  Draft   12 Oct 2020, 09:12 Andreas GallerGeneralInformationNotes XO Integration Meeting 12.10.2020

General Announcement:

  • .

CTRL:

  • issues SA3 vacuum loop
    • gets more and more diffcult to recover
      • problem not clear, PLC comminucation is lost without obvious reasons
      • no software changes took place from either CTRL nor EEE ... component issue?
  • fastadc issues --> EEE
  • mirror in SA3 not always following a move ommand XTD10 M1

DA:

  •  

EEE:

  • OCD at HED --> hexapod
  • fineDelay

VAC:

  • preventive action in XTD10 for GATT scroll pump

XPD:

  • SA2 imager XTD6 pop in 45 after M3 small mark on the imager --> imager still usable

DET:

  • nothing to report

ITDM:

  • OCD call data aggregator at MID
    • need to understand better how to avoid the situation
  • users complained to maxwell service (DESY directly) about limited resources becuase of high load by other users
    • there are reserved nodes --> use them!
  • issues with scratch
    • more than 300 TB had been accumulated within a relatively short time
      • it seems that data was calibrated to scratch not to proc
      • MID comments --> a special calib mode was used that could not save to proc which is why it was saved to scratch
  • problem with one of the proxy servers --> degraded performance of data migration

XRO:

  •  

LAS:

  • issue at SA1 with Galvo
    • after shift change to FXE, laser was not working --> Galvo was out of phase
    • FXE resetted something (not clear) and the laser came back
    • LAS investigating the issue

UNSYS: 

  • nothing special
    • a couple of times the undulators opened suddenly without any command issued.
    • O. Henssler from DESY proveds the logs

SPB/SFX:

  • coupling with SA1 and SA2 (SA2 using train on demand) is an issue
    • beam walks off the XTD9 XGM aperture
  • offset mirrors M2
    • pitch movement got stiff
  • smaract cotnrollers
    • most fixed by increasing timeout windows

FXE:

  • shutter can be opened despite closed vavales

MID:

  • used pulse on demand
    • users were happy

HED:

  • damage on M3 mirror
    • due to focusing scheme --> 9keV and intermediate focus --> during alignment unfortunately the focusing point came too close to M3
  • meeting with XPD and XRO at 11:30
  • hexapod issue reported to EEE is not quite fixed
    • ´status is not reporting the correct status of the hexapod
    • hexapod started working at some point and fell back to weird operation later again
  • CRL arm7 seems to be at the limit of the x-axis
    • if FEL stays where it is, XTD1 chamber might need to be moved
  • JUNGFRAU issue
    • up to a point the data is fine in the preview
      • after some runs data seen in the preview is not written to file

SCS:

  • nothing to report

SQS:

  • l
  169   14 Oct 2020, 09:22 Andreas GallerGeneralInformationNotes XO Integration Meeting 14.10.2020

General Announcement:

  • .

CTRL:

  • problems in SA3
    • VAC loop unstable, devices cannot be brought into a stable state --> what used to be a restart every  two weeks, cannot be recovered these days
    • issues with motors developing a short time out
      • somewhere there is a beavy load on Beckhoff loops
      • TM comments: at times the movements happen very late after issuing the command
    • influxDB sees high load
      • any modification of or running a new macro?
      • Please let CTRL know
    • the issue started with VAC --> devugging shoud start there

DA:

  • extrafoam OCD call

EEE:

  • working together with CTRL on SA3 issue
  • OCD call from SCS but call was not correctly frowarded

VAC:

  • not present

XPD:

  • no issues

DET:

  • OCD call from SCS --> was fixed

ITDM:

  • nothing to report

XRO:

  • nothing to report

LAS:

  • no issues

UNSYS: 

  • nthing to report

SPB/SFX:

  • all fine

FXE:

  • people on shift could not initiate a hutch search
  • GABS access right missing (Gebietsabsuche)
    • introduced without informing FXE

MID:

  • waiting for invitation AGIPD trainID solution

HED:

  • JUNGFRAU issue presists
  • HexaPOD is working again
    • work around

SCS:

  •  

SQS:

  • DAQ issue
    • no data was recorded without
  • vac is an issue but not endangering
  • motor issue is vital to the instrument

  213   07 Apr 2021, 08:52 Andreas GallerGeneralInformationNotes XO Integration Meeting 07.04.2021

General Announcement:

  • .

