Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 463     Entry time: 25 Oct 2023, 09:26
Author: Andreas Galler 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 25.10.2023 

General Announcement:

  •  

CTRL:

  • nothing major --> a couple of people on vacation, i.e. issue repsonse time may be a bit longer this week

DA:

  •  

EEE:

  • nothing

VAC:

  • nothing

XPD:

  • nothing to report

DET:

  • nothing

ITDM: 

  • not present

XRO:

  • nothing

LAS:

  • nothing 
  •  

UNSYS: 

  • nothing to report

SPB/SFX:

  • SA3 background affecting focussing of x-rays

FXE:

  • smooth, beam instability yesterday
    • horizontal jitter entagled with PopIn measurements --> around lunch time
    • beam was clipping and LPD was seeing poweder scattering from the collimator pipe

MID:

  • nothing to report

HED:

  • Yesterday evening unexpected venting in the CRL3 (HED-Optics Hutch) --> X-ray Operation cancelled at least for Wed night
    •  

SCS:

  • beam instability in pointing over night
    • this cuased non optimal beam transport --> pulse energy decreased on sample

SQS:

  • nothing to report

SXP:

  • everything is looking 

DRC

  •  

PRC

  • SA1 pulse energy will be lower than possible, because of XGM settings that need to cater 7.8 keV and 12.5 keV