Group Selection Page HELP Controls Group Data Analysis Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB MID HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 24 of 31  Not logged in ELOG logo
ID Date Author Location Severity Subjectdown Text Attachments
  380   07 Dec 2022, 12:06 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.12.2022General Announcement:
- Tobias Clever informs to contact TS (Oleg
E.) in case of broken fuses (see UNSYS).
  
  184   07 Dec 2020, 11:08 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.12.2020General Announcement:
-  
  
  371   07 Nov 2022, 09:57 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.11.2022General Announcement:
- Jan Gruenert, as PRC, reports on the Saturday
night access (SA2 remained running) and on
  
  554   07 Oct 2024, 09:54 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.10.2024General Announcement:
- A. Galler informs a power glitch happened
today at around 07:40AM, however machine
  
  167   08 Oct 2020, 08:52 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.10.2020General Announcement:
- Discussion on access rights based on FXE
issue:
  
  356   07 Sep 2022, 10:43 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.09.2022General Announcement:
- With respect to the X-ray delivery parameters
table: it is pre-filled with parameters agreed
  
  158   07 Sep 2020, 14:37 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.09.2020General Announcement:
- XO thanks instruments and support groups
for using the E-logs while reporting activities.
  
  537   07 Aug 2024, 09:38 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.08.2024General Announcement:
- A. Galler informs to SQS that the vertical
polarization operation is planned for Thursday
  
  441   07 Aug 2023, 09:50 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.08.2023General Announcement:
-  A. Silenzi is the DRC for this week and
will send an e-mail to instrument local contacts
  
  240   07 Jul 2021, 09:14 Andreas GallerGeneralInformationNotes XO Integration Meeting 07.07.2021

General Announcement:


 


CTRL:
  
  424   07 Jun 2023, 10:35 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.06.2023General Announcement:
- As PRC, Jan G. says that overall the start
on Monday was difficult but no major issues
  
  231   07 Jun 2021, 10:29 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.06.2021General Announcement:
- Accelerator has been shutdown this morning
and the Summer/21 maintenance period has
  
  610   07 May 2025, 09:50 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.05.2025General Announcement:
-  
  
  602   07 Apr 2025, 09:42 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.04.2025General Announcement:
- Reminder from A. Galler: please use the
Operations e-log to report issues or comments
  
  213   07 Apr 2021, 08:52 Andreas GallerGeneralInformationNotes XO Integration Meeting 07.04.2021

General Announcement:


.


CTRL:
  
  306   07 Mar 2022, 10:39 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.03.2022 General Announcement:
- Accelerator is now running at 11.5GeV for
the next 4 delivery weeks. The SA1 and SA3
  
  488   07 Feb 2024, 10:29 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.02.2024General Announcement:
-  
  
  298   07 Feb 2022, 10:56 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.02.2022General Announcement:
-  Power glitch on Sunday morning at around
04:00AM seems to have no effect at machine
  
  475   06 Dec 2023, 09:49 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 06.12.2023General Announcement:
- Jan Gruenert announces a seminar done by
UK guests from Daresbury on UK plans for
  
  284   06 Dec 2021, 11:54 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 06.12.2021General Announcement:
- Cooling water situation at XHQ: initially
there is no cooling water until possibly
  
ELOG V3.1.4-7c3fd00