ID |
Date |
Author |
Location |
Severity |
Subject |
458
|
09 Oct 2023, 09:23 |
Andreas Galler | General | Information | Notes XO Integration Meeting 09.10.2023 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
XRO:
- miror setup tuned for grazing incidence with high photon energy.
- higher backlash at M6, XRO is monitoring this.
LAS:
- SA2 treacy compressor smaract stage not operational --> EEE informed
- SA3 AMPHOS still suffering from low puse energy
UNSYS:
SPB/SFX:
FXE:
MID:
HED:
SCS:
SQS:
- uTCA in rack room --> EEE will be informed
SXP:
DRC
PRC
|
462
|
23 Oct 2023, 09:26 |
Andreas Galler | General | Information | Notes XO Integration Meeting 23.10.2023 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
XRO:
LAS:
- SA3 PPLaser up and running
- SA1 PPLaser went down from time to time
- Windows PC crashed
- instabilities in NOPA
UNSYS:
SPB/SFX:
FXE:
MID:
HED:
SCS:
SQS:
SXP:
DRC
PRC
- 2 long down times over the weekend
- from 7 to 12:30 fast valve in BC
- Sun 10:30 - 19:00 broken network switch
|
463
|
25 Oct 2023, 09:26 |
Andreas Galler | General | Information | Notes XO Integration Meeting 25.10.2023 |
General Announcement:
CTRL:
- nothing major --> a couple of people on vacation, i.e. issue repsonse time may be a bit longer this week
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
XRO:
LAS:
UNSYS:
SPB/SFX:
- SA3 background affecting focussing of x-rays
FXE:
- smooth, beam instability yesterday
- horizontal jitter entagled with PopIn measurements --> around lunch time
- beam was clipping and LPD was seeing poweder scattering from the collimator pipe
MID:
HED:
- Yesterday evening unexpected venting in the CRL3 (HED-Optics Hutch) --> X-ray Operation cancelled at least for Wed night
SCS:
- beam instability in pointing over night
- this cuased non optimal beam transport --> pulse energy decreased on sample
SQS:
SXP:
DRC
PRC
- SA1 pulse energy will be lower than possible, because of XGM settings that need to cater 7.8 keV and 12.5 keV
|
503
|
03 Apr 2024, 09:28 |
Andreas Galler | General | Information | Notes XO Integration Meeting 03.04.2024 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
- Leak in SA2 Attenuator
- Arm5, had been removed and a blind flange
- Wajid asks if arm 5 was disabled from the middle layer device --> Mikako set the interlock for this arm and Wajid and MIkako will check together
XPD:
DET:
ITDM:
XRO:
- see VAC ...
- arm5 = CVD 1.2 mm
- spare CVD available,
LAS:
UNSYS:
- cell 11 and cell 34 in SA2 not repsonfing
SPB/SFX:
- nothing to report, AGIPD operational
FXE:
MID:
HED:
- AGIPD didn't send traiIDs for some modules -> fixeed on Monday by DOC
SCS:
SQS:
- easter experiment was good
SXP:
DRC
- HED trainID issue
- related to legacy data aggregators and not understood, but related to the legacy DAQ version from which HED will depart soon
- issue will not be investigated
- HED scheduled for rollout of new DAQ in cw 15
PRC
|
504
|
08 Apr 2024, 09:27 |
Andreas Galler | General | Information | Notes XO Integration Meeting 08.04.2024 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
XPD:
- everything fine, maybe ZZ tomorrow
DET:
ITDM:
- short interuption of DAQ Switch for SA1 tomorrow
- in coordination with CTRL
- GPFS clients on all PClayer servers planned for tomorrow
XRO:
- XTD1 ATT repair planned for next Monday
LAS:
UNSYS:
SPB/SFX:
FXE:
- train issue with JUNGFRAU
MID:
HED:
SCS:
SQS:
SXP:
DRC
PRC
AOB:
- XPD is planning for a ZZ in SA2 tomorrow, UNSYS wishes for ZZ in SA3 --> both topics to be discussed in the following RC meeting
|
505
|
