| Group Selection Page
HELP
Controls Group
ITDM
DET
Vacuum
WP78
FXE
SPB
HED
SQS
SXP
Sample Environment
PSPO
XO
TS
Migrated2Zulip
Archived2GitlabPages
Archived2PDF
MigratedByGroup | 
| SCS
Photon Commissioning Team
XRO
DOC
WP74
MID
XO_mig
XO_Operation
SQS Migrated2Zulip | 
| Technical integration and coordination | 
| 
| Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther | Not logged in |  |  | 
|
| 
| Message ID: 464
    Entry time: 30 Oct 2023, 09:47 |  | | Author: | Frederik Wolff-Fabris |  | Location: | General |  | Severity: | Information |  | Subject: | Notes XO Integration Meeting 30.10.2023 | 
 |  | 
| General Announcement:
-	 
CTRL:
- No announcements for today.
DA:
- Nothing to report.
EEE:
- Nothing to report.
VAC:
- Issue with turbo pump in XTD2 (happened 22:30 yesterday). Getting in touch the PLC team. Maybe a ZZ is needed today.
XPD:
- Nothing to report.
DET:
- Nothing to report.
ITDM: 
- Nothing to report.
XRO:
- Open points from last week: vertical slit SA3 bottom (error); SRA in SA1 is currently in error. To be followed up if fixed or not.
LAS:
- Nothing to report.
UNSYS:
- Yesterday night problems in SA1 (XTD2): cell 2 motor drive problems; cell 11 power distribution terminal in cabinet; cell 14 bridge terminal problem; errors from cell#31 to downstream segments.
- Yesterday night possible to bring system operational at night; ZZ is ongoing to address above points. Extension of time for ZZ is unclear.
- Problems with central control node also observed. 
SPB:
- Nothing to report.
FXE:
- Not present.
MID:
- Nothing to report.
HED:
- Beamtime good.
SCS:
- Nothing to report.
SQS:
- Nothing to report.
SXP:
- Saturday lost synchronization with both lasers: promptly solved by PRC and LAS-OCD. |