Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 213     Entry time: 07 Apr 2021, 08:52
Author: Andreas Galler 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 07.04.2021 

General Announcement:

  • .

CTRL:

  • recurrent error reprted by LAS  --> drift compensation in SA2 --> need feedback
  • minor issues reported instruments during startup

DA:

  •  

EEE:

  • Issue on April 4th --> 4 PLCs shut down without a cause, (looks like power cut)
  • MID crate went down at 9:00
  • SA3 utca shut down (could be voltage drop, could be ehternet) (9:35)

VAC:

  • VAC-OCD recovered SA2 vacuum state (valves, and ystem) (see EEE SA2 incident above)
  • VAC obseved that the MID Mono warmed up, the cryo warmed up presumably after a PLCs update which interrupted an interloop communication

XPD:

  • nothing report

DET:

  • everything running fine

ITDM:

  • SA1 baclony room checked
    • some racks lost power --> investifation going on (possibly happened on Sat. Apr 3rd 8:00 am)

XRO:

  • incorrect motor velocity in SA3 --> fixed
  •  

LAS:

  • small issue in SA2 with slow feedback --> see CTRL report

UNSYS: 

  • problem on SA1 central control node, after a power cycle aircoils and phase shifters were unresponsive

SPB/SFX:

  • Laser Interlock issue was solved, power spike involved that reported by MEA3 ( klaus Witt).

FXE:

  • no issues

MID:

  • M1 mirror was moved completely out on 1st of Apr.
    • --> Naresh Kujala moved M1 out.

HED:

  • Laser interlock issue on Tuesday
  • with regards to the MID Mono cryo, there had been HED PLC updates
  • calibration pipeline issue on AGIPD
  • HED utca in optics hutch went off

SCS:

  • no issues

SQS:

  •  