Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 29 of 31  Not logged in ELOG logo
ID Date Author Location Severity Subjectdown Text Attachments
  256   01 Sep 2021, 10:36 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.09.2021General Announcement:
- A change of meeting room occupancy will
happen soon (increase by some %) and will
  
  345   01 Aug 2022, 10:02 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.08.2022General Announcement:
- Today the SEPS interlock tests take place
at all SASEs. This happens usually after
  
  526   01 Jul 2024, 09:40 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.07.2024General Announcement:
-  
  
  138   01 Jul 2020, 13:53 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.07.2020General Announcement:
- Interlock tests are starting in SASE3 instruments
right now. Zunaira, Eric and Wolfgang Clement
  
  330   01 Jun 2022, 09:52 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.06.2022General Announcement:
- Martin Doering presents the status of the
maintenance planning: currently XO is about
  
  399   01 Mar 2023, 09:41 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.03.2023General Announcement:
-  
  
  203   01 Mar 2021, 10:49 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.03.2021General Announcement:
- An e-mail from Steve Aplin informs on how
to contact the DATA operation center during
  
  391   01 Feb 2023, 10:56 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 01.02.2023General Announcement:
- A. Galler reminds instruments to use the
Operation-2023 e-log for daily reports.
  
  195   01 Feb 2021, 09:06 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 01.02.2021General Announcement:

- The test of the emergency automatic
switch of power bridge is scheduled for Tuesday, 2nd
  
  204   03 Mar 2021, 09:23 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 03.03.2021General Announcement:

- Hick-ups in the beam operation
are happening since last night. There is
  
  309   16 Mar 2022, 10:39 Frederik Wolff-FabrisGeneralInformationNotes XO Int. Meeting 16.03.2022General Announcement:
- The Summer maintenance planning period
is approaching and next Wednesday at the
  
  308   14 Mar 2022, 10:41 Frederik Wolff-FabrisGeneralInformationNotes XO Int. Meeting 14.03.2022General Announcement:
- On the Summer-22 maintenance period: In
about 2 weeks (by end of March) the call
  
  97   10 Feb 2020, 10:12 Frederik Wolff-FabrisGeneralInformationNotes Dispatch meeting Feb 10th, 2020SPB: Nothing to report;

FXE:  Everything ongoing; nothing special
  
  111   20 Apr 2020, 10:59 Frederik Wolff-FabrisGeneralInformationNotes Dispatch Meeting 20.04.2020General:
- Desy informed a power glitch occurred on
Thursday 16th at 04:55AM. TS has not seen
  
  102   16 Mar 2020, 09:36 Frederik Wolff-FabrisGeneralInformationNotes Dipatch Meeting March 16th, 2020 FXE:
- Beamline is in safe state;
- Minor Jungfrau calibration issues over
  
  9   18 Feb 2019, 10:09 Adriano ViolanteGeneralInformationMinutes of the dispatch meeting 09.30SPB/SFX


Data aggregators were often
crashing during the WE and needed to be re
  
  12   25 Feb 2019, 09:52 Adriano ViolanteGeneralInformationMinutes of the dispatch meeting 09.30SPB/SFX


Change to the triggers
for  cameras is being discussed/implemented
  
  15   04 Mar 2019, 10:38 Adriano ViolanteGeneralInformationMinutes of the dispatch meeting 09.30SPB/SFX


Ongoing discussions with
the support groups to organize the shutdown
  
  17   08 Mar 2019, 13:01 Adriano ViolanteGeneralInformationMinutes of the dispatch meeting 09.00SPB/SFX


Only minor issues being
addressed with the support groups.


FXE
  
  74   31 Jul 2019, 10:46 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 31.07.19 XO

FXE

SPB/SFX
  