Notes XO Integration Meeting 10.11.2021, posted by Frederik Wolff-Fabris on 10 Nov 2021, 10:16
|
General Announcement:
-
|
Notes XO Integration Meeting 08.11.2021, posted by Frederik Wolff-Fabris on 08 Nov 2021, 10:07
|
General Announcement:
- During the weekend there was a cryo plant failure which caused more than 30 hours downtime. This was due to the cold compressor failure on Friday evening.
|
Notes XO Integration Meeting 03.11.2021, posted by Frederik Wolff-Fabris on 03 Nov 2021, 10:12
|
General Announcement:
-
|
Notes XO Integration Meeting 01.11.2021, posted by Frederik Wolff-Fabris on 01 Nov 2021, 10:10
|
General Announcement:
- XO is currently setting scheduling meetings with the groups for planning and cross-checking the preparation for the Winter maintenance 2021. Meetings
will take place between this and next week.
|
Notes XO Integration Meeting 27.06.2021, posted by Frederik Wolff-Fabris on 27 Oct 2021, 10:34
|
General Announcement:
-
|
Notes XO Integration Meeting 25.10.2021, posted by Frederik Wolff-Fabris on 25 Oct 2021, 10:50
|
General Announcement:
- An e-mail was sent to "xo-info" mailing list concerning the cooling water maintenance scheduled for one week starting on Dec. 6th.
More information will be sent by the end of this week and if you have any concerns, please contact us at xo-planning@xfel.eu.
|
Notes XO Integration Meeting 20.10.2021, posted by Frederik Wolff-Fabris on 20 Oct 2021, 10:28
|
General Announcement:
- XO received some enquires on the status of the winter maintenance scheduling: We have about 750 tasks submitted and we are currently analyzing all of
them to spot conflicts to be solved as well as
|
Notes XO Integration Meeting 18.10.2021, posted by Frederik Wolff-Fabris on 18 Oct 2021, 10:14
|
General Announcement:
-
|
Notes XO Integration Meeting 13.10.2021, posted by Andreas Galler on 13 Oct 2021, 09:26
|
General Announcement:
This meeting is a tool to share information/experiences across scientific and technical groups
CTRL: |
Notes XO Integration Meeting 11.10.2021, posted by Andreas Galler on 11 Oct 2021, 09:27
|
General Announcement:
CTRL: |
Notes XO Integration Meeting 06.10.2021, posted by Andreas Galler on 06 Oct 2021, 09:28
|
General Announcement:
CTRL: |
Notes XO Integration Meeting 04.10.2021, posted by Andreas Galler on 04 Oct 2021, 09:30
|
General Announcements
none
|
Notes XO Integration Meeting 29.09.2021, posted by Frederik Wolff-Fabris on 29 Sep 2021, 09:49
|
General Announcement:
- Tomorrow 30.09 is the deadline to submit the winter maintenance task list. In case of questions please do not hesitate in contacting XO.
|
Notes XO Integration Meeting 27.09.2021, posted by Frederik Wolff-Fabris on 27 Sep 2021, 10:06
|
General Announcement:
- The subscription for the User and Operation mailing list can be found at the regular announcements. Please forward the e-mail to new colleagues who are
interested in getting the meeting link.
|
Notes XO Integration Meeting 22.09.2021, posted by Frederik Wolff-Fabris on 22 Sep 2021, 09:47
|
General Announcement:
- A reminder that in case staff members suffer from cold symptoms, please remain at home and do home-office.
- TS informs the restrooms at XHEXP1 are out of service. The fix is under way.
|
Notes XO Integration Meeting 20.09.2021, posted by Frederik Wolff-Fabris on 20 Sep 2021, 10:19
|
General Announcement:
- On last week's cryogenic failure at the machine: the root cause is tracked to a failed temperature sensor that bring down several pumps.
|
Notes XO Integration Meeting 15.09.2021, posted by Frederik Wolff-Fabris on 15 Sep 2021, 10:37
|
General Announcement:
- Machine stop running yesterday around 21:00 due to problems with the cold compression. A repair was done during the night but there are not yet stable
conditions. It is unclear at what time today the
|
Notes XO Integration Meeting 13.09.2021, posted by Frederik Wolff-Fabris on 13 Sep 2021, 10:04
|
General Announcement:
-
|
Notes XO Integration Meeting 08.09.2021, posted by Frederik Wolff-Fabris on 08 Sep 2021, 10:06
|
General Announcement:
- Quick report of yesterday incident of water running down to XHEXP1: a washing machine in the clean room at ground level leaked; the water went down to
the SA4/5 area of XHEXP1.
|
Notes XO Integration Meeting 06.09.2021, posted by Frederik Wolff-Fabris on 06 Sep 2021, 11:00
|
General Announcement:
- XO thanks the instruments for posting in the Operations e-log.
- Jan G. says calorimeter measurements last Friday on HED hutch took place in order to measure transmission of pulse energy in the hutch and compare with |