Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 26 of 30  Not logged in ELOG logo
ID Date Author Locationdown Severity Subject Text Attachments
  490   19 Mar 2018, 10:24 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30No new issues to be discussed where reported
by any groups.

The status and issues reported
  
  491   21 Mar 2018, 10:02 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB

On monday there was an issue with
a detector related PLC due to misconnection
  
  493   26 Mar 2018, 13:10 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30General

Due to the triggering of the emergency
power off in FXE caused by electrical works
  
  494   27 Mar 2018, 14:18 Jan GruenertGeneralInformationXTD1 openInfo from BKR:  the southern tunnels
were opened, thus XTD1 can be accessed now.
  
  495   28 Mar 2018, 15:22 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


Sample delivery installed.
Tonight will be commissioned. Experiment
  
  496   29 Mar 2018, 09:48 Hugo Silva SantosGeneralInformationRe: Status report after dispatch meeting 09.30Update regarding Digitizer:

----- Forwarded Message -----
From: "hamed sotoudi namin"
  
  497   04 Apr 2018, 13:43 Gerd WellenreutherGeneralInformationStatus reports after dispatch meeting 13:00 4.4.SPB/SFX:


Mirror installation next
week


FXE:
  
  498   04 Apr 2018, 17:35 Janusz SzubaGeneralInformationControl network maintenanceTomorrow, 5.04, between 9:30 and 12:00
there will be urgent maintenance of one of
the two redundant main switches for the control
  
  499   04 Apr 2018, 17:46 Janusz SzubaGeneralInformationmaintenance of the online storage systemOn Friday, 6.04, there will be a maintenance
of the online storage system. This will tackle
the issues we had just before the last user
  
  501   09 Apr 2018, 14:25 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00General

Emergency off test in SPB is shifted.
Date to be agreed on Friday. FXE test stays
  
  502   09 Apr 2018, 14:37 Adriano ViolanteGeneralInformationKarabo deployment datesFYI

Below
the E-Mail from Hugo Santos with the Karabo
  
  503   11 Apr 2018, 13:48 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00SPB


Detector z motion would
be needed. AE checks the status of the crate.
  
  504   12 Apr 2018, 15:34 Adriano ViolanteGeneralInformationWater cooling mointenance by MKK doneDie Arbeiten an der Kühlwassersteuerung
konnten innerhalb des genannten

Zeitraums abgeschlossen werden,
  
  505   13 Apr 2018, 07:50 Adriano ViolanteGeneralInformationKarabo 2.2.3 installationHi all, for your information below a message
from Chris Youngman concerning Karabo 2.2.3
installations in SASE3.
  
  509   13 Apr 2018, 13:50 NEREA JARDONGeneralInformationShutdown MicroTCA4 SPB and FXEThis entry is on behalve of Frank Babies,
if you have any doubt about it, contact him:

On 16.Apr.2018
  
  511   16 Apr 2018, 14:20 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00Summary of Karabo 2.2.3 deployment
dates:


Karabo 2.2.3 deployed in
  
  513   18 Apr 2018, 13:43 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00SPB


Karabo has been deployed 
without major  problems! 
Now
  
  514   18 Apr 2018, 15:06 Gerd WellenreutherGeneralInformationTunnel closing after shutdownDear all,

below please find the hottest and
most up-to-date times for the closing of
  
  515   23 Apr 2018, 15:35 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00SPB


Timing tool for optical
laser installed
Sample chamber's
  
  517   25 Apr 2018, 13:28 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00SPB


Loops update: 1-4+8 this
week. 5-7 Wed. next week. 11-13 end next
  
ELOG V3.1.4-7c3fd00