Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 648     Entry time: 15 Sep 2025, 09:45
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 15.09.2025 
General Announcement:
- On the LIMP25, no news apart of what was mentioned last week by Martin Doering (see 10.09 minutes)
- Inaki de Diego informs that AIBS and airboxes installation is completed, with the exception of HED, where there is a problem with a cable (or connector) that needs to be 
fixed by MPS during the next days. 
It will be confirmed when fixed/done.

CTRL:
- Today proceed with test deployment at MID.

DA:
- Nothing to report.

EEE:
- PLC team starting to replace the PLC CPUs with SA1 after agreement with instruments.

VAC:
- Not present.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Not present.

UNSYS:
- All proceeding and the hardware is prepared; only waiting for construction/MEA work.

SPB:
- Nothing to report.

FXE:
- Thanks to Hall crew who helped with craning.

MID:
- All fine; Temperature in the control hutch to be addressed today.

HED:
- Not present.

SCS:
- Not present.

SQS:
- Nothing to report.

SXP:
- Nothing to report.