Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 299     Entry time: 09 Feb 2022, 10:09
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 09.02.2022 
General Announcement:

CTRL:
- GATT broker pile up: there is a fix available but not foreseen to be updated now. The middle layer will be fixed in cw09 (blue week). This will be coordinated with XO. 
- Raul V. completes that 1. slowness of the GATT from last week can be fixed next Monday (which triggers a pile up); 2. More invasive changes mentioned by Wajid E. to be done in a later point. 
- Wajid E. adds that if problems appear again (unresponsive middle layer), please call DOC.

DA:
- Nothing to report.

EEE:
- Finishing smaller tasks.
- Fast ADC issue is taken over by the fast electronics team. The cooling issue may be related to connection problems with the board. EEE monitors if last Monday fix was enough. 

VAC:
- Nothing else apart of the GATT discussion.

XPD:
- XGM issue in XTD2: someone changes the settings leading to an overload in the XGM. A. Galler says that BKR operators did not touch it and one still looks to find who triggered the changes.
- Calorimeter and laser polarimeter to be installed at FXE on next days.
- A. Koch says there was an update of the DAQ in tunnels; that was tested on Monday afternoon and if problems are found, please contact A. Koch.

DET:
- Nothing to report.

ITDM: 
- Nothing to report apart from ground floor room 604 work. 

XRO:
- XRO contact control integrations to work on motor layer devices for March.

LAS:
- Nagios Karabo system still do not work.

UNSYS:
- Nothing apart of the smaller gap limitation in SA2 system for the 2-color test last Monday.

SPB:
- Nothing to report.

FXE:
- Hiccup with train-IDs not being synchronized: a ticket was sent to CTRL.

MID:
- All fine at MID.

HED:
- Not present.

SCS:
- Issues with middle layer devices that had to be restarted: Laurent M. will check on the status with SCS colleagues.

SQS:
- Issue with XTD10 PES digitizer: there is an open ticket in progress.
- Trigger of hutch shutter last week: the loose maglock has been addressed.