CTRL:

  • recurrent error reprted by LAS  --> drift compensation in SA2 --> need feedback
  • minor issues reported instruments during startup

DA:

  •  

EEE:

  • Issue on April 4th --> 4 PLCs shut down without a cause, (looks like power cut)
  • MID crate went down at 9:00
  • SA3 utca shut down (could be voltage drop, could be ehternet) (9:35)

VAC:

  • VAC-OCD recovered SA2 vacuum state (valves, and ystem) (see EEE SA2 incident above)
  • VAC obseved that the MID Mono warmed up, the cryo warmed up presumably after a PLCs update which interrupted an interloop communication

XPD:

  • nothing report

DET:

  • everything running fine

ITDM:

  • SA1 baclony room checked
    • some racks lost power --> investifation going on (possibly happened on Sat. Apr 3rd 8:00 am)

XRO:

  • incorrect motor velocity in SA3 --> fixed
  •  

LAS:

  • small issue in SA2 with slow feedback --> see CTRL report

UNSYS: 

  • problem on SA1 central control node, after a power cycle aircoils and phase shifters were unresponsive

SPB/SFX:

  • Laser Interlock issue was solved, power spike involved that reported by MEA3 ( klaus Witt).

FXE:

  • no issues

MID:

  • M1 mirror was moved completely out on 1st of Apr.
    • --> Naresh Kujala moved M1 out.

HED:

  • Laser interlock issue on Tuesday
  • with regards to the MID Mono cryo, there had been HED PLC updates
  • calibration pipeline issue on AGIPD
  • HED utca in optics hutch went off

SCS:

  • no issues

SQS:

  •  
  239   07 Jul 2021, 09:07 Andreas GallerGeneralInformationNotes XO Integration Meeting 05.07.2021

General Announcement:

- User Operations Meeting will resume on Friday

CTRL:

- Last week found small bug for the fastADC – short down time requested

DA:

- Nothing to report.

EEE:

- Fast electronics – are planning a ZZ

- Fuses issue – MID & HED medium priority crates fixed

- SASE 3 vacuum loop has to be updated – today afternoon or tomorrow around lunch timewill be coordinated by XO with EEE and MXL

VAC:

- Nothing to report

XPD:

- Start up of equipment

DET:

- Nothing to report.

ITDM:

- Nothing to report.

XRO:

- Nothing to report.

LAS:

- Alignment Laser interlock issue at SA3, being investigated

UNSYS:

- Nothing to report.

SPB:

- some motor issues after crate restarts in connection with but not caused by the works adressing the fuse issue

FXE:

- Nothing to report.

MID:

- all fine

HED:

- nothing.

SCS:

- Nothing to report.

SQS:

- Nothing to report.

  240   07 Jul 2021, 09:14 Andreas GallerGeneralInformationNotes XO Integration Meeting 07.07.2021

General Announcement:

  •  

CTRL:

  • nothing to report

DA:

  • Nothing to report

EEE:

  • XTD 10 ZZ uTCA excahange

VAC:

  • nothing

ME:

  • nothing

XPD:

  • within next three days XPD equipment to be checked with x-rays
  • DAQ test next Monday
  •  

DET:

  • LPD
    • communication with RAL and STFC, no sign of corrosion --> single module to be taken out and test in the lab

ITDM:

  • nothing

XRO:

  • nothing
  •  

LAS:

  • redmine tickets

UNSYS: 

  • nothing to report

SPB/SFX:

  • ITDM DAQ test today

FXE:

  • nothing --> hutch being prepared
  • PLC loops 4 and 7 are down due to hardware issues on the PLC --> EEE on it.
    • sample stack --> loop4 preparation delayed

MID:

  • pre is going on, everything

HED:

  • nothing

SCS:

  • nothing

SQS:

  • nothing to report

AOB:

  • Zunaira --> beam shutter keys

  241   12 Jul 2021, 09:29 Andreas GallerGeneralInformationNotes XO Integration Meeting 12.07.2021

General Announcement:

  •  

CTRL:

  • InFlux, still experiencing delay with querying the database (20min, karaba; 5min Grafana)
    • Jan reports that in the XGM trendlines a similar effect is seen

