Group Selection Page
HELP
Controls Group
Data Analysis Group
ITDM
WP76
DET
Vacuum
EEE
WP78
FXE
SPB
MID
HED
SQS
SXP
Sample Environment
Operation
PSPO
XO
TS
Migrated2Zulip
|
Technical integration and coordination
SASE1 Status and SASE3 Readiness
|
Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther |
Not logged in |
 |
|
Message ID: 267
Entry time: 11 Oct 2021, 09:27
|
Author: |
Andreas Galler |
Location: |
General |
Severity: |
Information |
Subject: |
Notes XO Integration Meeting 11.10.2021 |
|
|
General Announcement:
CTRL:
DA:
EEE:
- several motors in SPB/SFX had trouble, all originating from the same crate
VAC:
- VAC problems at HED last Wed
- monochromator section in the tunnel, two unidentified vacuum bursts
XPD:
DET:
ITDM:
XRO:
- FXE (PZ) reported a large jump in the bender setting, sebsequently Ry and pitch drifted for days and stabilized later
- M1 M2 alignment changed as well
- currently stable and being investigated
LAS:
UNSYS:
SPB/SFX:
- unstable pulse energy jittering ~ 35% over days.
FXE:
- Experiment went well, apart from minor issue with calibration pipeline with JF
MID:
HED:
SCS:
SQS: