365
|
12 Oct 2022, 09:16 |
Andreas Galler | General | Information | Notes XO integration meeting 12.10.2022 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
- SA2 online system (gpfs) one enclosure is bahving strangely, intervention may be required --> to be investigated
XRO:
LAS:
UNSYS:
- cell 19, 20, 21 motors for phase shifters had been replaced. Delivery for lead shields is going to be next year --> installation will have to be done through ZZ access
- radiation damage is high after chicane, delivery time for new motors is 1 years, 7 are left in stock
SPB/SFX:
FXE:
MID:
HED:
SCS:
- hRIXS combined motuion requires PLC to be exchanged
SQS:
DRC
PRC
|
366
|
17 Oct 2022, 09:31 |
Andreas Galler | General | Information | Notes XO Integration Meeting 17.10.2022 |
General Announcement:
CTRL:
DA:
EEE:
- OCD call on Friday
- ion pump controller broken in XTD1
VAC:
- see EEE --> additionally over the weekend the pump was taken out of the interlock
XPD:
DET:
- JungFrau damagat at SPB/SFX in cw 40
- two powder rings permantnly burned into detector
ITDM:
- SA2 online system (gpfs) one enclosure is bahving strangely, --> fixed no replacement needed
XRO:
LAS:
- crash of PPLaser in SA1 over the weekend
- TRGDly was upgraded recently/ crashed for SPB --> TRGDly device being rolled back and PPLAS1 should be back up today.
UNSYS:
- ccell 25 SA1 fixed --> now only 6 motors are left.
- Lead shields ETA beginning of February --> will have to be done through ZZ
- broken motors and encoders are sent back to Beckhoff
- repair time approx. 2 - 3 months
SPB/SFX:
- Jet control stopped
- PPLAS
- on Friday there was no LAS output --> fixed
- no LAS OCD in blue weeks, and on Friday no LAS group member on site --> earliest service on Saturday through good will.
- shift change not successful due to miscommunication
- SPB let the laser run over night for measurements --> FXE did shift change over night eventually destroying the SPB measurement
- see LAS TRGDLY device
- SPB requests to not upgrade software thorugh run for PPLasers.
- recently there were some upgrades on a Monday which then later fail for operation
- SPB notest that there is only limited OCD by LAS group and then LAS cannot cover critical components
FXE:
- set up built for User Experiment
- HallCrew supported in build up
- LAS use --> see SPB/SFX
MID:
HED:
- user experiment being set up
SCS:
SQS:
DRC
PRC
|
367
|
19 Oct 2022, 08:45 |
Andreas Galler | General | Information | Notes XO Integration Meeting 19.10.2022 |
General Announcement:
CTRL:
DA:
EEE:
- Group retreat on Monday, Tuesday next week --> OCD available
- ion pump controller broken in XTD1
VAC:
XPD:
DET:
- 25th of October group retreat
ITDM:
- nothing major
- change of FastX on max-display from FastX2 to FastX3
XRO:
LAS:
- AMPHOS Shutter Laser issue
UNSYS:
- ccell 25 SA1 fixed --> now only 6 motors are left.
- Lead shields ETA beginning of February --> will have to be done through ZZ
- broken motors and encoders are sent back to Beckhoff
- repair time approx. 2 - 3 months
SPB/SFX:
- Laser interlock error
- extra foam 4 center modules from AGIPD
- DOC / DRC to be contacted
- jet motion
- dynamic brake engaged because the cable was loose --> fixed
FXE:
- extra foam issues had been sorted out
- 16 cell mode of Jungfrau not being used
MID:
HED:
- collimated beam showed jitter --> downfocussing reduced the effect
-
SCS:
SQS:
DRC
PRC
|
410
|
12 Apr 2023, 09:23 |
Andreas Galler | General | Information | Notes XO Integration meeting 12.04.2023 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
- successful intervention for Turbo Pump intervention of PES in XTD10
XPD:
- Diamond Detector Study in SA2 on Thu
DET:
ITDM:
- last week was super successful with SPB taking 5 PB of data
- however please provede better estimations, here a factor of 5 overshoot was seen.
