Subject: Notes XO Integration Meeting 11.10.2021 

General Announcement:

  •  

CTRL:

  • nothing report

DA:

  • nothing to report

EEE:

  • several motors in SPB/SFX had trouble, all originating from the same crate

VAC:

  • VAC problems at HED last Wed
    • monochromator section in the tunnel, two unidentified vacuum bursts

XPD:

  • nothing to be reported

DET:

  • nothing to report

ITDM:

  • nothing to report

XRO:

  • FXE (PZ) reported a large jump in the bender setting, sebsequently Ry and pitch drifted for days and stabilized later
    • M1 M2 alignment changed as well
    • currently stable and being investigated

LAS:

  • nothing to report

UNSYS: 

  • nothing to report

SPB/SFX:

  • unstable pulse energy jittering ~ 35% over days.

FXE:

  • Experiment went well, apart from minor issue with calibration pipeline with JF

MID:

  • all fine

HED:

  • nothing to report

SCS:

  • not present

SQS:

  • not present

AOB:

  •  