Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 9 of 30  Not logged in ELOG logo
ID Date Author Location Severity Subjectdown Text Attachments
  469   07 Feb 2018, 09:47 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB/SFX

- An AGIPD crate providing power
broke down and has been fixed already by
  
  471   12 Feb 2018, 10:03 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


During operation Karabo
crashed. As soon as detector is being operated
  
  472   14 Feb 2018, 14:21 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


MIddle layer karabo devices
are responsible for the det. Karabo problems.
  
  475   19 Feb 2018, 09:56 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB




KB chamber being
pumped down


interaction
  
  477   21 Feb 2018, 10:55 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


KB chamber being pumped
down
Smaract commissioning ongoing
Coordinate
  
  481   28 Feb 2018, 10:55 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB:


Ion pumps running in the
Mirror chamber. Vacuum level OK to run.
D.02
  
  483   05 Mar 2018, 11:07 Adriano ViolanteXHEXPInformationStatus report after dispatch meeting 09.30 

SPB


Last night the beam disappeared
  
  485   07 Mar 2018, 11:14 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB:


Monday morning Karabo failed.
It was not possible to operate anything.
  
  487   12 Mar 2018, 13:18 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB (Weinhausen):


During the night there
was an interlock issue. The fast shutter
  
  488   14 Mar 2018, 10:06 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB (Weinhausen/Round/Mancuso):


Again on the fast valve was
triggering the MPS interlock system. For
  
  490   19 Mar 2018, 10:24 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30No new issues to be discussed where reported
by any groups.

The status and issues reported
  
  491   21 Mar 2018, 10:02 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB

On monday there was an issue with
a detector related PLC due to misconnection
  
  493   26 Mar 2018, 13:10 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30General

Due to the triggering of the emergency
power off in FXE caused by electrical works
  
  495   28 Mar 2018, 15:22 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


Sample delivery installed.
Tonight will be commissioned. Experiment
  
  520   30 Apr 2018, 09:51 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30CAS (C. Youngman)

Following the Technical commissioning
phase for the SASE2 tunnel components, the
  
  521   02 May 2018, 11:17 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


After re-compiling the
relative karabo device, the configuration
  
  522   07 May 2018, 10:36 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


Loops 5,7,11, update and
Karabo deployed.
Loops 12,13,8 update
  
  527   23 May 2018, 12:44 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30General


Please remember to send
the list of the tasks you planned for the
  
  528   28 May 2018, 10:28 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30General


For the upcoming emergency
off test in SASE1 SPB and FXE should propose 
  
  529   30 May 2018, 10:55 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30AE


CRLs in XTD1 being implemented
GATT
and EPS loop in SASE3 being updated


SCS
  