Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 31 of 33  Not logged in ELOG logo
Entry   Notes XO Integration Meeting 01.06.2022, posted by Frederik Wolff-Fabris on 01 Jun 2022, 09:52 
General Announcement:
- Martin Doering presents the status of the maintenance planning: currently XO is about to release the maintenance task list on next Friday; 
major tasks such as electricity, electrical distribution cabinets will be done (power outlets OFF, emergency lights off); 
Entry   Notes XO Integration Meeting 01.03.2023, posted by Frederik Wolff-Fabris on 01 Mar 2023, 09:41 
General Announcement:
-  
Entry   Notes XO Integration Meeting 01.03.2021, posted by Frederik Wolff-Fabris on 01 Mar 2021, 10:49 
General Announcement:
- An e-mail from Steve Aplin informs on how to contact the DATA operation center during beam delivery times. It changes contact phone numbers for OCDs.
Entry   Notes XO Integration Meeting 01.02.2023, posted by Frederik Wolff-Fabris on 01 Feb 2023, 10:56 
General Announcement:
- A. Galler reminds instruments to use the Operation-2023 e-log for daily reports.
Entry   Notes XO Integration Meeting 01.02.2021, posted by Arvid Gebhardt on 01 Feb 2021, 09:06 
General Announcement:

- The test of the emergency automatic switch of power bridge is scheduled for Tuesday, 2nd of February 2021, 09:00. This will
affect orange outlets in XHQ and green and orange outlets in XHEXP1. A short interruption in the power supply lines will happen. We expect all groups have
Entry   Notes XO Integration Meeting 03.03.2021, posted by Arvid Gebhardt on 03 Mar 2021, 09:23 
General Announcement:

- Hick-ups in the beam operation are happening since last night. There is no obvious indications on the origin of the problem and MXL is investigating
to restore a normal beam delivery condition.
Entry   Notes XO Int. Meeting 16.03.2022, posted by Frederik Wolff-Fabris on 16 Mar 2022, 10:39 
General Announcement:
- The Summer maintenance planning period is approaching and next Wednesday at the end of the XO Int. Meeting a presentation of the changes/improvements
will be made. 
Entry   Notes XO Int. Meeting 14.03.2022, posted by Frederik Wolff-Fabris on 14 Mar 2022, 10:41 
General Announcement:
- On the Summer-22 maintenance period: In about 2 weeks (by end of March) the call for the summer/22 maintenance period will be send to the groups.
Entry   Notes Dispatch meeting Feb 10th, 2020, posted by Frederik Wolff-Fabris on 10 Feb 2020, 10:12 
SPB: Nothing to report;

FXE:  Everything ongoing; nothing special to be reported;
Entry   Notes Dispatch Meeting 20.04.2020, posted by Frederik Wolff-Fabris on 20 Apr 2020, 10:59 
General:
- Desy informed a power glitch occurred on Thursday 16th at 04:55AM. TS has not seen any traces of it in the EuXFEL internal GLT.
- From next week the Dispatch meeting will start at 09:30AM.
Entry   Notes Dipatch Meeting March 16th, 2020 , posted by Frederik Wolff-Fabris on 16 Mar 2020, 09:36 
FXE:
- Beamline is in safe state;
- Minor Jungfrau calibration issues over last week. In touch with DET and EEE;
Entry   Minutes of the dispatch meeting 09.30, posted by Adriano Violante on 18 Feb 2019, 10:09 
SPB/SFX


Data aggregators were often crashing during the WE and needed to be re initialized.
Puls picker commissiong - Scan tool was
used and worked. Issues concerning motors position and triggers ==> To be worked out with AE.
DET group is helping setting up the Jungfrau
Entry   Minutes of the dispatch meeting 09.30, posted by Adriano Violante on 25 Feb 2019, 09:52 
SPB/SFX


Change to the triggers for  cameras is being discussed/implemented with BF.
Preparation for the AGIPD intervention planned
in the next mini shutdown is being discussed with AE.
On Wednesday the user period start. No more commissioning possible. 


FXE
Entry   Minutes of the dispatch meeting 09.30, posted by Adriano Violante on 04 Mar 2019, 10:38 
SPB/SFX


Ongoing discussions with the support groups to organize the shutdown activities.Update of the shutdown task list could eventually be
provided.
X-Ray interlock system had issues in the WE and needed to be re set. Not clear why this happened.
Problem with Karabo freezing.
Entry   Minutes of the dispatch meeting 09.00, posted by Adriano Violante on 08 Mar 2019, 13:01 
SPB/SFX


Only minor issues being addressed with the support groups.


FXE

​SQS
Entry   Minutes of the Technical integration meeting 31.07.19 , posted by Adriano Violante on 31 Jul 2019, 10:46 
XO

FXE

SPB/SFX
Entry   Minutes of the Technical integration meeting 30.01.19 , posted by Adriano Violante on 30 Jan 2019, 11:26 
SPB/SFX


Planned for the next 2 weeks

AGIPD commissioning and tests. DET group heavily involved.
Screens are being installed
and commisisoned in the hutch.
CSS component commissioning. AE involved and informed.
Loop 14 (Jungfrau) is needed for next week
Entry   Minutes of the Technical integration meeting 29.05.19 , posted by Gerd Wellenreuther on 29 May 2019, 10:30 
FXE

SPB/SFX


XTD2 attenuator appears to be damaged. ==> Request to VAC: is it possible to exchange the attenuators in the summer shutdown?
Entry   Minutes of the Technical integration meeting 28.08.2019, posted by Adriano Violante on 28 Aug 2019, 10:33 
XO

FXE


Leak in the LPD cooling system has been found. DET on it. Ongoing
Laser went out of synch several time during the last weeks.
Entry   Minutes of the Technical integration meeting 27.03.19 , posted by Adriano Violante on 27 Mar 2019, 10:48 
SPB/SFX


CRL implementation in the hutch will happen in April. AE and EET involved. ==> Connectors on the beckhoff frames need to be re-shuffled
according to the newest version of the EPLAN documentation. EET will take care of that, so that the loop can be started as soon as possible.
CSS