10 Apr 2024, 09:26 |
Andreas Galler | General | Information | Notes XO Integration Meeting 10.04.2024 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
- FES switch reboot in SA2 successful
XRO:
LAS:
UNSYS:
SPB/SFX:
FXE:
MID:
HED:
SCS:
SQS:
SXP:
DRC
PRC
AOB:
|
506
|
15 Apr 2024, 09:31 |
Andreas Galler | General | Information | Notes XO Integration Meeting 15.04.2024 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
- involved in XTD1 solid attenuator repair
- inform control once its done for MDL
XPD:
DET:
ITDM:
- FES switch for SA3 DAQ update will be replaced today --> DAQ won't be available
tomorrow gpfs pclayer update
XRO:
- SA1 Solid Attenuator repair & SA1 21-22 keV beam transport alignment had been done
LAS:
UNSYS:
SPB/SFX:
- beam is prealigned for 21- 22 keV this week, lots user prepartion
FXE:
MID:
HED:
SCS:
SQS:
SXP:
DRC
PRC
AOB:
|
508
|
22 Apr 2024, 09:28 |
Andreas Galler | General | Information | Notes XO Integration Meeting 22.04.2024 |
General Announcement:
CTRL:
- Broker Issue in SA2 on Saturday evening
- LA2 and SA2 topic restarted
DA:
EEE:
VAC:
XPD:
DET:
ITDM:
XRO:
LAS:
UNSYS:
SPB/SFX:
FXE:
MID:
HED:
SCS:
SQS:
SXP:
DRC
PRC
- HED was not taking beam during the SA2 broker issue, as a hardware change was being done
- by 2 am Sunday the systems were recovered and working
AOB:
|
532
|
22 Jul 2024, 09:29 |
Andreas Galler | General | Information | Notes XO Integration Meeting 22.07.2024 |
General Announcement:
-
CTRL:
- nothing major, proceeding with bring up
DA:
- not present
EEE:
- bring up days SPB today, MID tomorrow, SEPS interlock today
VAC:
- nothing to discuss
XPD:
- nothing to report
DET:
- issue with a JF at HED
- one of the ASICS misbehaving
ITDM:
- nothing to report
XRO:
- SA3 Mono
LAS:
- not present
UNSYS:
-
SPB:
- nothing to report
FXE:
- nothing to report
MID:
- damaged roughing pump, needs to be send in
- atm not an issue
HED:
- issue with Hexapod --> IT config had to be corrected
SCS:
- Friday: mechanical problem in one of the chambers, spare parts to arrive today?
SQS:
- not present
SXP:
- not present |
533
|
24 Jul 2024, 09:29 |
Andreas Galler | General | Information | Notes XO Integration Meeting 24.07.2024 |
General Announcement:
-
CTRL:
- last bring up days
DA:
- minor issues fixed during bring up days
EEE:
- nothing
VAC:
- nothing
XPD:
- SA1/2 HiREX working
- Diamond detector small isue
DET:
-
ITDM:
- nothing
XRO:
- ramp up mostly completed --> reports send to all Instruments
- SA3 monochromator back in operation
LAS:
- SA1 all good automatic peak integration of dynamic trigger is being implemented
- SA3: 600 uJ short
UNSYS:
- SA2 cell 10 issue
- EtherCAT communication with
SPB:
- JF4M:
- last week tghe power supply stopped working, with help of DET and EEE the MPOD was made working, hower read out boards would not power trigger
FXE:
- nothing
MID:
- no big isues with bring up days, vacuum is ok
HED:
- JF issue was solved yesterday with replacing the board
SCS:
- bakeout commecning
SQS:
-
SXP:
- |
534
|
29 Jul 2024, 09:27 |
Andreas Galler | General | Information | Notes XO Integration Meeting 29.07.2024 |
General Announcement:
-
CTRL:
- nothing
DA:
- nothing
EEE:
- nothing
VAC:
- nothing
XPD:
- nothing
DET:
- AGIPD comm. data taken
ITDM:
- nothing
XRO:
- attenuator arm 5 is stuck XTD2
- not yet clear if it is a hardware issue.
- limit sitches are stuck --> EEE can move the attenuator
LAS:
- SA1:
UNSYS:
- SA3 cell 11, ZZ needed
-
SPB:
- attenuator issue
FXE:
- not present
MID:
- damage in the fastADC channel
- calibration pipeline crashed ...