DA:

  • nothing to report

EEE:

  • Friday call from BKR, because of MPS blocking
    • FXE SHUT MPS signal was not reset
    • ZA comments, that the reason is not yet clear --> ZA is contact with Rathjen and MPS experts

VAC:

  •  

ME:

  •  

XPD:

  • For the FXE SHUT it seems MPS and karabo data are differeing
  •  

DET:

  • LPD
    • Hazem is back on Friday --> Supermodules will be tested then in the Lab
  • AGIPD
    • special dark procedur currently not working well

ITDM:

  • nothing to report

XRO:

  • This week, component check in all SASE tunnels
  •  

LAS:

  • nothing to report

UNSYS: 

  • Friday
    • SA1 cell 10, Suren exchanged the coupler

SPB/SFX:

  • nothing to report

FXE:

  • nothing to report
    • PLC issues loop4 and loop7 solved

MID:

  • nothing to report

HED:

  • nothing to report

SCS:

  • nothing to report

SQS:

  • nothing to report

AOB:

  • Zunaira --> beam shutter keys

  242   14 Jul 2021, 09:28 Andreas GallerGeneralInformationNotes XO Integration Meeting 14.07.2021

General Announcement:

  •  

CTRL:

  • InlFlux logging, some statisitics had been gathered --> but no root cause had been found.
    • Load Balancer would needed to be restarted --> data inside buffer would be

DA:

  • all good

EEE:

  • PLC team is still busy with check up of the "fuse" issue
  • MID cabling going

VAC:

  •  

ME:

  •  

XPD:

  • one XGM didn't ecevice a signal
    • quickly resolved
  • downstream XGM's are running as well

DET:

  • AGIPD
    • dark procedure fixed and seems to be working now at SPB/SFX, has to be installed at HED and MID
  • LPD
    • 3 supermodules had been moved to the DET LAB --> so far visual inspection does not show major issues
    • no module powered yet
       

ITDM:

  • nothing to report

XRO:

  • SA1 was aligned
    • SPB/SFX done

LAS:

  • humidty in PPLAS
    • TS working on it
      • PKG after maintenance did not come back to specs

UNSYS: 

  • nothing to report

SPB/SFX:

  • nothing to report

FXE:

  • nothing to report --> shutter porblem solved

MID:

  • nothing to report

HED:

  • nothing to report

SCS:

  • triggers

SQS:

  • nothing to report

AOB:

  •  

  265   04 Oct 2021, 09:30 Andreas GallerGeneralInformationNotes XO Integration Meeting 04.10.2021

General Announcements
none

 

CTRL
- late train IDs at XGM, being sorted

 

DA
- nothing to report

 

EEE

DET

ITDM
- nothing to report

XRO
-

LAS
- Failure of Power SUpply on AMPHOS in SA3, had been replaced over the weekend,
- observed jump on ODL in SA2 around midnight --> being investigated

UNSYS
- nothing to report
- PKG status to be discussed

 

SPB/SFX
- nothing major to report

 

FXE

 

MID
- Feedback for M2 stopped working, started calculating wrong values

HED
- nothing to report

SCS
- problems with DAQ: DA1 stuck --> DOC and ITDM are aware

SQS
- nothing to report

 

AOB

 

 

 

  266   06 Oct 2021, 09:28 Andreas GallerGeneralInformationNotes XO Integration Meeting 06.10.2021

General Announcement:

  •  

CTRL:

  • nothing to report

DA:

  • nothing to report

EEE:

  • nothing to report

VAC:

  • nothing to report

XPD:

  • nothing to report

DET:

  • nothing to report (SPB reports JF1M issue --> suspected readout board issue)

ITDM:

  • issues with Nagios
    • misconfig by puppet mangement (DESY)

XRO:

  • nothing to report

LAS:

  • nothing to report
    • SA3 PPL up and running

UNSYS: 

  • Phaseshifter tables for higher energies in blue week had been uploaded
  • two quad movers from SA2 moved to 0
    • triggered by doocs --> quad movers moved back but it is unclear if they actually returned the BBA optimized position
    • clarification with M. Scholz confirms that quad movers did not move.

SPB/SFX:

  • JF
  • nothing to report

FXE:

  • User Experiment starts
  • C&C update requested until next week for LPD (uTCA)

MID:

  • all fine at MID

HED:

  • nothing to report

SCS:

  • not present

SQS:

  • nothing to report

AOB:

  •  

  267   11 Oct 2021, 09:27 Andreas GallerGeneralInformationNotes XO Integration Meeting 11.10.2021

General Announcement:

  •  

CTRL:

  • nothing report

DA:

  • nothing to report

EEE:

  • several motors in SPB/SFX had trouble, all originating from the same crate

VAC:

  • VAC problems at HED last Wed
    • monochromator section in the tunnel, two unidentified vacuum bursts

XPD:

  • nothing to be reported

DET:

  • nothing to report

ITDM:

  • nothing to report

XRO:

  • FXE (PZ) reported a large jump in the bender setting, sebsequently Ry and pitch drifted for days and stabilized later
    • M1 M2 alignment changed as well
    • currently stable and being investigated

LAS:

  • nothing to report

UNSYS: 

  • nothing to report

SPB/SFX:

  • unstable pulse energy jittering ~ 35% over days.

FXE:

  • Experiment went well, apart from minor issue with calibration pipeline with JF

MID:

  • all fine

HED:

  • nothing to report

SCS:

  • not present

SQS:

  • not present

AOB:

  •  

  268   13 Oct 2021, 09:26 Andreas GallerGeneralInformationNotes XO Integration Meeting 13.10.2021

General Announcement:

  • This meeting is a tool to share information/experiences across scientific and technical groups

CTRL:

  • system are working

DA:

  •  

EEE:

  • next week
    • update on GATT and EPS loop in SA3 in roder to allow for new protection of GATT for the whole beaemtime
    • SA2 on Thursday (maybe Friday), try to correct backlash issue --> loop update

VAC:

  • all is running
  • HED VAC event
    • miscommunication between operators led to this issue

XPD:

  • no issue to report
  • next week, during the whole week there'll be a high photon energy test at SA1 and SA2 see a big involvement of XPD
    • 24 keV @SA1 (Tue)
    • ~30 keVC @ SA2 (Wed/Thu)
    • PI/Planner is Frank Brinker

DET:

  • investigating JF1M issue of 4-6Hz instead of 10 Hz operation

ITDM:

  • nothing

XRO:

  • SA1 M1/M2 drifts under investigation
  • XRO is involved as well with next weeks high photon energy effort as well as EEE loop updates

LAS:

  • sub sync

UNSYS: 

  • nothing

SPB/SFX:

  • user exp this week, 24 keV next week

FXE:

  •  

MID:

  • all fine at MID

HED:

  • next week high photon energy

SCS:

  • nothing to report

SQS:

  • next week material tests, maybe also detector group.

AOB:

  •  

  288   20 Dec 2021, 09:25 Andreas GallerGeneralInformationNotes XO integration meeting 20.12.2021

General Announcement:

  •  

CTRL:

  • no update

DA:

  • nothing

EEE:

  • nothing

VAC:

  • nothing to report

XPD:

  • nothing special, shtudown tasks are in schedule, HXPES / XTED2 cable work ongoing

DET:

  • nothing special

ITDM:

  •  

XRO:

  •  

LAS:

  • lasers ramped down

UNSYS: 

  • APPLEXv inv place, VAC to be closed next year

SPB/SFX:

  • working on mirrors
    • checking vacuum today
  • not clear what is the status with the movement of racks wrt SXP (SPB/SFX optics hutch racks currently powered down)
    • electrical installation?
    • PG comments: Brad won't allow operation until 230 V power distribution is calrified, once Brad gives the OK, the racks can be switched on
      racks are being finalized by EEE, but some checks need electrical power
    • RB: SPB/SFX were promised that the move of the racks were finished before X-Mas, but it seems the electrical work is not up to satandards

FXE:

  • shutdown task in schedule

MID:

  • all fine
    • some loop updates planned for Today

HED:

  •  

SCS:

  •  

SQS:

  • nothing

AOB:

  • light OCD over X-Mas for XPD in case of floowings, power outages.lists will be

  289   05 Jan 2022, 09:29 Andreas GallerGeneralInformationNotes XO Integration Meeting 05.01.2022

General Announcement:

  •  

CTRL:

  • no major updates

DA:

