Entry   Notes XO Integration Meeting 05.08.2020, posted by Andreas Galler on 05 Aug 2020, 09:02 
General Announcement:


.


CTRL:


SA3 vac loop

devices lose connection to the PLCs every now and then (every few days)


karabo
Entry   Notes XO Integration Meeting 03.08.2020, posted by Andreas Galler on 03 Aug 2020, 09:23 
General Announcement:


.


CTRL:


few issues on SA3 vacuum server, over the weekend.

twice some devices were not running,
when restarting Beckhoff
Entry   Notes XO Integration Meeting 29.07.2020, posted by Andreas Galler on 29 Jul 2020, 08:59 


General Announcement:


.


CTRL:
Entry   Notes XO Integration Meeting 27.07.2020 , posted by Andreas Galler on 27 Jul 2020, 09:05 


General Announcement:


XO discusses the need for sharing information.


CTRL:
Entry   XO integration meeting 22.07.2020, posted by Andreas Galler on 22 Jul 2020, 09:22 
General Announcement:


Default beam positions are being implemented for each SASE at the FEL imager to reduce re-alignment offers for the instrumetns after
shutdowns and facility development weeks


CTRL:
Entry   Notes XO Integration Meeting 20.07.2020, posted by Frederik Wolff-Fabris on 20 Jul 2020, 14:18 
General Announcement:
- Regarding Operation, VAC and PRC had a workaround to restore the North branch beam permission on Sunday. 
- XTD9 Turnstiles were not working this morning for ZZ access planned by FXE. 
Entry   Notes XO Integration Meeting 15.07.2020, posted by Frederik Wolff-Fabris on 17 Jul 2020, 10:19 
General Announcement:
- SASE3 tuning will start this afternoon and possibly will last until Thursday afternoon. SCS and SQS will share the closures of their hutches.
Entry   Notes XO Integration Meeting 13.07.2020, posted by Frederik Wolff-Fabris on 14 Jul 2020, 13:45 
General Announcement:
- XO will reset the calendar invites for the XO Integration Meetings of Mondays and Wednesdays as well as for the User&Operation Meetings on Fridays. Usual
times will be 
Entry   Notes XO Integration Meeting 08.07.2020, posted by Frederik Wolff-Fabris on 10 Jul 2020, 13:50 
General Announcement:
- Machine start-up continues to be ahead of schedule. Beam transmission to T4D and T5D has been done during the night (with open undulators). 
- An Invitation for the User&Operation Meeting on next Friday 09:00 was sent to the user&opmeeting mailing list. If you did not receive it, please contact
Entry   Notes XO Integration Meeting 06.07.2020, posted by Frederik Wolff-Fabris on 07 Jul 2020, 13:23 
General Announcement:
- Since the end of the shutdown last Friday, the current Program is "Access/Tuning/Setup";
- DESY/MXL has started ramping up the Gun, powering and testing the Magnets and phasing the RF stations. 
Entry   Notes XO Integration Meeting 03.07.2020, posted by Frederik Wolff-Fabris on 03 Jul 2020, 14:21 
General Announcement:
- The Interlock tests are finished in all tunnels and XHEXP1 areas, following information from D3 and SRP.
- From next week we will continue with XO Integration Meeting only on Mondays and Wednesdays at 09:00. The Fridays' XO Int. Meetings will be terminated.
Entry   Notes XO Integration Meeting 01.07.2020, posted by Frederik Wolff-Fabris on 01 Jul 2020, 13:53 
General Announcement:
- Interlock tests are starting in SASE3 instruments right now. Zunaira, Eric and Wolfgang Clement are coordinating the TUV tests in the XHEXP1.
- MXL announced a draft for the machine start-up schedule which is published at the BKR e-log. The link to the schedule is: 
Entry   Notes XO Integration Meeting 29.06.2020, posted by Frederik Wolff-Fabris on 30 Jun 2020, 08:50 
General Announcement:
- The Photon Run Coordinator will re-start next Friday July 3rd. Please also feel free to contact him/her (9-4800) for daily coordination and communication
with the 
Entry   Notes XO Integration Meeting 24.06.2020, posted by Frederik Wolff-Fabris on 25 Jun 2020, 10:27 
General Announcement:

- Exceptionally next Friday the XO Intergration Meeting will not take place. The meeting will resume next Monday. 
Entry   Notes XO Integration Meeting 22.06.2020, posted by Frederik Wolff-Fabris on 23 Jun 2020, 14:12 
General Announcement:
- The User & Operation Meeting that took place at beginning of this year on Fridays will re-start on July 10th. 
Proper announcement and Zoom link will be sent. In this context, the XO Integration Meeting will continue only on Mondays and Wednesdays. 
Entry   Notes XO Integration Meeting 19.06.2020, posted by Frederik Wolff-Fabris on 19 Jun 2020, 14:28 
General Announcement:
- Next Monday it is planned the NOT-AUS experiment in the frame of Interlock tests and the emergency off will be disabled. 
Only groups with EQP persons can continue working in the hutches. An e-mail was sent by TS.
Entry   Notes XO Integration Meeting 17.06.2020, posted by Frederik Wolff-Fabris on 18 Jun 2020, 13:40 
General Announcement:
- Today and tomorrow it takes place the tunnel ventilation maintenance between 6:30 and 8:00AM;
- An e-mail was sent to readiness list with tunnel access restrictions for next Friday morning at the Osdorf Born site in and XTD4 work between 10-11AM.
Entry   Notes XO Integration Meeting 15.06.2020, posted by Frederik Wolff-Fabris on 16 Jun 2020, 13:32 
General Announcement:
- There will be additional ventilation maintenance on all tunnels, scheduled for next WED/17th and THU/18th between 06:30AM and 08:00AM. 
We request staff to do not enter in tunnels during this period.
Entry   Notes XO Integration Meeting 12.06.2020, posted by Frederik Wolff-Fabris on 12 Jun 2020, 13:48 
General Announcement:
- There will be tunnel ventilation additional maintenance on two mornings next week from 6:30 to 8:00AM. An e-mail to Readiness list will be send when
dates are known.
Entry   Notes XO Integration Meeting 10.06.2020, posted by Frederik Wolff-Fabris on 10 Jun 2020, 11:12 
General Announcement:
- Maintenance in the Tunnel Air Conditioning is completed. No more work restrictions are in place besides the regular COVID-19 rules. 