HED:
- all good
SCS:
- PLC issues
- parameters lost on PLC level
- some motors don't work correctly
- ELMO motors often go into error states
SQS:
- not present
SXP:
- not present |
535
|
31 Jul 2024, 09:23 |
Andreas Galler | General | Information | Notes XO Integration Meeting 31.07.2024 |
General Announcement:
-
CTRL:
- nothing major
DA:
- nothing major
EEE:
- nothing new
VAC:
- see XRO
XPD:
- nothing
DET:
-
ITDM:
- all system
XRO:
- ZZ for XTD2 solid attenuator
- limit switches of arm5 got llose and were pushed out of the way
LAS:
- all good
UNSYS:
- SA3 cell 11 solved yesterday
SPB:
- all fine
FXE:
- big printer for all instruments, ideally centrally located --> maybe near the XHCrew Operation Center
MID:
- nothing
HED:
- not present
SCS:
- in comm with EEE
SQS:
- not present
SXP:
- not present |
542
|
26 Aug 2024, 09:28 |
Andreas Galler | General | Information | Notes XO Integration Meeting 26.08.2024 |
General Announcement:
- Today Monday 26.08 the beam delivery will be interrupted from 13:30 to 18:30 due to the SRI visit at EuXFEL. These hours are compensated by extending the beam delivery on Tuesday from 7:00AM up to 12:00.
As DRC, Wajid E. informs the DOC shifts are extended to cover the period of delivery on Tuesday morning.
CTRL:
- nothing major
DA:
- nothing
EEE:
- vacuum
VAC:
-
XPD:
-
DET:
- AGIPD Chiller at SPB
ITDM:
- nothing
XRO:
- SA1 limited to 30 bunches at times
- M# Piezo was malfunctioning --> Piezo swapped via ZZ
LAS:
- SA1 service still going
- PP LAS down still being investigated
UNSYS:
- last week successful operation of APPLE-X in circular polarization
- config issue in cell 25 in SA3 had been fixed
SPB:
- AGIPD Chiller --> detector got warmed up on Sat morning. -->
FXE:
- nothing to report
- M3 Piezo did not impact
MID:
- nothing to report
HED:
- nothing
SCS:
- all fine
SQS:
- last week circular polirazation
SXP:
- Laser INterlock issue --> fixed within 30 min
DRC:
- vacuum issue because of broken terminal, everythin worked out well with OCD
- DOC mini shift from 8:00 to 12:00 |
558
|
21 Oct 2024, 09:28 |
Andreas Galler | General | Information | Notes XO Integration Meeting 21.10.2024 |
General Announcement:
CTRL:
DA:
EEE:
VAC:
XPD:
- PES damage
- investigation ongoing
- Thu - Fri increase in retardation voltage destroyed several flight tubes and eTofs
- Polarimetry and 2 color
DET:
ITDM:
XRO:
LAS:
UNSYS:
SPB/SFX:
FXE:
MID:
HED:
SCS:
SQS:
SXP:
DRC
- data reduction mode for SPB/SFX
PRC
AOB:
|
559
|
23 Oct 2024, 09:19 |
Andreas Galler | General | Information | Notes XO Integration Meeting 23.10.2024 |
General Announcement:
CTRL:
- MPOD voltage limiter of PES is being investigated
DA:
EEE:
- see SCS report issues with HXRIXS PLC
VAC:
XPD:
- continuing assessing the damage of the PES, possibly supported by ZZ next week.
- calorimater removed from HED hutch
DET:
ITDM:
XRO:
LAS:
UNSYS:
- presenting Thomas Schmidt
- all fine with undulators , last phae shifter in SA3 (cell 26) ZZ pending
SPB/SFX:
- preparing for IHR, nothing special
FXE:
MID:
HED:
SCS:
- mechanical issues at HRIXS, issues with associated PLC as it was crashing, however EEE (SDilvia and Nerea) brought the PLC back up again
SQS:
SXP:
DRC
- gentle reminder to participate in the DRC journey fixe
PRC
AOB:
|
578
|
13 Jan 2025, 09:29 |
Andreas Galler | General | Information | Notes XO Integration Meeting 13.01.2025 |
General Announcement:
-
CTRL:
- nothing majhor
DA:
-
EEE:
- ZZ on Friday successful.
VAC:
- nothing to report
XPD:
- several issues with devices in the tunnekl, some of which coul be solved from outside, others needed ZZ acces
- MPOD crate in XTD10 needed to be revived
- XTD6 MCP base detector issue --> root cause found: issue in the PLC due to a failing power supply --> ZZ scheduled for today together with Benoit
- Thursday K-Mono
DET:
- Nothing to report.
ITDM:
- Nothing to report.
XRO:
- preparing for next week startup
-
LAS:
- Not present.
UNSYS:
- Everything is fine.
SPB:
- Nothign to report.
FXE:
- Not present
MID:
- All fine at MID.
HED:
- All fine.
SCS:
- Nothing to report.
SQS:
- Not present.