  • no major updates

EEE:

  • 1 MID plC dead
    • replaced on Monday
  • cable work planned for next week
    • HED, SXP

VAC:

  • In general excellent progress
  • closing of M2 XTD2 (SA1) in progress, sealing issues mitigated

XPD:

  • XTD10, XTD6
    • improvements, commissioning ongoing
  • clean room tent water leak reported on 23.12.
    • fixed by TS befroe X-Mas

DET:

  • no major issues

ITDM:

  • Jan 19: dCachce maintenance

XRO:

  • progress as planned
  • changes to existing components will be posted to respective elogs

LAS:

  •  

UNSYS: 

  • progress as planned

SPB/SFX:

  • Vac monitoring recoverd

FXE:

  •  

MID:

  • PLC outage on Jan 1 st caused VAC issues (reported by EEE)
    • fixed
  • no access to MID optics hutch due to interlock test

HED:

  • everything on schedule
  • leak on a hose to humidifier device in A12. This leaked a few litres on the floor.
    • to be fixed by Caverion

SCS:

  • progress as planned

SQS:

  • progress as planned
  297   02 Feb 2022, 08:39 Andreas GallerGeneralInformationNotes XO Integration Meeting 02.02.2022

General Announcement:

  •  

CTRL:

  • observation from DOC
    • macros some times after the upgrade to Python 3.8 --> please contact CTRL?

DA:

  • significant upgrade to Offline Analysis -->
    • proc data won't inlcude a copy of raw data any longer

EEE:

  • fast electronics

VAC:

  • no issues

XPD:

  • no incidents
    • 2 tunnel accesses on Monday --> succesful

DET:

  • DET commissioning at SPB (AGIPD JUNGFRAU 1M), MID (AGIPD), HED (ePIX, JUNGFRAU)

ITDM:

  • E0.604 rack room, Wed next week
    • fixing power distribution units in every rack --> TS and external company will need a full day
    • affected services are: Lab DAQ, LAB control servers (EEE; CTRL, DET), GitLab runners, one machine for data analysis, PLC database, karabo project database (?)
  • Yesterday short interruption with influx reading note --> test requested for next Monday causing a 1 hour interruption

XRO:

  • SA1 / SA2 M3 PBLMs have been equipped with diamond plates and can be used for beam stability measurements
  • Backlash Controls implemented last week --> values
  • report of lost positions of vertical slit in SA3
    • in case of similar issues please contact DOC prior to self fixing.

LAS:

  • SA2 PPL is good
  • SA3 PPL planned to be up today
  • SA1 PPL being investigated as agreed with SA1 instruments

UNSYS: 

  • transparency test  for APPLE X went successful

SPB/SFX:

  • SPB/SFX aligned since yesterday, no issues

FXE:

  • blown fuses in crates --> solved with EEE

MID:

  • all fine

HED:

  • Com yesterday
    • outstanding issue: fastADC not working EEE aware of that

SCS:

  •  

SQS:

  • GATT always worked but very slowly responding
    • OCD contacted
    • Raul comments that this is a known issue and should be communicated to CTRL
    • SH nesures that Raul creates the ticket
  • XTD10_PES
    • digitizer display frozen almost all time (connected to 2 DAQs) --> reported to DOC
    • SH comments that when connecting to two DAQs (tunnel and SQS), should be connected to only one DAQ.

  314   04 Apr 2022, 09:26 Andreas GallerGeneralInformationNotes XO integration meeting 04.04.2022

General Announcement:

  •  

CTRL:

  • PP LAS restarting device servers for upgrading the device tag --> autoinstantiate some servers all topics

DA:

  • Planned maintenance today for Cal and gpfs delayed at least until next Monday

EEE:

  • nothing major to report

VAC:

  • 1 ZZ ongoing to XTD4 to shiled an ion pump controller, suspicion of radiation damage.
    • AK Dump XTD10? --> yes

XPD:

  • similar Diamond cracks as in solid attenuator had been observed in the transmissive imagers
  • Last weeek FEL imager issue had been clarified (image was rotated by 180 °, occured due to faultly config load)

DET:

  • AGIPD1M (SPB/SFX), Friday morning some DAQ issues induced train losses. Didn't happen again after careful checking

ITDM:

  • Issue at HED with data migration --> discussion will take place

XRO:

  • Tomorrow and after tomorrow late shift some CTRL support might be required

LAS:

  • PLL LAS SA1 sync issues (LbSYNC informed and arriving 10:00)
  • PPL LAS3 NOPA setup

UNSYS: 

  • ZZ ongoing

SPB/SFX:

  • Experiment went well, no major issue
  • Run Controller crashd a few times over the weekend. Could be restarted but crashes some time later and has to be restarted

FXE:

  • affecetd by LAS Sync issue
  • issue with doocs panel for shutters (yifeng)

MID:

  • all fine
  • SSRY motor issue (ELMO)
    • Nerea updated the ticket --> motor is working

HED:

  • DA1 got stuck for a while (fixed by restarting)
  • lot of short runs (1min) and only one train isneed from that -> requires fast data migration and analysis -> doesn't always work
    • discussion with ITDM commencing
  • PAM was missing from DAQ

SCS:

  • no major issues
  • RIXS on liquids went well

SQS:

  • mono shift becuase

DOC /DRC

issues with call forwarding

  315   06 Apr 2022, 09:15 Andreas GallerGeneralInformationNotes XO integration meeting 06.04.2022

General Announcement:

  •  

CTRL:

  • influxDB outage (telegraf issue)
    • SA1 and SA3 affected
    • currently fixed but linked to a device in SQS

DA:

  • nothing major

EEE:

  • PLC colleagues are working on CR and support requests
  • pulling cables for SQS and SCS
  • reported to XO uTCA in XTD1
    • remote reboot planned for Friday, reserve ZZ slot for Friday

VAC:

  • repair of XTD2 solid attenuator ongoing

XPD:

  • FD @ SA2

DET:

  • nothing to report

ITDM:

  • nothing to report
  • next Monday GPFS update will take place

XRO:

  • mirror calibration started in SA2
    • beam path through offset mirros not visible -> no beam on M3 pop in, but visible on M2 pop in MCP in beam?
    • JG: no MCP in beam, how about PBLM?
    • LS: no PBLM in beam
    •  

LAS:

  • Sync issue from Monday cannot be replicated by Sebastian -->
  • tests for SPB happening tomorrow

UNSYS: 

  • circular polratizaton lasing achievd in APPLE-X in left and right hand polarization, also linear horizontal and vertical and 45° measured at 900 and 700 eV
    • thanks to UNSYS and DESY APPLE-X comm team.

SPB/SFX:

  • no major

FXE:

  • nothing to add

MID:

  • all fine

HED:

  • nothing to report

SCS:

  • reservation of nodes for jupyter hub.
    • requested during drc hour fix to reserve 3 nodes
      • didn't work out
    • is it possible to reserve 3 nodes by default?
  • Olivier reports there was a misunderstanding and it got fixed very quickly
  • Janusz reports that by standard 4 nodes are reserved for each experiment.

SQS:

  • nothing to report

 

  316   11 Apr 2022, 09:10 Andreas GallerGeneralInformationNotes XO integration meeting 11.04.2022

General Announcement:

  •  

CTRL:

  • small intervention --> udpate of karabo-gui client exflagteway

DA:

  • maxwell gpfs software maintenance --> offline calibration pipeline affected see ITDM

EEE:

  • OCD call on rack 2.01 which was powered down. After fuse repaired

VAC:

  • see above ...

XPD:

  • Rack 2.01 --> Camera of SR imagare is not working
    • situation not clear, being investigated --> IP conflict?
    • Janusz suggests to powercycle the camera

DET:

  • many to report

ITDM:

  • 10:00 maxfell gpfs update

XRO:

  • SA2 mirror calibration

LAS:

  • remainder change of set point for SCS to 112 kHz

UNSYS: 

  • nothing to report

SPB/SFX:

  • nothing to report

FXE:

  • preparing for user experiments
    • concerned about optical sync of PP Laser, probelm of last week was fixed but no reason found
    • test last thursday optical sync lost again while moving optical delay stage
    • FXE

MID:

  • alignment of optical laser alignment in joined hutch.
    • please

HED:

  • nothing to report

SCS:

  • nothing to report
    •  

SQS:

  • last week Thursday night
    • mono drift investigated --> preliminary analyisis points to the grating as the drifting component

