Group Selection Page HELP Controls Group ITDM DET Vacuum WP78 FXE SPB HED SQS SXP Sample Environment PSPO XO TS Migrated2Zulip Archived2GitlabPages Archived2PDF MigratedByGroup
SCS Photon Commissioning Team XRO DOC WP74 MID XO_mig XO_Operation SQS Migrated2Zulip
Technical integration and coordination
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 495     Entry time: 04 Mar 2024, 09:50
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 04.03.2024 
General Announcement:
- A cold compressor failure happened on Friday and since Sunday early hours machine is running in good performance again.
- Pouneh S. reports that Sunday morning Amphos shutter closed and ad-hoc procedure was put in place to allow beam delivery. Investigation is ongoing.

CTRL:
- Information: minor incident with SA1 macro server which was shutdown by mistake on Friday. Macros that were know to be running were restarted afterwards.

DA:
- Nothing major to report: OCD was quiet before and after downtime.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Damage on one of the XTD2 solid attenuator is found. A similar action as done in XTD1 to move the plate position is under discussion with instruments.

LAS:
- Not present.

UNSYS:
- Everything is fine and tomorrow SA3 cell 12 PS motor will be replaced.

SPB:
- Issue with changing number of bunches that originated from XTD2 attenuator watchdog, limiting to 24 bunches.

FXE:
- Decoupling phase shifters during scans caused non-stable beam.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.

SXP:
- Not present.
ELOG V3.1.4-7c3fd00