Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 584     Entry time: 03 Feb 2025, 09:39
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 03.02.2025 
General Announcement:
- Experiment tuning week is ongoing; Two downtimes happened over the weekend due to 1. an electronic component part of quench circuit of a cold magnet in A20 (11hs) and 2. interlock issues at the injector 
laser (3hs).

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing major to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report;
- Naresh K. work went fine on Saturday (wavefront sensor at HED); program was cut because of short time due to downtime.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- No major problems; hiccups were investigated and there is nothing preventing operation.

LAS:
- Not present.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.