  317   13 Apr 2022, 09:28 Andreas GallerGeneralInformationNotes XO Integration Meeting 13.04.2022

General Announcement:

  • No User operation meeting this Friday, instead cw 16 / cw 17 check will happen in Daily Operations Meeting at 15:30 on Thu Apr 14. Link available on ttfinfo in XFELelog

CTRL:

  • nothing major to report

DA:

  • nothing major to report

EEE:

  • nothing major to report

VAC:

  • nothing to report

XPD:

  • nothing to report

DET:

  • offline calib with JUNGFRAU --> tickets closed already

ITDM:

  •  

XRO:

  • request to SA1 instruments
    • please check the repaired XTD2 solid attenuators
    • attenuators cannot sustain too much power, offline discussion follows
  • SA2 mirror recalib
    • roll of M1 and M2 was completely misaligned, recalibration successful
    • geometrical center of the kinematic system roughly identified
      • required for Euler MDL,

LAS:

  • nothing to report

UNSYS: 

  • nothing to report

SPB/SFX:

  • nothing to report

FXE:

  • not present

MID:

  • pump probe looks stable and getting ready for the user
    • BAM doocsbridge stopped --> manual restart necessary

HED:

  • nothing to report

SCS:

  • nothing to report
    •  

SQS:

  • nothing to report

DRC

  • one hour data lost in influxDB in SA2

PRC

  •  

 

  320   27 Apr 2022, 09:04 Andreas GallerGeneralInformationNotes XO Integration Meeting 27.04.2022

General Announcement:

  •  

CTRL:

  • bug noticed in BEckhoof karabo device --> already fixed from some topics, see xo-info comm from yesterday

DA:

  • all fine

EEE:

  • CRL-HED-OPT isue solved

VAC:

  • two devices went into error --> likely because of Beckhoff Karabo bug

XPD:

  • nothing to report

DET:

  • AGIPD 1M at SPB partially vented yesterday --> detector went into interlock, no damage
    • who should be called at SPB (or any instrument for that matter)
    • Turbo pumps went into error state which triggered the partial vent --> karabo Beckhoff update?
    • Wajid comments: karabo beckhoff update does not correlate with this incident, judging from time stamps

ITDM:

  • no update

XRO:

  • nothing to report

LAS:

  • nothing to report

UNSYS: 

  • not present

SPB/SFX:

  •  

FXE:

  • software limits of phase shifter of PP Laser
    • DK solved by PP Laser

MID:

  • all fine at MID
    • HXRSS very much appreciated

HED:

  • HIREX offset

SCS:

  •  

SQS:

  •  

DRC

  •  

PRC

  • SCS incident on Monday, photon energy scanning script was left running --> had to be stopped manually

  338   04 Jul 2022, 09:30 Andreas GallerGeneralInformationNotes XO Integration Meeting 04.07.2022

General Announcement:

  • M. Döring:
    • almost all of the activities that should have been done until last Friday had been done

CTRL:

  • last week karabo topic updates had finishedexcept for LAS
  •  

DA:

  • nothing

EEE:

  • SA3 exit slit

VAC:

  • leak search on M6 (SA3) chamber
  • leak search in XTD9
  • all in all well

XPD:

  • almost all tasks have been completed
  • XTD1 new crate connected on Friday,

DET:

  • nothing

ITDM:

  • all updates are finsihed
  • some activities continuing on the offsite --> should be comüpletely transparent
  • after the prox change there are some PCs which are using the old host names --> relavant people will be contacted by Janusz Szuba

XRO:

  • M6 mirror installation beign finished
    • end switch checks shoudl be finished by today
    • ramp up procedure being written down
      • instruments are asked to submit any additional requests for ramp up

LAS:

  • fastADCs should be finished by Wed this wek

UNSYS: 

  • control system has to be adjusted after removal of APPLE X, i.e. the control system looks for motors and

SPB/SFX:

  • checks

FXE:

  • motor commissioning ongoing

MID:

  • nothing
    •  

HED:

  • when modifying cables downstairs, make sure modules upstairs are switched off

SCS:

  • PLC updates

SQS:

  • not present

DRC

  •  

PRC

  • SCS incident on Monday, photon energy scanning script was left running --> had to be stopped manually