Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 483     Entry time: 05 Mar 2018, 11:07
Author: Adriano Violante 
Location: XHEXP 
Severity: Information 
Subject: Status report after dispatch meeting 09.30 

 

SPB

  • Last night the beam disappeared between 4 and 8. 
  • AGIPD scene showed many problems, both concerning Karabo and Data preview. Detector is not operable.  To solve the issue a joint effort of all the groups involved, as well as the physical presence of experts during the shift is requested. 
  • CSS has to be moved out of the beam. As of now there are problems with cabling that need to be solved
  • Smaract stages are misbehaving. More support from AE (Mahadi) is requested
  • Status of the coordinated motion test was asked. Should be ongoing but the experts were not there.

FXE:

  • Testing fast intensity monitors and LPD 
  • DAQ worked very well
  • Scan tool must me tested
  • Correlation between LPD and fast intensity monitor is problematic due to train id problems. There is a new device to be deloyed on the XGM. Today or tomorrow will be seen whether this solves the issues.
  • BKR reported that the beam tripping was due to some FXE device close to the M3, but FXE is not aware of that. Info will be asked to Harald today during the PSO meeting.

 

Advanced Electronics (P. Gessler):

 

  • MCP HV problem in SASE3 - the power supply failed. The fixing shoud be done according to the priorities, Photon run coordinator decides.

 

ITDM (K. Wrona):

  • FXE slow data DAQ issues: these will be solved splitting the LPD slow data from the rest. small update of the software needed. 
  • Simultaneous acquisition from LPD and cameras is now available and working well.

 

Detectors (J. Sztuk-Dambietz, P. Lang):

  • AGIPD will operate with the old firmware due to problems with the new one
  • No calibration data available as of today
  • AGIPD is in a safe state

 

 