SXP:
- nothing to report. |
589
|
19 Feb 2025, 09:29 |
Andreas Galler | General | Information | Notes XO Integration Meeting 19.02.2025 |
General Announcement:
-
CTRL:
- nothing major to report
DA:
- everything in order
EEE:
- issue lens1 y crl1in SA1
- seps interlock switches are not operational --> lens1 not operational and blocked for operation
VAC:
- nothing to report, regarding the CRL1 lens1 Benoit should be involved and Nerea confirms that he is
XPD:
- no issues to report
DET:
- nothing major, FXE LPD Q2M2 is back in operation
ITDM:
- nothing to report
XRO:
- nothing
LAS:
- nothing to report
UNSYS:
- mitigation -->BKR now has a reset button available in doocs enabling them to reset any error during wavelength scans on their own
SPB:
- nothing to report
FXE:
- noting to report
MID:
- nothing to report
- MID is kindly asked to share HXRSS perfomance from the MID point of view over the week.
HED:
- nothing to report
SCS:
- instrument setup change with support from XHCrew
SQS:
- nothing to report
SXP:
- not present |
590
|
24 Feb 2025, 09:26 |
Andreas Galler | General | Information | Notes XO Integration Meeting 24.02.2025 |
General Announcement:
-
CTRL:
- nothing major
DA:
- nothing major
EEE:
- DOC call wrt AGIPD, possibly chiller
VAC:
- nothing
XPD:
- PES in XTD10, prevcauum got worse now at 6x10E-1 mbar.
DET:
- MID AGIPD chiller issue being investigated
ITDM:
- nothing to report
XRO:
- nothing major
LAS:
- not present
UNSYS:
- nothing to report
SPB:
- SPB useres request more computation nodes on Maxwell
FXE:
- issue with PicoMotors over the weekend, already solved
MID:
- issues with cryo jet --> vacuum problem triggered warm up of AGIPD
- during warm up there was ice formation in the Silicon oil, but after resolving the AGIPD could be cooled down again.
- seeeding looks ok
HED:
- all good
SCS:
- not present
SQS:
- not present
SXP:
- nohting, all set
SRP
- SQS couldn't open AMPHOS shutter, however resetting the AMPHOS interlock box solved the issue
- Eric informs on CRL1 seps issue to bfixed in tomorrows ZZ. |
591
|
26 Feb 2025, 09:24 |
Andreas Galler | General | Information | Notes XO Integration Meeting 26.02.2025 |
General Announcement:
-
CTRL:
- nothing major
DA:
- nothing major
EEE:
- PLC large detector mover worked yesterday but not on the weekend (MID)
- CRL1 Lens2Y SA1 encoder not working
VAC:
- only minor thing
XPD:
- ZZ yesterday
- pre vacuum for PES in XTD10, solved quickly and things back to normal. --> a valve was not completely closed putting load on the scroll pump thus in
DET:
- Nothing major
ITDM:
- nothing to report
XRO:
- access to XTD2
- exchanging proximity sensor for lens1y in CRL1, XTD2
- checked SRA on issues
LAS:
- not to report
UNSYS:
- nothing to report
SPB:
- nothing to report
FXE:
- CRL5Y motor issue in hutch, solved with help of Moises, tolerance had to be tweaked.
MID:
- all fine and thanks to EEE for helping with the large detector mover.
HED:
- all good
SCS:
- nothing to report
SQS:
- not present
SXP:
- nohting, all set |
604
|
14 Apr 2025, 09:26 |
Andreas Galler | General | Information | Notes XO Integration Meeting 14.04.2025 |
General Announcement:
CTRL:
- two issues with GUI Server at MID
- server resatrted no further imapct on operation
DA:
EEE:
VAC:
XPD:
DET:
- nothing major
- Alessandro :DOC call on Saturday
- HV of MID AGIPD was turned off between 3:40 - 3:50 on the 12.April
ITDM:
- reminder, maintenance this week on Maxwell ...
- 3:00 contrl node in BR lost connection between DOOCS and SA1 Undulators 11.04. (03:00 am) reported by Suren
XRO:
- MID observed beam jitter on mirrors
LAS:
UNSYS:
- all fine besides above mentioned issue (ITDM)
- cell 26 APPLE-X
- 2 isues, first triggered by loss of control server
- 2nd, issue with tilt server --> operation of girders are stopped when the tilt sensor runs into thresholds.
SPB/SFX:
FXE:
MID:
HED:
SCS:
SQS:
SXP:
- nothing experiment working
DRC
PRC
- no major issues and weekend super quiet
- cell 26 issue with APPLE-X
- cell was open and could not be controlled
AOB:
|