Notes XO Integration Meeting 18.09.2023, posted by Frederik Wolff-Fabris on 18 Sep 2023, 10:01
|
General Announcement:
- Differently from standard Mondays, today is a beam delivery day. The machine tuning day for cw38 takes place on Wednesday.
|
Notes XO Integration Meeting 13.09.2023, posted by Frederik Wolff-Fabris on 13 Sep 2023, 09:49
|
General Announcement:
- The current week is the long delivery beam week for instruments. Operation continues up to next Wednesday 20.09 at 7AM. The DRC, PRC and RC will change
as usual on Monday 18.09.
|
Notes XO Integration Meeting 11.09.2023, posted by Frederik Wolff-Fabris on 11 Sep 2023, 09:47
|
General Announcement:
- A Cryo issue taking place in the night Fri-SAT lead to beam not being delivered since them. The failure was at a magnetic bearing with a misreading of
motor position.
|
Notes XO Integration Meeting 06.09.2023, posted by Frederik Wolff-Fabris on 06 Sep 2023, 10:03
|
General Announcement:
-
|
Notes XO Integration Meeting 04.09.2023, posted by Frederik Wolff-Fabris on 04 Sep 2023, 09:46
|
General Announcement:
- Last week was a facility development week / blue week. Another cyo issue happened on Friday morning which was recovered quickly.
- As DRC, Steffen H. reminds on the Jour-Fixe today at 13:00 to instruments communicate needed data allocation; also reminds on calling DOC may have a |
Notes XO Integration Meeting 30.08.2023, posted by Frederik Wolff-Fabris on 30 Aug 2023, 10:55
|
General Announcement:
- Facility development week is ongoing.
- After the cryo incident last weekend the machine colleagues have an impression everything is in good shape and next tuning day can be made on Monday. |
Notes XO Integration Meeting 23.08.2023, posted by Frederik Wolff-Fabris on 23 Aug 2023, 09:47
|
General Announcement:
- Next Monday, 28.08 there is no XO Integration Meeting due to agenda unavailability of XO.
|
Notes XO Integration Meeting 23.08.2023, posted by Andreas Galler on 21 Aug 2023, 09:26
|
General Announcement:
CTRL:
nothing major
DA: |
Notes XO Integration Meeting 16.08.2023, posted by Andreas Galler on 16 Aug 2023, 09:24
|
General Announcement:
CTRL:
nothing major
DA: |
Notes XO Integration Meeting 14.08.2023, posted by Andreas Galler on 14 Aug 2023, 09:30
|
General Announcement:
CTRL:
- nothing to report
DA:
- Nothing to report.
EEE:
- Motor issue with SPB
PLC is investigating
VAC:
-
All running fine.
XPD:
- Everything fine from XPD.
DET:
- Nothing to add.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
-
Nothing to report.
UNSYS:
- Everything is fine.
SPB:
- see motor issue EEE
FXE:
- nothing to report
MID:
- Julabo Chiller
switched |
Notes XO Integration Meeting 09.08.2023, posted by Frederik Wolff-Fabris on 09 Aug 2023, 09:43
|
General Announcement:
- Starting this semester, a jitter report will be started at the UOM on the blue weeks.
Instruments are kindly requested to make a 2-3 mins report on experience with jitter for the previous few weeks, especially in relation to instabilities |
Notes XO Integration Meeting 07.08.2023, posted by Frederik Wolff-Fabris on 07 Aug 2023, 09:50
|
General Announcement:
- A. Silenzi is the DRC for this week and will send an e-mail to instrument local contacts for the jour-fixe meeting this afternoon.
|
Notes XO Integration Meeting 02.08.2023, posted by Frederik Wolff-Fabris on 02 Aug 2023, 10:12
|
General Announcement:
- Status of machine: a lot of work was done last days on laser injector and RF jitter; all seems to be OK and improvement were done.
Concluded that electron beam shape is now Gaussian and right now SASE is being tuned. Aim is to have about 2mJ in SA1 and 1mJ in SA2 at 9keV. Beam to be |
Notes XO Integration Meeting 31.07.2023, posted by Andreas Galler on 02 Aug 2023, 09:27
|
CTRL
- still investigating the slowness in SA3 --> which wtachdog is repsonsible
DA: |
Notes XO Integration meeting 26.07.2023, posted by Andreas Galler on 26 Jul 2023, 09:21
|
General Announcement:
The injector Laser Window had been exchanged yesterday and currently leak search is ongoing. Tuning is expected to start around lunch
time.
CTRL: |
Notes XO Integration Meeting 24.07.2023, posted by Frederik Wolff-Fabris on 24 Jul 2023, 09:49
|
General Announcement:
- Machine still works in improving performance. News will be posted at xo-info.
- Mikako M. And Idoia F. presented the summary of photon commissioning activities for SA1, SA2 and SA3:
|
Notes XO Integration Meeting 19.07.2023, posted by Frederik Wolff-Fabris on 19 Jul 2023, 10:25
|
General Announcement:
- SEPS interlock tests are done in SA1 and SA2. It continues tomorrow in SA3 during the morning.
- Machine accelerator startup is ongoing. Photons are being produced and operators are working hard to improve conditions.
|
Notes XO Integration Meeting 17.07.2023, posted by Frederik Wolff-Fabris on 17 Jul 2023, 09:53
|
General Announcement:
- SEPS interlock tests are taking place today. An e-mail was sent to xo-info last Friday containing information about the order of the tests.
|
Notes XO Integration Meeting 12.07.2023, posted by Frederik Wolff-Fabris on 12 Jul 2023, 10:18
|
General Announcement:
- There were two power glitches last night observed at Desy which switched OFF some cooling water pumps. Please check your systems and let XO know if you
were also affected.
|
Notes XO Integration meeting 10.0723, posted by Andreas Galler on 10 Jul 2023, 09:30
|
General Announcement:
-
CTRL:
- Bring Up Days start next Monday
DA:
- DA and DET sessions are alwys the same days following CTRL and EEE
EEE:
-
nothing to report
VAC:
- VAC is ready for beam
XPD:
- Nothing to report.
DET:
- Nothing to report
ITDM:
- Nothing to report.
XRO:
-
nothing to report
LAS:
- Nothing to report.
UNSYS:
- nothing to report
SPB:
- Couple of open things with crates --> EEE in discussion
FXE:
- |