Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 29 of 29  Not logged in ELOG logo
ID Date Author Location Severity Subjectdown Text Attachments
  51   05 Jun 2019, 09:59 Gerd WellenreutherGeneralInformationMinutes of the Technical integration meeting 05.06.2019FXE

SPB/SFX


few days of beamtime
  
  63   03 Jul 2019, 10:18 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 03.07.19 XO


In SASE3 the apertures
of the GATT have to be realigned. The upstream
  
  28   03 Apr 2019, 10:44 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 03.04.19 SPB/SFX


CRL implementation in the
hutch. Cables at the back of the crate have
  
  20   15 Mar 2019, 11:27 Adriano ViolanteGeneralInformationMinutes after dispatch meeting 09.00SPB/SFX


No major issues reported
Motors
in Loop 14 have been tested and problems
  
  6   11 Feb 2019, 09:59 Adriano ViolanteGeneralInformationMInutes of the dispatch meeting 09.30SPB/SFX


Beam is back on Wed. night.
IT
cables in D.23 were re-measured on friday.
  
  11   22 Feb 2019, 12:36 Adriano ViolanteGeneralInformationMInutes of the dispatch meeting 09.00SPB/SFX


Pulse picker commissiong
- Issues concerning motors position and triggers
  
  75   02 Aug 2019, 09:10 Adriano ViolanteGeneralInformationInfo on dispatch meeting 09.00The meeting did not take place since only
EEE was attending.
  
  Draft   30 Mar 2020, 08:57 Andreas Galler   CTRL:


Broker Pile Up in 4 topics
over the weekend

LAS affected
  
ELOG V3.1.4-7c3fd00