XRO:
LAS:
UNSYS:
- one terminal SA3 cell 5 issue over the week --> replaced on Tuesday
SPB/SFX:
- EPS issue SPB_XTD9_IMGPI out siwtch not working --> limited to two pulses --> taken out of EPS interlock
FXE:
MID:
HED:
- excellent performance of the self-seeded x-ray beam last week, for the user experiment #3326 (Fri-Sat).
The beam is very stable both in terms of intensity (700-800 uJ constant) and the pointing jitter! Users were very happy with the performance and the experiment was successful.
SCS:
- issues with electronics
- EEE contacted and Bernard going to support today
SQS:
SXP:
DRC
PRC
|
411
|
17 Apr 2023, 09:26 |
Andreas Galler | General | Information | Notes XO Integration meeting 17.04.2023 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
XRO:
LAS:
UNSYS:
SPB/SFX:
FXE:
MID:
- XRO did alignment in XTD2 --> successful, euler MDL recommissioned
HED:
SCS:
- issues ar being taken care of
SQS:
- XRO investigated damage threshold mirrors
SXP:
DRC
PRC
|
412
|
19 Apr 2023, 09:27 |
Andreas Galler | General | Information | Notes XO Integration meeting 18.04.2023 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
- jhub update went though at 9:00
XRO:
LAS:
- failure of a piazo in the beam stability in SA2, laser is being recovered
UNSYS:
SPB/SFX:
FXE:
MID:
- waiting for laser
- missing data from the JF, and motor
HED:
SCS:
SQS:
SXP:
DRC
PRC
|
433
|
10 Jul 2023, 09:30 |
Andreas Galler | General | Information | Notes XO Integration meeting 10.0723 |
General Announcement:
-
CTRL:
- Bring Up Days start next Monday
DA:
- DA and DET sessions are alwys the same days following CTRL and EEE
EEE:
- nothing to report
VAC:
- VAC is ready for beam
XPD:
- Nothing to report.
DET:
- Nothing to report
ITDM:
- Nothing to report.
XRO:
- nothing to report
LAS:
- Nothing to report.
UNSYS:
- nothing to report
SPB:
- Couple of open things with crates --> EEE in discussion
FXE:
- Nothing to report
MID:
- Nothing to report.
HED:
- Not present.
SCS:
- Not present
SQS:
- Not present.
SXP:
- Not present. |
438
|
26 Jul 2023, 09:21 |
Andreas Galler | General | Information | Notes XO Integration meeting 26.07.2023 |
General Announcement:
- The injector Laser Window had been exchanged yesterday and currently leak search is ongoing. Tuning is expected to start around lunch time.
CTRL:
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
XRO:
LAS:
- PPLAS in SA1 will not be ready this week
- hopefully finished by the end of this week
- please conatct Radu for continuous updates
UNSYS:
SPB/SFX:
- Nothing to repoert ready for beam
FXE:
MID:
HED:
SCS:
SQS:
SXP:
DRC
PRC
|
439
|
02 Aug 2023, 09:27 |
Andreas Galler | General | Information | Notes XO Integration Meeting 31.07.2023 |
CTRL
- still investigating the slowness in SA3 --> which wtachdog is repsonsible
DA:
- not present
EEE:
- nothing to be reported
VAC
- nothing major to report
XPD:
- part of slownwss in SA3 response team with CTRL
DET:
- nothinbg major, and despite beam qualityu some calibration data could be taken
iTDM:
- wil investagete BSASLER 2 issues
XRO:
- nothing major
LAS:
- SA1 AMPHOS service finsihed
- NOPAs are being brought up
SA3:
- spurious switch off of seeder over the weekend, but could be brought up
- comment on LASERMET
UNSYS:
- last week issue with cel9 SA3, undulator was not moving but isue solved
PRC:
- beam was not super performing but some instruent tuning tasks could be done
- SXP wanring light was broken and repaired on Sat
- pointing difference between SQS and SCS leads to delays in tuning by the machine
- the beam should be on the crosshair, and if that needed to be changed XPD can do that easily.
