running jdd panels in control rooms, posted by ITDM Admin on 01 Apr 2019, 10:29
|
On all PCs in the control rooms including BKR and also on the exflgateway there is a new version of jddd installed
which is working with openjdk-11.
It is worth to mention that the old javaws from old oracle java 8 is deprecated and it is not recommended running jddd panels using old way, like |
notes Dispatch meeting Mar 23 2020, posted by Andreas Galler on 23 Mar 2020, 08:57
|
Currently EuXFEL enforces a hand-off policy for instrument/tunnel hardware. That includes remote control of motors, pumps,
etc.. as well as changing config Files. If and when this policy is lifted will be communicated during Dispatch and Technical Integration Meetings. Please
also don't hesitate and contact XO in case of any questions. |
notes Dispatch meeting Mar 2 2020, posted by Andreas Galler on 04 Mar 2020, 08:49
|
SPB:
AGIPD improvement campaign great success
EEE --> 2nd C&C worked just fine
FXE:
BTM tests successful
Johann MDL motors should be in closed loop
JF CTRL device crashed
MID: |
notes Dispatch meeting Jan 20 2020, posted by Andreas Galler on 22 Jan 2020, 09:16
|
SPB:
nothing to report
FXE: |
notes Dispatch meeting Jan 13 2020, posted by Andreas Galler on 15 Jan 2020, 09:09
|
SPB:
Testing coordinated movement of Mirror motors with the MC2 lib on lemo drives
optics hutch vented accidentally vented but |
notes Dispatch meeting Feb 24 2020, posted by Andreas Galler on 26 Feb 2020, 09:06
|
SPB:
nothing to report
FXE:
not present due to group retreat
MID: |
notes Dipatch Meeting March 9th, 2020, posted by Frederik Wolff-Fabris on 10 Mar 2020, 12:44
|
* Users are scheduled to be here this week (4 beamlines in user runs). SPB, HED, MID report several users have cancelled the travel. Beamlines are making
mitigation plans
to run experiments.
|
notes Dipatch Meeting Feb. 17th, 2020, posted by Frederik Wolff-Fabris on 17 Feb 2020, 12:02
|
FXE:
Nothing to report: no issues;
|
notes Dipatch Meeting April 6th, 2020, posted by Frederik Wolff-Fabris on 06 Apr 2020, 09:50
|
CTRL:
- It was remotely observed that some cameras were consuming too much memory. By remotely re-starting these devices the issue was solved.
- No calls to the OCD during the weekend.
|
dispatch meeting Mon Nov 25 2019, posted by Andreas Galler on 27 Nov 2019, 09:25
|
FXE: no issues
SPB: no issues
MID: Split & Delay line arriving on Friday, MID aims for a quick integration into instrument / beamline |
affected ITDM Systems after power cut tonight, posted by Andreas Galler on 28 Nov 2019, 15:42
|
XHQ.E1.092
SW-HH-AL-271 was available
SW-HH-AL-272 came back after the DL switch was back (see below, ca 09:33) |
XO integration meeting 22.07.2020, posted by Andreas Galler on 22 Jul 2020, 09:22
|
General Announcement:
Default beam positions are being implemented for each SASE at the FEL imager to reduce re-alignment offers for the instrumetns after
shutdowns and facility development weeks
CTRL: |
Technical Integration Meeting 25.03.2020, posted by Andreas Galler on 25 Mar 2020, 09:32
|
Currently EuXFEL enforces a hand-off policy for instrument/tunnel hardware. That includes remote control of motors, pumps,
etc.. as well as changing config files. If and when this policy is lifted will be communicated during Dispatch and Technical Integration Meetings. Please
also don't hesitate and contact XO in case of any questions. |
Technical Integration Meeting 18.03.2020, posted by Andreas Galler on 18 Mar 2020, 09:26
|
SPB:
interument parked
power cut --> someon needs to come in
NJ: what'S that status of the VAC
KC |
Technical Integration Meeting 15.04.2020, posted by Andreas Galler on 15 Apr 2020, 09:03
|
CTRL:
notificagion service device going to be tested this week
ITDM: SMS part is operational but needs to be implemented
EEE: |
Technical Integration Meeting 08.04.2020, posted by Andreas Galler on 08 Apr 2020, 08:45
|
CTRL:
no bigger issues
announcement: inital simulation environment ready which can simulate BECKHOFF devices
shall |
Technical Integration Meeting 01.04.2020, posted by Andreas Galler on 01 Apr 2020, 09:19
|
CTRL:
productive meeting with HED
CTRL will ask the other instruments if a similar concept could be agreed upon
discussion |
Summary of the technical integration meeting, posted by Adriano Violante on 04 Dec 2019, 14:18
|
FXE
No major issues - PLCs update has been started by EEE (BB)
SCS
Hrixs and related components will be delivered on 13 and 14.01.2020. SCS is coordinating the works with TS in order to crane the chambers |
Status report after tech. Int. Meeting 9.30, posted by Adriano Violante on 13 Nov 2019, 10:12
|
FXE
Radiation tests ongoing.
EEE informs that the PLC drawings will be exchanged in the WS
SPB/SFX
SCS |
Status report after dispatch meeting Monday 27.5. 09.30 , posted by Gerd Wellenreuther on 27 May 2019, 10:35
|
SPB/SFX
Digitizers are ready, have been tested by CAS ==> to be be installed / integrated probably next week ==> according to Adrian probably
Monday, to be confirmed with AE (Bruno + Hamed) ==> is confirmed to be today
Different GUIs were reporting varying values |