing to report.

UNSYS:
- All fine.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- PP laser work this week and then setting up beamtime for cw31.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
  434   12 Jul 2023, 10:18 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 12.07.2023
General Announcement:
- There were two power glitches last night observed at Desy which switched OFF some cooling water pumps. Please check your systems and let XO know if you were also affected.
- SEPS Interlock tests driven by RPOs with help from Maurizio V. and CTRL colleagues are now scheduled to take place on Monday 17.07 instead of tomorrow. 
This is because the required bunch patterns may not be provided by machine in due time this week. A tentative schedule for each instrument/SASE will be made in the coming day(s).
- Martin Doering mentions an e-mail was sent out to groups asking for the feedback on tasks that were postponed or cancelled. Please inform xo-planning if you have tasks in these situations.

- Steffen H. says starting today responsibility for the Data Acquisition services (Karabo devices and data group configuration) has been transferred from ITDM to CTRL. 
So CTRL will be the support contact together with DOC. A small task force develops the DAQ at CTRL. Please contact CTRL and Steffen H. in case of questions.

CTRL:
- Deploy Karabo beckoff loops due to some bugs at PLC side which affects communication at Karabo. Patch for Karabo was prepared and will be deployed today at 13:00 in SA1-2-3 the moving loops; downtime few 
minutes.
- Hardware intervention done by IT in replacing a mother board at SA3 which runns PLC loops. Takes longer (30 mins) to replace and restart Karabo. 

DA:
- Calibration team will migrate offline calibration to different nodes. No interruption of services. DET is informed.

EEE:
- Bug of PLC and work around by CTRL: bug was there before and now that makes issues (see CTRL). 
- MID: update of master loop as wished from MID.
- Next Monday busy with bring up days.

VAC:
- No impact of power glitch.

XPD:
- ZZ successful at XTD9 yesterday with Bassler cameras..

DET:
- Nothing to report.

ITDM: 
- Message from Luis: update of myMDC takes place.
- Power glitch: around 03:00-03:30 the cooling failed. At 604 around 20 servers switched OFF as cooling water went down (as prevention mechanism to mitigate temperature raises). Tomasz. P. is working to 
bring servers up.
- Tobias C. also confirms TS sees the 8C water was affected (which is used for the 20C water). 

XRO:
- Nothing to report.

LAS:
- SA3 laser was shut down yesterday due to Lasermet work. Pouneh S. says additional Lasermet works for today were then cancelled and no more work will happen in this maintenance.

UNSYS:
- 4 Quadrupoles are not moving and are under investigation.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Not present.
  433   10 Jul 2023, 09:30 Andreas GallerGeneralInformationNotes XO Integration meeting 10.0723
General Announcement:
- 

CTRL:
- Bring Up Days start next Monday

DA:
- DA and DET sessions are alwys the same days following CTRL and EEE

EEE:
- nothing to report

VAC:
- VAC is ready for beam

XPD:
- Nothing to report.

DET:
- Nothing to report

ITDM: 
- Nothing to report.

XRO:
- nothing to report

LAS:
- Nothing to report.

UNSYS:
- nothing to report


SPB:
- Couple of open things with crates --> EEE in discussion

FXE:
- Nothing to report

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Not present

SQS:
- Not present.

SXP:
- Not present.
  432   05 Jul 2023, 09:53 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 05.07.2023
General Announcement:
- Interlock tests are ongoing up to 12.07 (instruments area) and from 13.07 the accelerator restart with upstream devices.

CTRL:
- Nothing to report.

DA:
- Focusing in brink up days. All fine.

EEE:
- Bernard B. comments that rack room at FXE went power OFF. This morning TS / Torsten S. recovered the power in crates. No clear the reason of what happened. To be investigated.
- A. Galler asks Bernard B. on the 13.07 SEPS tests as additional device is present at SA2. Plan is prepared by Zunaira A. and he will check planning and get back to XO.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- No major news to report.

ITDM: 
- Nothing to report.

XRO:
- Activities are completed.
- At SCS exit slit there was a change of electronics: for the user point of view the motors are now moving in opposite directions and please remember situation is different from other exit slit.
- SA2 pitch motors in all 3 mirrors are now being driven by micrometers and not in millimeters. Scene is in preparation and during ramp up this will be checked and documented.

LAS:
- Nothing to report.
- Friday loss of power in SA3 is being reconstructed by Pouneh S. and will be communicate.

UNSYS:
- Undulator systems are operational.
- SA3: cell 15 and cell 17 have lost the linear encoder in the planar undulator. They are now operated by the rotary encoders. Probably it was finished to be damaged by power cycled and radiation damage 
together. 

SPB:
- Not present.

FXE:
- Intervention this morning on the cabinets. Reason for emergency power OFF not known.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.