Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 11 of 30  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Location Severity Subjectdown Text Attachments
  570   15 Oct 2018, 13:39 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB



Issue with the detector cooling
pipes during the week end required intervention.
  
  571   17 Oct 2018, 10:10 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB



KB motors issue:
the motors do not go to the proper position.
  
  572   22 Oct 2018, 13:46 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB



Issues with the detectors
pipeline occured (also for FXE). In the future
  
  573   24 Oct 2018, 11:25 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB

​FXE


During the last users run
  
  574   29 Oct 2018, 13:25 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


A smaract stage sensor
had issues. The behavior changes whether
  
  575   05 Nov 2018, 12:25 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB

​FXE

SQS
  
  576   07 Nov 2018, 10:44 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


Karabo was updated yesterday.
Test is ongoing. So far no issues.
The
  
  577   12 Nov 2018, 09:55 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


More interlock updated
will take place this morning.


​FXE
  
  578   14 Nov 2018, 10:23 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


Lopp 5 update - will be
agreed between SPB and AE
Smaract
  
  579   19 Nov 2018, 10:39 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


Gotthard needs to be tested.
Pulse
picker will be used and commissioning still
  
  580   21 Nov 2018, 10:13 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


KB system and AGIPD commissioning
ongoing


​FXE
  
  581   26 Nov 2018, 10:35 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


KB system commissioning
ongoing
Agipd commissioning stopped
Radiation
  
  582   28 Nov 2018, 10:18 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


 commissioning ongoing
Radiation
test was not successful since the beam diameter
  
  583   03 Dec 2018, 11:45 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


pulse arrival time measurements
to be done next week.
second Gotthard
  
  584   05 Dec 2018, 11:41 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


pulse arrival time measurements
to be done this week.
second Gotthard
  
  585   10 Dec 2018, 09:50 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB

FXE


Timing tool has been tested
  
  586   12 Dec 2018, 10:17 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB/SFX


Radiation damage tests
were successful. 
Instrument
  
  587   17 Dec 2018, 10:36 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB/SFX


SFX part1 cabling preparation
ongoing (WCBs mounting and labeling)
waiting
  
  588   19 Dec 2018, 13:17 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB/SFX


SFX part1 cabling preparation
ongoing (WCBs mounting and labeling). Good
  
  589   07 Jan 2019, 09:55 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB/SFX


CRLs will be brought in
the SPB lab in XHQ. The vacuum group is installing
  
ELOG V3.1.4-7c3fd00