SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 463
Entry time: 25 Oct 2023, 09:26
|
Author: |
Andreas Galler |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 25.10.2023 |
|
|
General Announcement:
CTRL:
- nothing major --> a couple of people on vacation, i.e. issue repsonse time may be a bit longer this week
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
XRO:
LAS:
UNSYS:
SPB/SFX:
- SA3 background affecting focussing of x-rays
FXE:
- smooth, beam instability yesterday
- horizontal jitter entagled with PopIn measurements --> around lunch time
- beam was clipping and LPD was seeing poweder scattering from the collimator pipe
MID:
HED:
- Yesterday evening unexpected venting in the CRL3 (HED-Optics Hutch) --> X-ray Operation cancelled at least for Wed night
SCS:
- beam instability in pointing over night
- this cuased non optimal beam transport --> pulse energy decreased on sample
SQS:
SXP:
DRC
PRC
- SA1 pulse energy will be lower than possible, because of XGM settings that need to cater 7.8 keV and 12.5 keV
|