Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 258     Entry time: 08 Sep 2021, 10:06
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 08.09.2021 
General Announcement:
- Quick report of yesterday incident of water running down to XHEXP1: a washing machine in the clean room at ground level leaked; the water went down to the SA4/5 area of XHEXP1. 
Both ground floor and XHEXP1 floors were wet. The washing machine is taken out of service.

CTRL:
- The ticketing system "control-integration" is working again and can be used.

DA:
- Nothing to report.

EEE:
- Fast electronics announcement: tomorrow late afternoon EEE will apply the fix to DSSC camera to correct train-IDs.

VAC:
- A test on the signal optimization in SA3 vacuum loop was done. VAC found a fix that will be applied during the shutdown (together with CTRL, EEE).

XPD:
- Nothing to report.

DET:
- pnCCD risk analysis: DET says that there is a path to avoid accident again and has been discussed with instrument. The misbehavior of the bottom module is to be investigated and replaced.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Improvement of sync system in SA3 laser hutch took place this week. The laser is available to instruments.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to add.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Nothing to report.