- SA1 FEL imager stalled on Sunday -->
SPB/SFX:
- beam could be used over the weekend, but only calibration constants could be taken or AGIPD
FXE:
- nothing to report
MID:
- beam was used and to a major fraction this was succesful
HED:
- the planned program could be done
SCS:
- nothing to report
SQS:
-
SXP:
- PPLASER couldn't be used |
443
|
14 Aug 2023, 09:30 |
Andreas Galler | General | Information | Notes XO Integration Meeting 14.08.2023 |
General Announcement:
CTRL:
- nothing to report
DA:
- Nothing to report.
EEE:
- Motor issue with SPB
PLC is investigating
VAC:
- All running fine.
XPD:
- Everything fine from XPD.
DET:
- Nothing to add.
ITDM:
- Nothing to report.
XRO:
- Nothing to report.
LAS:
- Nothing to report.
UNSYS:
- Everything is fine.
SPB:
- see motor issue EEE
FXE:
- nothing to report
MID:
- Julabo Chiller
switched off by itself --> curculation stopped
AGIPD not harmed
HED:
- nothing to report
SCS:
- Nothing to report.
SQS:
- Nothing to report
SXP:
- Nothing to report
|
444
|
16 Aug 2023, 09:24 |
Andreas Galler | General | Information | Notes XO Integration Meeting 16.08.2023 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
XRO:
LAS:
UNSYS:
SPB/SFX:
- Issue with Hexapod of sample changer.
FXE:
- not present;
- frequent error with PPODL, locked station --> investigated by CTRL (wajid)
MID:
- Julabo chiller
- switching off recurrenlty
HED:
SCS:
SQS:
SXP:
DRC
PRC
|
445
|
21 Aug 2023, 09:26 |
Andreas Galler | General | Information | Notes XO Integration Meeting 23.08.2023 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
XRO:
LAS:
UNSYS:
SPB/SFX:
- due techincal issues no beamtime
FXE:
MID:
HED:
- not enough intensity to pump samples
- experiment was a partial succes
SCS:
SQS:
SXP:
DRC
PRC
|
458
|
09 Oct 2023, 09:23 |
Andreas Galler | General | Information | Notes XO Integration Meeting 09.10.2023 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
XRO:
- miror setup tuned for grazing incidence with high photon energy.
- higher backlash at M6, XRO is monitoring this.
LAS:
- SA2 treacy compressor smaract stage not operational --> EEE informed
- SA3 AMPHOS still suffering from low puse energy
UNSYS:
SPB/SFX:
FXE:
MID:
HED:
SCS:
SQS:
- uTCA in rack room --> EEE will be informed
SXP:
DRC
PRC
|
462
|
23 Oct 2023, 09:26 |
Andreas Galler | General | Information | Notes XO Integration Meeting 23.10.2023 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
XRO:
LAS:
- SA3 PPLaser up and running
- SA1 PPLaser went down from time to time
- Windows PC crashed
- instabilities in NOPA
UNSYS:
SPB/SFX:
FXE:
MID:
HED:
SCS:
SQS:
SXP:
DRC
PRC
- 2 long down times over the weekend
- from 7 to 12:30 fast valve in BC
- Sun 10:30 - 19:00 broken network switch
|
463
|
25 Oct 2023, 09:26 |
Andreas Galler | General | Information | Notes XO Integration Meeting 25.10.2023 |
General Announcement:
CTRL:
- nothing major --> a couple of people on vacation, i.e. issue repsonse time may be a bit longer this week
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
XRO:
LAS:
UNSYS:
SPB/SFX:
- SA3 background affecting focussing of x-rays
FXE:
- smooth, beam instability yesterday
- horizontal jitter entagled with PopIn measurements --> around lunch time
- beam was clipping and LPD was seeing poweder scattering from the collimator pipe
MID:
HED:
- Yesterday evening unexpected venting in the CRL3 (HED-Optics Hutch) --> X-ray Operation cancelled at least for Wed night
SCS:
- beam instability in pointing over night
- this cuased non optimal beam transport --> pulse energy decreased on sample
SQS:
SXP:
DRC
PRC
- SA1 pulse energy will be lower than possible, because of XGM settings that need to cater 7.8 keV and 12.5 keV
|
503
|
03 Apr 2024, 09:28 |
Andreas Galler | General | Information | Notes XO Integration Meeting 03.04.2024 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
- Leak in SA2 Attenuator
- Arm5, had been removed and a blind flange
- Wajid asks if arm 5 was disabled from the middle layer device --> Mikako set the interlock for this arm and Wajid and MIkako will check together
XPD:
DET:
ITDM:
XRO:
- see VAC ...
