  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 2 of 29  Not logged in ELOG logo
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 12 Nov 2018, 09:55 
SPB


More interlock updated will take place this morning.


​FXE


Supporting the diagnostic and optics group for the testing of the beam feedback mechanism. 
A.Galler was informed by
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 07 Nov 2018, 10:44 
SPB


Karabo was updated yesterday. Test is ongoing. So far no issues.
The macros for cooling down and warming up the detector do
not work properly. If the button is pushed twice the setpoint changes continuing e.g. cooling down too much. Marcin will bring the issue up with CAS (HS).


 
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 05 Nov 2018, 12:25 
SPB

​FXE

SQS
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 29 Oct 2018, 13:25 
SPB


A smaract stage sensor had issues. The behavior changes whether the chamber is pumped down or not. The Issue is being addressed by AE.


​FXE


Users are acquiring data with the Jungfrau detector. It is a success so far.
Successful users shifts.


SQS
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 24 Oct 2018, 11:25 
SPB

​FXE


During the last users run there was a loss of optical laser. This was due to a mistake in CAS. Has been clarified already. It is pointed
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 22 Oct 2018, 13:46 
SPB



Issues with the detectors pipeline occured (also for FXE). In the future a test button to check the status of the pipeline wil
be implemented.
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 17 Oct 2018, 10:10 
SPB



KB motors issue: the motors do not go to the proper position. This has been communicated to AE. Analysis of the problem and fixing
ongoing.
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 15 Oct 2018, 13:39 
SPB



Issue with the detector cooling pipes during the week end required intervention. Now fixed.


Commissioning ongoing.
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 10 Oct 2018, 10:40 
SPB



Problems with the GUI not being accessible after update solved with the CAS OCDs 


Loop 5 and Master loop will be updated today. New MPS conditions included.
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 08 Oct 2018, 10:37 
SPB



Ready for users.


DAQ tests to be done on the SPB side.
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 01 Oct 2018, 10:49 
SPB



Maintenance of the AGIPD ongoing.



FXE
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 26 Sep 2018, 10:42 
SPB



Maintenance of the AGIPD ongoing.



FXE
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 19 Sep 2018, 09:58 
SPB



Last monday shift was cancelled since there were prooblems with the cooling of the AGIPD. Not possible to reliably cool it
down. Maintenance of the cooling units plus investigation of the controllers ongoing.
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 17 Sep 2018, 10:19 
SPB



Bug in the AGIPD cooling macro (setpoint resets itself to -59 C)  -  Jola knows about the problem. AS: Macro will be
fixed.
    Reply   Re: Status report after dispatch meeting 09.30, posted by Dennis Goeries on 17 Sep 2018, 14:30 
The GUI crashes reported by FXE will be fixed with the hotfix release coming ~tomorrow.

It is related to very high or low values in plotting widgets scratching the maximum floating point number (1e308 ~ infinity).

-- Wajid & Dennis
Entry   , posted by Adriano Violante on 14 Sep 2018, 13:38 
 
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 12 Sep 2018, 14:52 
SPB


Testing of the 4 images preview mode for AGIPD will be done today.
Interlock definitions are being updated. Loop update
will be done after the users experiments.


FXE
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 10 Sep 2018, 10:33 
SPB


DAQ was updated and no big issues were found.
Some issues are being discussed with CAS and ITDM. Among them also the request
to add more channels to the DAQ.
Interlock definitions are being updated. Discussions with AE ongoing.


FXE
Entry   switch software update - ITDM request, posted by Adriano Violante on 10 Sep 2018, 09:12 
The office switched reported below have to be upgraded. Some of them belong to accelerator and some to us. Below you find the detailed list of the switches
and the time schedule (assuming everything runs fine) for the update. ITDM needs feedback the latest today evening.  

if you see problems with the upgrade, please reply to this e-mail. If we do not receive complaints until this evening, we assume that everything
Entry   Status report after dispatch meeting 09.30, posted by Adriano Violante on 05 Sep 2018, 12:19 
SPB


DAQ will be updated today by ITDM to make it more user friendly.
Smaract stages issue. Only 2 out of 10 are not working. For
the planned experiments these are more than enough. The last 2 will be finxed at the end of the month.


SQS
Entry   Status report after dispatch meeting 09.30 , posted by Gerd Wellenreuther on 03 Sep 2018, 09:49 
SPB / SFX:


Experiments are ongoing, users collected data on Sat. and Sun.
There have been issues with the detector/DAQ due to operator
error
There have been issues with the sample delivery
There was an issue with the X-ray / Laser interlock systems on Saturday, which