Group Selection Page HELP Controls Group ITDM WP76 DET Vacuum EEE WP78 FXE SPB HED SQS SXP Sample Environment Operation PSPO XO TS Migrated2Zulip MigratedByGroup
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther, Page 18 of 33  Not logged in ELOG logo
ID Date Author Location Severity Subjectdown Text Attachments
  260   15 Sep 2021, 10:37 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.09.2021General Announcement:
- Machine stop running yesterday around 21:00
due to problems with the cold compression.
  
  349   15 Aug 2022, 09:49 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.08.2022General Announcement:
-  On Saturday 4AM there was a very short
power glitch. Machine kept running and to
  
  530   15 Jul 2024, 09:39 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.07.2024General Announcement:
- The User Operation Meetings will restart
next Friday 19.07.
  
  143   17 Jul 2020, 10:19 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.07.2020General Announcement:
- SASE3 tuning will start this afternoon
and possibly will last until Thursday afternoon.
  
  333   15 Jun 2022, 10:40 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.06.2022General Announcement:
- Currently beam delivery is suffering with
gun trips at every 1 hour or so. The RCs
  
  278   15 Nov 2021, 09:57 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.06.2021General Announcement:
-  
  
  132   16 Jun 2020, 13:32 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.06.2020General Announcement:
- There will be additional ventilation maintenance
on all tunnels, scheduled for next WED/17th
  
  514   15 May 2024, 09:44 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.05.2024General Announcement:
-  
  
  418   15 May 2023, 09:51 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.05.2023General Announcement:
- There are different infrastructures among
the instruments regarding liquid nitrogen.
  
  121   15 May 2020, 14:35 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.05.2020General Announcement:
- Judging by feedback and communication to
XO both Tunnel and control network works
  
  605   16 Apr 2025, 09:33 Andreas GallerGeneralInformationNotes XO Integration Meeting 15.04.2025General Announcement:


 


CTRL:


nothing 


DA:
  
  506   15 Apr 2024, 09:31 Andreas GallerGeneralInformationNotes XO Integration Meeting 15.04.2024General Announcement:


 


CTRL:


SA1 DAQ upgrade


DA:
  
  403   15 Mar 2023, 10:49 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.03.2023General Announcement:
- Tobias Clever informs on electrical works
needed to connect XHO to electrical grid:
  
  207   15 Mar 2021, 11:26 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.03.2021General Announcement:
- Following Desy e-mail to all EUXFEL staff,
the emergency call system of the elevators
  
  395   15 Feb 2023, 10:14 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.02.2023General Announcement:
-  
  
  199   17 Feb 2021, 08:52 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.02.2021General Announcement:
- It had been a cooling water issue with
SA1 and SA3 PPLs on Saturday. Other groups
  
  579   15 Jan 2025, 09:40 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.01.2025General Announcement:
- A. Galler announces that yesterday the
cooling water of 20C was leaking. The reason
  
  482   15 Jan 2024, 10:52 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.01.2024General Announcement:
- Interlock tests light: functional tests
will happen this Wednesday starting at 09:00
  
  382   14 Dec 2022, 09:55 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 14.12.2022General Announcement:
- There will not be Xo Int. meeting next
Wednesday 21.12. The last meeting for this
  
  186   14 Dec 2020, 09:00 Arvid GebhardtGeneralInformationNotes XO Integration Meeting 14.12.2020General Announcement:

- Please write to xo.planning,
if something comes up with intteruption of
  
ELOG V3.1.4-7c3fd00