SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
|
|
Message ID: 476
Entry time: 11 Dec 2023, 09:51
|
Author: |
Frederik Wolff-Fabris |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 11.12.2023 |
|
|
General Announcement:
-
CTRL:
- Last week updates on Karabo were done. Please check systems for functionality.
- Another update of data loggers will be done in coming days.
DA:
- Following the Karabo updates DA is checking their devices.
EEE:
- Suffering from illnesses in the group: colleagues that are not sick try to get all work done but some delay in some activities is expected in some areas;
- Also Wille company is suffering with sickness and they try to find substituted colleagues.
- Vacuum updates were fixed; plan to update of SA2 VAC was postponed from Friday to today.
VAC:
- Nothing to report.
XPD:
- Request to EEE when updates for XGM are to start, please inform Florian Dietrich and Jan Gruenert for that they prepare beforehand. After update is done one needs to restart vacuum and XGM.
DET:
- AGIPD at SPB/SFX intervention: replaced all modules; three attempts were needed and the situation is that detector is fully operational and all modules are working.
Also tests after Karabo deployment worked nicely. Next is a test with DAQ and everything looks very promising.
- At MID AGIPD: Bias issue is also fixed; tested at real conditions went successful. Cause was a wire.
ITDM:
- Most of the activities are done.
- Problem with exchange of switch in SA2 for DAQ collection: power supply had a problem but not only it, so new chassis will be delivered and needs to be replaced. DAQ connections for SA2 is not working.
XRO:
- Planned works are continuing and everything is going fine.
LAS:
- Nothing to report.
UNSYS:
- More two last Apple-X are being installed; from today Beckhoff technicians will connect the cabling.
- Issues with encoders are solved (radiation damage). Replacement was done and calibration was successful.
SPB:
- Nothing to report.
FXE:
- Nothing to report.
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Not present. |