ID Date Author Location Severity Subjectdown Text Attachments
  66   10 Jul 2019, 16:16 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 10.07.19 XO


In SASE3 the apertures
of the GATT have to be realigned. The upstream
  
  31   10 Apr 2019, 10:54 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 10.04.19 SPB/SFX


CRL implementation in the
hutch. Tests can start today.
CSS
  
  40   08 May 2019, 10:10 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 08.05.19 SPB/SFX


IRDa commissioning
ongoing. 
CSS. Limit switches
 Technical_Integration_Meeting_07.05.2019_-_Copy.pptx 
  77   07 Aug 2019, 11:55 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 07.08.2019XO

The accelerator is now working
at 2.25 MHz. Kicker can be used. DET informs
 Technical_Integration_Meeting_07.08.2019_-_Copy_(4).pptx 
  16   06 Mar 2019, 10:31 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 06.03.19 SPB/SFX


CSS component commissioning.
Concept and implementation finalized. EPLAN
  
  4   06 Feb 2019, 11:13 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 06.02.19 SPB/SFX


AGIPD commissioning and
tests. ==> intervention on the wings is
  
  51   05 Jun 2019, 09:59 Gerd WellenreutherGeneralInformationMinutes of the Technical integration meeting 05.06.2019FXE

SPB/SFX


few days of beamtime
  
  63   03 Jul 2019, 10:18 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 03.07.19 XO


In SASE3 the apertures
of the GATT have to be realigned. The upstream
  
  28   03 Apr 2019, 10:44 Adriano ViolanteGeneralInformationMinutes of the Technical integration meeting 03.04.19 SPB/SFX


CRL implementation in the
hutch. Cables at the back of the crate have
  
  20   15 Mar 2019, 11:27 Adriano ViolanteGeneralInformationMinutes after dispatch meeting 09.00SPB/SFX


No major issues reported
Motors
in Loop 14 have been tested and problems
  
  6   11 Feb 2019, 09:59 Adriano ViolanteGeneralInformationMInutes of the dispatch meeting 09.30SPB/SFX


Beam is back on Wed. night.
IT
cables in D.23 were re-measured on friday.
  
  11   22 Feb 2019, 12:36 Adriano ViolanteGeneralInformationMInutes of the dispatch meeting 09.00SPB/SFX


Pulse picker commissiong
- Issues concerning motors position and triggers
  
  75   02 Aug 2019, 09:10 Adriano ViolanteGeneralInformationInfo on dispatch meeting 09.00The meeting did not take place since only
EEE was attending.
  
  Draft   30 Mar 2020, 08:57 Andreas Galler   CTRL:


Broker Pile Up in 4 topics
over the weekend

LAS affected
  