Message ID: 464     Entry time: 30 Oct 2023, 09:47
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 30.10.2023 
General Announcement:
-	 

CTRL:
- No announcements for today.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Issue with turbo pump in XTD2 (happened 22:30 yesterday). Getting in touch the PLC team. Maybe a ZZ is needed today.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Open points from last week: vertical slit SA3 bottom (error); SRA in SA1 is currently in error. To be followed up if fixed or not.

LAS:
- Nothing to report.

UNSYS:
- Yesterday night problems in SA1 (XTD2): cell 2 motor drive problems; cell 11 power distribution terminal in cabinet; cell 14 bridge terminal problem; errors from cell#31 to downstream segments.
- Yesterday night possible to bring system operational at night; ZZ is ongoing to address above points. Extension of time for ZZ is unclear.
- Problems with central control node also observed. 

SPB:
- Nothing to report.

FXE:
- Not present.

MID:
- Nothing to report.

HED:
- Beamtime good.

SCS:
- Nothing to report.

SQS:
- Nothing to report.

SXP:
- Saturday lost synchronization with both lasers: promptly solved by PRC and LAS-OCD.