SPB emergency power off tests, posted by Torsten Schoen on 17 Apr 2018, 14:23
|
Dear all,
the emergency power off test has been successfully performed in SPB.
Nobody can instantly cut the power to non hazardous racks (see racklist.xlsx managed by Ulf Brueggmann) by pushing the emergency off button anymore. |
Status report after dispatch meeting 13:00, posted by Adriano Violante on 16 Apr 2018, 14:20
|
Summary of Karabo 2.2.3 deployment dates:
Karabo 2.2.3 deployed in SASE3 tunnels last friday ==> no major issues. DAQ can be deployed
Karabo in SASE2 Tunnels to
be deployed today at 14:00
Karabo in SASE1 Tunnels to be deployed tomorrow at 08:00
Karabo in SPB/SFX experiment to be deployed |
Emergency off test in FXE - Update and next steps, posted by Adriano Violante on 16 Apr 2018, 12:38
|
Dear all,
I was just informed by Ulf Brueggmann that the emergency power off test was successfully performed in FXE. |
Shutdown MicroTCA4 SPB and FXE, posted by NEREA JARDON on 13 Apr 2018, 13:50
|
This entry is on behalve of Frank Babies, if you have any doubt about it, contact him:
On 16.Apr.2018 09:45am till Noon I have to shutdown the MicroTCA4 Crates Rackroom from FXE
"fxe-rr-sys-utc-1" |
Dates TÜV Test SASE3 Intelrocks, posted by Adriano Violante on 13 Apr 2018, 13:01
|
Interlock systems SASE3 - TÜV test
The pre test by D3 will be held on 20.06.
On 05.07.The TÜV Test for SASE3 will be done together with the SASE2 test and the repetition of the SASE1 test |
Emergency off test in SPB/FXE, posted by Adriano Violante on 13 Apr 2018, 09:40
|
Emergency power test will be performed at the following dates:
FXE - Mon. 16.04.
SPB - Tue. 17.04. |
SASE3 E.21 and E.22 electrical power distribution, posted by Torsten Schoen on 13 Apr 2018, 09:05
|
changes according to the racklist on the electrical power distribution cabinets for rackrooms E.21 and E.22 are done. Power supply should be stable now.
Please note that there will be emergency power off tests prior to the final acceptance test of SASE3 electrical installations around mid of May. You will
be notified about the exact time and date. |
Karabo 2.2.3 installation, posted by Adriano Violante on 13 Apr 2018, 07:50
|
Hi all, for your information below a message from Chris Youngman concerning Karabo 2.2.3 installations in SASE3.
"preparation work has concluded and we will definitely try to deploy Karabo 2.2.3 on SA3 machines TODAY
13.04.. SA3 s/w will not work from 8:00 on. Hopefully we will finish during the morning. |
Water cooling mointenance by MKK done, posted by Adriano Violante on 12 Apr 2018, 15:34
|
Die Arbeiten an der Kühlwassersteuerung konnten innerhalb des genannten
Zeitraums abgeschlossen werden,
so dass die Kühlwasserversorgung nun schon einige Zeit wieder geregelt |
Status report after dispatch meeting 13:00, posted by Adriano Violante on 11 Apr 2018, 13:48
|
SPB
Detector z motion would be needed. AE checks the status of the crate. still pending
MIrrors installation ongoing. NO ACCESS
to D.02!!!!
Laser Interlock change of logic by K.Witt will be done on monday at 9:00
Karabo update installation dates being agreed |
Karabo deployment dates, posted by Adriano Violante on 09 Apr 2018, 14:37
|
FYI
Below the E-Mail from Hugo Santos with the Karabo deployment dates.
|
Status report after dispatch meeting 13:00, posted by Adriano Violante on 09 Apr 2018, 14:25
|
General
Emergency off test in SPB is shifted. Date to be agreed on Friday. FXE test stays on 16.04. TS will confirm that.
MKK will shut down the cooling water for Tunnels and XHEXP1 on Thursday startin from 11:00 for maintenance purposes. |
Emergency off test in SPB/FXE - Update, posted by Adriano Violante on 09 Apr 2018, 11:50
|
Due to some delay in the installation of some necessary cables, the emergency power off test foreseen for today 06.04. in the SPB experiment will
not take place.
The details will be reported by Ulf Brueggmann today in the dispatch meeting at 13:00. The needed cabling should be done this week, so that the test |
maintenance of the online storage system, posted by Janusz Szuba on 04 Apr 2018, 17:46
|
On Friday, 6.04, there will be a maintenance of the online storage system. This will tackle the issues we had just before the last user beamtimes, when
we decided to apply workaround to keep the system working. The availability of the storage system is not guaranteed, especially when faulty h/w parts needs
to be exchanged. |
Control network maintenance, posted by Janusz Szuba on 04 Apr 2018, 17:35
|
Tomorrow, 5.04, between 9:30 and 12:00 there will be urgent maintenance of one of the two redundant main switches for the control network. The network
connectivity during that time is not guaranteed, but also any major interruptions are not expected. For the two switches in sase1 tunnels with only one
uplink, there could be short (~1min) interruption. |
Status reports after dispatch meeting 13:00 4.4., posted by Gerd Wellenreuther on 04 Apr 2018, 13:43
|
SPB/SFX:
Mirror installation next week
FXE:
Replaced broken diamond-window
SCS: |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 28 Mar 2018, 15:22
|
SPB
Sample delivery installed. Tonight will be commissioned. Experiment set-up starts tomorrow night
FXE
Digitizers were already implemented in the DAQ but there is an issue related to the Karabo device. CAS already looking into that.
AE |
Re: Status report after dispatch meeting 09.30, posted by Hugo Silva Santos on 29 Mar 2018, 09:48
|
Update regarding Digitizer:
----- Forwarded Message -----
From: "hamed sotoudi namin" <hamed.sotoudi.namin@xfel.eu> |
XTD1 open, posted by Jan Gruenert on 27 Mar 2018, 14:18
|
Info from BKR: the southern tunnels were opened, thus XTD1 can be accessed now. |
Status report after dispatch meeting 09.30, posted by Adriano Violante on 26 Mar 2018, 13:10
|
General
Due to the triggering of the emergency power off in FXE caused by electrical works being done on Sunday, FXE and SPB lost beam and electronics
was switched off. In general the efficiency of the communication between groups has to be impoved. An important first step is the publication to a easy |
FXE emergency power-off has been triggered, posted by Gerd Wellenreuther on 25 Mar 2018, 10:57
|
Dear all,
apparently the Emergency Power-Off at FXE was triggered at around 10:00 - 10:30 (my estimate). As far as I know power has been switched on again.
BKR / PRC have been informed. More information will be provided by TS / Torsten Schön soon. |