Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 465     Entry time: 01 Nov 2023, 10:04
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 01.11.2023 
General Announcement:
- Jan G. as PRC comments: 1. reminds SQS and FXE instruments to place entries at the Operations e-log; 
2. machine is running well and ZZ accesses happened on Monday (hindered by issues with tunnel entrance) but all done; 
3. the XTD2 issue with upstream differential pump close to the XGM: one pump is defective and VAC will exchange if a ZZ is allowed next week.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- FSSS motor in MID: OCD received a call yesterday and device was restarted and came back to operation.

VAC:
- Not present.

XPD:
- Nothing to report from XPD.

DET:
- Nothing to be reported.

ITDM: 
- Nothing to report.

XRO:
- On the XTD10 ZZ last Monday: V-slit was checked and a faulty cable for the encoder was found. For the time being this was fixed by tapping it and will continue monitoring.

LAS:
- Nothing to report.

UNSYS:
- All fine with Undulator.

SPB:
- Nothing to report.

FXE:
- Beam was not stable the last night / down for few times. To be investigated internally at FXE and reported to XO.

MID:
- Roll motor for M2 mirror at tunnel was moving very slowly; to be seen with XRO.

HED:
- Nothing to report.

SCS:
- Nothing to report; working in hutch preparations.

SQS:
- Nothing to report.

SXP:
- Not present.