General Announcement:
- As PRC, A. Galler informs the machine runs without major issues but kicker adaptation has difficulties with 4.5MHz. For the next 20 mins machine colleagues will introduce stronger kickers and during
this time beam will be jittery at SA1/SA3. SA2 shall be unaffected.
During the meeting PRC received a call from BKR informing the intervention was done at 09:45 and stable beam is currently available.
- Martin Doering announces on the Winter Maintenance period:
1. The release of Maintenance Task List will happen tomorrow 16.11 and maintenance starts on 30.11;
2. Major topics:
Karabo (4-7.12 and 13.12),
DAQ and CTRL network interruptions (4-8.12),
Cooling water has no big interruptions planned apart of the regular maintenance with fluctuations in flow and temperature,
Electrical maintenance in XHQ (4-22.12) with rooms affected in different days,
electrical maintenance at XHEXP1 in 27.11-22.12,
Timing missing, smoke detector tests, laser interlock upgrades,
interlock test "light" (17.01);
3. Please check for precise dates on above at the Maintenance Task List.
CTRL:
- No announcements for CTRL.
DA:
- Nothing to report.
EEE:
- Nothing to mention.
VAC:
- Nothing to report.
XPD:
- Nothing to report.
DET:
- Nothing for DET and for DRC (Monica T.).
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Nothing to report.
SPB:
- Nothing to report apart of the Kicker issues.
FXE:
- Issues with Kicker as mentioned by the PRC.
MID:
- Nothing to report.
HED:
- Nothing to report. Tomorrow the switch to 24keV will take place and time has to be allocated for tuning.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Not present. |