| ID | Date | Author | Location | Severity | Subject | Text |  | 
| 94 | 08 Jan 2020, 12:36 | Adriano Violante | General | Information | Report of the Technical integration meeting | SPB: 
 
 Coordinatd motion for MC2
 motors is going to be rolled out by EEE soon.
 
 
 FXE:
 |  | 
| 93 | 18 Dec 2019, 10:06 | Adriano Violante | General | Information | Report after tech. Int. meeting 09.30 | MID: 
 
 SDL tests ongoing. Important
 motors have been tested. Alignment of the
 |  | 
| 92 | 16 Dec 2019, 09:28 | Adriano Violante | General | Information | Report after dispatch meeting 09.00 | FXE: 
 
 uTCA update has been completed
 by EEE on Friday evening. Information
 |  | 
| 91 | 11 Dec 2019, 09:54 | Adriano Violante | General | Information | Report after Tech. Int. meeting 09.30 | FXE: 
 
 New optical table will
 be installed today. Access to the hutch could
 |  | 
| 90 | 09 Dec 2019, 09:22 | Adriano Violante | General | Information | Report after dispatch meeting 09.00 | FXE: 
 
 No major issues.
 Karabo
 will be updated to the version 2.7.0. on
 |  | 
| 89 | 04 Dec 2019, 14:18 | Adriano Violante | General | Information | Summary of the technical integration meeting | FXE 
 
 No major issues - PLCs
 update has been started by EEE (BB)
 
 
 SCS
 |  | 
| 88 | 28 Nov 2019, 15:42 | Andreas Galler | General | Problem | affected ITDM Systems after power cut tonight | 
 
 XHQ.E1.092
 
 SW-HH-AL-271
 was available
 |  | 
| 87 | 27 Nov 2019, 09:25 | Andreas Galler | General | Information | dispatch meeting Mon Nov 25 2019 | FXE: no issues 
 SPB: no issues
 
 MID: Split & Delay line arriving
 |  | 
| 86 | 20 Nov 2019, 10:12 | Adriano Violante | General | Information | Minutes of the Technical integration meeting 20.11.19 | FXE 
 
 Wille was asked by D3
 to pull new cables for the Pandora in FXE
 |  | 
| 85 | 13 Nov 2019, 10:12 | Adriano Violante | General | Information | Status report after tech. Int. Meeting 9.30 | FXE 
 
 Radiation tests ongoing.
 EEE
 informs that the PLC drawings will be exchanged
 |  | 
| 84 | 12 Nov 2019, 09:49 | Adriano Violante | General | Information | Status report after dispatch meeting 09.00 | FXE 
 
 
 FXE
 – radiation tests and LPD tests planned
 |  | 
| 83 | 28 Aug 2019, 10:33 | Adriano Violante | General | Information | Minutes of the Technical integration meeting 28.08.2019 | XO 
 FXE
 
 
 Leak in the LPD cooling
 |  | 
| 82 | 26 Aug 2019, 09:52 | Adriano Violante | General | Information | Report after dispatch meeting 09.30 | XO 
 
 Today a test of the fire
 alarm system will take place. Mail has been
 |  | 
| 81 | 21 Aug 2019, 11:15 | Adriano Violante | General | Information | Minutes of the Technical integration meeting 21.08.19 | XO 
 
 A review of the procedures
 in case of power failure is in progress.
 |  | 
| 80 | 19 Aug 2019, 11:11 | Adriano Violante | General | Information | Report after dispatch meeting 09.30 | General 
 
 Still recovering from the
 power loss occured on Saturday (The primary
 |  | 
| 79 | 14 Aug 2019, 10:01 | Gerd Wellenreuther | General | Information | Minutes of the Technical integration meeting 14.08.2019 | XO 
 
 On Monday at around 12:20
 there was a power glitch at least in Hamburg,
 |  | 
| 78 | 12 Aug 2019, 09:50 | Gerd Wellenreuther | General | Information | Status report after dispatch meeting 12.8. | XO 
 FXE
 
 
 XTD1 CRLs: There is an
 |  | 
| 77 | 07 Aug 2019, 11:55 | Adriano Violante | General | Information | Minutes of the Technical integration meeting 07.08.2019 | XO 
 The accelerator is now working
 at 2.25 MHz. Kicker can be used. DET informs
 |   | 
| 76 | 05 Aug 2019, 10:19 | Adriano Violante | General | Information | Status report after dispatch meeting 09.30 | XO 
 FXE
 
 
 Photon3 detector has been
 |  | 
| 75 | 02 Aug 2019, 09:10 | Adriano Violante | General | Information | Info on dispatch meeting 09.00 | The meeting did not take place since only EEE was attending.
 |  |