Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 1 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Location Severitydown Subject Text Attachments
  88   28 Nov 2019, 15:42 Andreas GallerGeneralProblemaffected ITDM Systems after power cut tonight


XHQ.E1.092

SW-HH-AL-271
was available
  
  1   30 Jan 2019, 11:26 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 30.01.19 SPB/SFX


Planned for the next 2
weeks

AGIPD commissioning and
  
  2   01 Feb 2019, 12:49 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.00SPB/SFX


Open AGIPD wing. Next 3
days are needed for fixing purposes.


FXE
  
  3   04 Feb 2019, 10:17 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.30SPB/SFX


Waiting for the loop 12
to be running to start the commissioning
  
  4   06 Feb 2019, 11:13 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 06.02.19 SPB/SFX


AGIPD commissioning and
tests. ==> intervention on the wings is
  
  5   08 Feb 2019, 10:42 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.00SPB/SFX


IT cables in D.23 were
re-measured yesterday. Waiting for the measurements.
  
  6   11 Feb 2019, 09:59 Adriano ViolanteGeneralInformationMInutes of the dispatch meeting 09.30SPB/SFX


Beam is back on Wed. night.
IT
cables in D.23 were re-measured on friday.
  
  7   13 Feb 2019, 10:59 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 13.02.19 SPB/SFX


CSS component commissioning.
RBean is discussing with AE. Concept and
  
  8   15 Feb 2019, 12:14 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.00SPB/SFX


SPB requires the new trigger
solution to be implemented for AGIPD. This
  
  9   18 Feb 2019, 10:09 Adriano ViolanteGeneralInformationMinutes of the dispatch meeting 09.30SPB/SFX


Data aggregators were often
crashing during the WE and needed to be re
  
  10   20 Feb 2019, 11:16 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 20.02.19 SPB/SFX


CSS component commissioning.
Concept and implementation being finalized.==>
  
  11   22 Feb 2019, 12:36 Adriano ViolanteGeneralInformationMInutes of the dispatch meeting 09.00SPB/SFX


Pulse picker commissiong
- Issues concerning motors position and triggers
  
  12   25 Feb 2019, 09:52 Adriano ViolanteGeneralInformationMinutes of the dispatch meeting 09.30SPB/SFX


Change to the triggers
for  cameras is being discussed/implemented
  
  13   27 Feb 2019, 11:27 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 27.02.19 SPB/SFX


CSS component commissioning.
Concept and implementation finalized. EPLAN
  
  14   01 Mar 2019, 14:18 Adriano ViolanteGeneralInformationReport after dispatch meeting 09.00SPB/SFX


Today Loop 8 could be ready
(AE)
Agipd - visualization of
  
  15   04 Mar 2019, 10:38 Adriano ViolanteGeneralInformationMinutes of the dispatch meeting 09.30SPB/SFX


Ongoing discussions with
the support groups to organize the shutdown
  
  16   06 Mar 2019, 10:31 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 06.03.19 SPB/SFX


CSS component commissioning.
Concept and implementation finalized. EPLAN
  
  17   08 Mar 2019, 13:01 Adriano ViolanteGeneralInformationMinutes of the dispatch meeting 09.00SPB/SFX


Only minor issues being
addressed with the support groups.


FXE
  
  18   11 Mar 2019, 11:58 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB/SFX


Experiments were succesfull
Calibration
pipeline has issues - being fixed
Detailed
  
  19   13 Mar 2019, 11:11 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 13.03.19 SPB/SFX


CRL implementation in the
hutch will happen in April. AE and EET involved.
 ElectricalSafety.pdf 
ELOG V3.1.4-7c3fd00