- arm5 = CVD 1.2 mm
- spare CVD available,
LAS:
UNSYS:
- cell 11 and cell 34 in SA2 not repsonfing
SPB/SFX:
- nothing to report, AGIPD operational
FXE:
MID:
HED:
- AGIPD didn't send traiIDs for some modules -> fixeed on Monday by DOC
SCS:
SQS:
- easter experiment was good
SXP:
DRC
- HED trainID issue
- related to legacy data aggregators and not understood, but related to the legacy DAQ version from which HED will depart soon
- issue will not be investigated
- HED scheduled for rollout of new DAQ in cw 15
PRC
|
504
|
08 Apr 2024, 09:27 |
Andreas Galler | General | Information | Notes XO Integration Meeting 08.04.2024 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
XPD:
- everything fine, maybe ZZ tomorrow
DET:
ITDM:
- short interuption of DAQ Switch for SA1 tomorrow
- in coordination with CTRL
- GPFS clients on all PClayer servers planned for tomorrow
XRO:
- XTD1 ATT repair planned for next Monday
LAS:
UNSYS:
SPB/SFX:
FXE:
- train issue with JUNGFRAU
MID:
HED:
SCS:
SQS:
SXP:
DRC
PRC
AOB:
- XPD is planning for a ZZ in SA2 tomorrow, UNSYS wishes for ZZ in SA3 --> both topics to be discussed in the following RC meeting
|
505
|
10 Apr 2024, 09:26 |
Andreas Galler | General | Information | Notes XO Integration Meeting 10.04.2024 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
- FES switch reboot in SA2 successful
XRO:
LAS:
UNSYS:
SPB/SFX:
FXE:
MID:
HED:
SCS:
SQS:
SXP:
DRC
PRC
AOB:
|
506
|
15 Apr 2024, 09:31 |
Andreas Galler | General | Information | Notes XO Integration Meeting 15.04.2024 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
- involved in XTD1 solid attenuator repair
- inform control once its done for MDL
XPD:
DET:
ITDM:
- FES switch for SA3 DAQ update will be replaced today --> DAQ won't be available
tomorrow gpfs pclayer update
XRO:
- SA1 Solid Attenuator repair & SA1 21-22 keV beam transport alignment had been done
LAS:
UNSYS:
SPB/SFX:
- beam is prealigned for 21- 22 keV this week, lots user prepartion
FXE:
MID:
HED:
SCS:
SQS:
SXP:
DRC
PRC
AOB:
|
508
|
22 Apr 2024, 09:28 |
Andreas Galler | General | Information | Notes XO Integration Meeting 22.04.2024 |
General Announcement:
CTRL:
- Broker Issue in SA2 on Saturday evening
- LA2 and SA2 topic restarted
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
XRO:
LAS:
UNSYS:
SPB/SFX:
FXE:
MID:
HED:
SCS:
SQS:
SXP:
DRC
PRC
- HED was not taking beam during the SA2 broker issue, as a hardware change was being done
- by 2 am Sunday the systems were recovered and working
AOB:
|