Entry   Notes XO Integration Meeting 23.08.2023, posted by Andreas Galler on 21 Aug 2023, 09:26 
General Announcement:


 


CTRL:


nothing major


DA:
Entry   Notes XO Integration Meeting 16.08.2023, posted by Andreas Galler on 16 Aug 2023, 09:24 
General Announcement:


 


CTRL:


nothing major


DA:
Entry   Notes XO Integration Meeting 14.08.2023, posted by Andreas Galler on 14 Aug 2023, 09:30 

General Announcement:

CTRL:
- nothing to report

DA:
- Nothing to report.

EEE:
- Motor issue with SPB
PLC is investigating

VAC:
-
All running fine.

XPD:
- Everything fine from XPD.

DET:
- Nothing to add.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
-
Nothing to report.

UNSYS:
- Everything is fine.

SPB:
- see motor issue EEE

FXE:
- nothing to report

MID:
- Julabo Chiller
    switched
Entry   Notes XO Integration Meeting 09.08.2023, posted by Frederik Wolff-Fabris on 09 Aug 2023, 09:43 
General Announcement:
- Starting this semester, a jitter report will be started at the UOM on the blue weeks. 
Instruments are kindly requested to make a 2-3 mins report on experience with jitter for the previous few weeks, especially in relation to instabilities
Entry   Notes XO Integration Meeting 07.08.2023, posted by Frederik Wolff-Fabris on 07 Aug 2023, 09:50 
General Announcement:
-  A. Silenzi is the DRC for this week and will send an e-mail to instrument local contacts for the jour-fixe meeting this afternoon.
Entry   Notes XO Integration Meeting 02.08.2023, posted by Frederik Wolff-Fabris on 02 Aug 2023, 10:12 
General Announcement:
- Status of machine: a lot of work was done last days on laser injector and RF jitter; all seems to be OK and improvement were done. 
Concluded that electron beam shape is now Gaussian and right now SASE is being tuned. Aim is to have about 2mJ in SA1 and 1mJ in SA2 at 9keV. Beam to be
Entry   Notes XO Integration Meeting 31.07.2023, posted by Andreas Galler on 02 Aug 2023, 09:27 
CTRL
    - still investigating the slowness in SA3 --> which wtachdog is repsonsible
DA:
Entry   Notes XO Integration meeting 26.07.2023, posted by Andreas Galler on 26 Jul 2023, 09:21 
General Announcement:


The injector Laser Window had been exchanged yesterday and currently leak search is ongoing. Tuning is expected to start around lunch
time. 


CTRL:
Entry   Notes XO Integration Meeting 24.07.2023, posted by Frederik Wolff-Fabris on 24 Jul 2023, 09:49 
General Announcement:
- Machine still works in improving performance. News will be posted at xo-info.
- Mikako M. And Idoia F. presented the summary of photon commissioning activities for SA1, SA2 and SA3:
Entry   Notes XO Integration Meeting 19.07.2023, posted by Frederik Wolff-Fabris on 19 Jul 2023, 10:25 
General Announcement:
- SEPS interlock tests are done in SA1 and SA2. It continues tomorrow in SA3 during the morning.
- Machine accelerator startup is ongoing. Photons are being produced and operators are working hard to improve conditions.
Entry   Notes XO Integration Meeting 17.07.2023, posted by Frederik Wolff-Fabris on 17 Jul 2023, 09:53 
General Announcement:
- SEPS interlock tests are taking place today. An e-mail was sent to xo-info last Friday containing information about the order of the tests.
Entry   Notes XO Integration Meeting 12.07.2023, posted by Frederik Wolff-Fabris on 12 Jul 2023, 10:18 
General Announcement:
- There were two power glitches last night observed at Desy which switched OFF some cooling water pumps. Please check your systems and let XO know if you
were also affected.
Entry   Notes XO Integration meeting 10.0723, posted by Andreas Galler on 10 Jul 2023, 09:30 

General Announcement:


CTRL:
- Bring Up Days start next Monday

DA:
- DA and DET sessions are alwys the same days following CTRL and EEE

EEE:
-
nothing to report

VAC:
- VAC is ready for beam

XPD:
- Nothing to report.

DET:
- Nothing to report

ITDM: 
- Nothing to report.

XRO:
-
nothing to report

LAS:
- Nothing to report.

UNSYS:
- nothing to report


SPB:
- Couple of open things with crates --> EEE in discussion

FXE:
-
Entry   Notes XO Integration Meeting 05.07.2023, posted by Frederik Wolff-Fabris on 05 Jul 2023, 09:53 
General Announcement:
- Interlock tests are ongoing up to 12.07 (instruments area) and from 13.07 the accelerator restart with upstream devices.
Entry   Notes XO Integration Meeting 03.07.2023, posted by Frederik Wolff-Fabris on 03 Jul 2023, 09:58 
General Announcement:
- Power glitch happened on Friday morning: emergency power off was triggered in SA2 so power went down and TS installed a new UPS for SA2 area. Power was
switched back few hours later; EEE was busy 
Entry   Notes XO Integration Meeting 28.06.2023, posted by Frederik Wolff-Fabris on 28 Jun 2023, 10:22 
General Announcement:
- PKG maintenance in SA1-2-3 areas (XHEXP1) is to take place today and fluctuations of temperature are to be expected. 
- Please remember that from next Monday 03.07 access is to be done with the new transponder only.
Entry   Notes XO Integration Meeting 31.05.2023, posted by Frederik Wolff-Fabris on 26 Jun 2023, 09:40 
General Announcement:
- Tobias Clever mentions that the tasks for the UPS repair is cancelled for the summer maintenance period.
Entry   Notes XO Integration Meeting 21.06.2023, posted by Frederik Wolff-Fabris on 21 Jun 2023, 11:42 
General Announcement:
- Tobias Clever informs on the UPS repair for SA2 and SA3 areas in the XHEXP1. A new date has to be tentatively arranged. 
XO will communicate with involved parts. The on the central UPS system does not only affect green sockets but also will affect overall power while the
Entry   Notes XO Integration Meeting 19.06.2023, posted by Frederik Wolff-Fabris on 19 Jun 2023, 10:08 
General Announcement:
- Today is the last day with photon beam operation for the ramp down activities from XRO and XPD. From tomorrow (Tuesday) morning the photon tunnels (XTDs)
will be open for the summer maintenance period. 
Entry   Notes XO Integration Meeting 14.06.2023, posted by Frederik Wolff-Fabris on 14 Jun 2023, 09:43 
General Announcement:
- This is the last XO integration meeting during X-ray operations week. In case of questions on the summer maintenance please contact xo-planning@euxfel.eu