  365   12 Oct 2022, 09:16 Andreas GallerGeneralInformationNotes XO integration meeting 12.10.2022

General Announcement:

  •  

CTRL:

  • nothing major

DA:

  • nothing special

EEE:

  • nothing special

VAC:

  • XTD6 HED monochromator
    • pumping down continues

XPD:

  • nothing to report

DET:

  • nothing to report

ITDM:

  • SA2 online system (gpfs) one enclosure is bahving strangely, intervention may be required --> to be investigated

XRO:

  • XTD6/XTD9 tunnel works

LAS:

  • no issues

UNSYS: 

  • cell 19, 20, 21 motors for phase shifters had been replaced. Delivery for lead shields is going to be next year --> installation will have to be done through ZZ access
    • radiation damage is high after chicane, delivery time for new motors is 1 years, 7 are left in stock

SPB/SFX:

  • nothing special

FXE:

  • nothing to report

MID:

  • all fine at MID

HED:

  • nothing to report

SCS:

  • hRIXS combined motuion requires PLC to be exchanged

SQS:

  •  

DRC

  •  

PRC

  •  

  364   10 Oct 2022, 10:09 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.10.2022
General Announcement:
- Wajid E. reminds DOC is not working this week but the DRC will take the calls over the week and redirect to respective OCD inside DATA department.
- Olivier M. mentions to use drc-xfel@xfel.eu for contacting the DRCs. However, the fastest way to communicate for urgent matters is using the regular DOC/DRC phone number.
- Martin D. updates the status of winter maintenance period: 
1. MTLs are in general with lower quality as compared to previous maintenance time (e.g. starting and ending dates); 
2. Groups will be contacted back by XO and meetings with groups will be scheduled in the coming days. 
- A. Galler shows the TTFinfo/schedule to inform on the schedule for this Blue/FD week starting today.

CTRL:
- X-ray feedback device reported by MID: device did not provide feedback for beam position. A bug fix was applied and it worked. 
CTRL proposes to apply to all other location today. No objections from the instruments appear during this meeting - so it will take place today.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- XTD6 was opened today for work on the high resolution Mono. It will stay open at least today and tomorrow.
- On Saturday VAC OCD approved to borrow a He bottle to MID. MID will return back to VAC today for He leak tests in tunnels.

XPD:
- Nothing to report.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- Mikako M. enquires on the Blue week schedule: A. Galler says that requesters that got beamtime granted must be informed already.

LAS:
- SA1 PP-laser will test the trigger delay;
- LAS is performing SA3 PPL tuning for handling laser to SQS instruments.
- A. Galler says that optical sync was lost during the weekend in all instruments. The RF sync was on 30fs RMS performance which could be used.
UNSYS:
- Request for access in SA3 was done (fixing PS motors in cell 20 and 21): mostly to be done tomorrow or Wednesday.

SPB:
- Nothing to report.

FXE:
- PP-laser sync problems (6x last week) with loosing timing. It put the PPODL device into Error state; it could be recovered automatically but the laser timing wasn't conserved. 
So in about half the events the laser timing changed by 2-5 ns. Ticket was placed.

MID:
- Thanks to VAC for borrowing He bottle.
- Problems with optical sync; otherwise all fine.

HED:
- Nothing major to report.

SCS:
- Issues with Optical sync: drop happening on the Desy side (which do not have OCD on the weekend). After loosing Sync it took long to recover synchronization. At total about 15hs of beamtime was lost.
- There is no good alarm system indicating the sync was lost. This can be addressed at EuXFEL side. Steffen H. adds that a ticket is ongoing now and a good way for displaying will be worked out.

SQS:
- Nothing to report.
  363   05 Oct 2022, 10:11 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 05.10.2022
General Announcement:
- XFEL got 12 bottles of He gas (50 l; 200 bar) which are connected to the central supply. Only SA1 will receive He gas from central gas supply in order to guarantee the run until the end of 2022. 
The pressure in the line will be monitored and the valve will close if unexpected drop happens. If one needs He gas please get in touch with XO.
- Winter maintenance task list: XO has received almost all lists apart of two of them. Groups missing shall submit the maintenance task list as soon as possible.
- Zunaira A. informs that if SEPS/AIBS is triggered (like last Saturday event) the procedure is to send an e-mail to rpo@xfel.eu.

CTRL:
- Follow-up of MID mirror feedback: problem is hard to replicate; yesterday happened again and recovered itself. MID reports it is stuck at exactly this moment. CTRL will investigate.
- Zunaira A. says on the aftermath of the Saturday AIBS alarm many automatic e-mails are kept to be sent and only today an e-mail saying problem is solved was sent. 
Steffen H. comments that it was informed that a test of the system has to be done due to an occurring bug and currently it has to be manually reset. The test is to take place in winter maintenance time.

DA:
- Nothing to report.

EEE:
- Nothing to be reported besides the Saturday issue with SXP losing power which affected the AIBS. Zunaira A. says devices are in the UPS system (Pandora, which did not give alarm). 
Oleg E. which will exchange components during winter maintenance time.

VAC:
- Not present.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- No news from LAS.

UNSYS:
- Not present.
- XO reports an issue with Phase shifter in SA3 (cells 20 and 21) which are stuck and need motor replacement. This is likely to happen next Monday as users at SCS do not plan to change photon energy.

SPB:
- Nothing to report.

FXE:
- Problem with BAM “S” not properly working. 
- As PRC, F. Wolff-Fabris says a work around is in place and shall use the BAM “M” instead. FXE shall get in touch with BKR for more details.

MID:
- AGIPD preview crashing and has to be restarted.

HED:
- Nothing to report.

SCS:
- Nothing to report.

SQS:
- Not present.
  362   28 Sep 2022, 10:02 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 28.09.2022
General Announcement:
- Announcement: September 30th is the deadline for submitting the Maintenance task list. So far XO received 3 lists.
- Maurizio V. informs that this moment some groups are not yet aware of the 03.12 electrical intervention. The Maintenance time is therefore shorted. XRO will place in task list all planned activities but 
the confirmation if they take place depends on the actual time available for the work. 
A. Galler informs that a presentation wad done in this meeting series and also to the STGL who shall also communicate to their respective groups. It is also perfectly fine to mention that a task may not be 
carried out if it depends on timing plan. In any updates XO will inform via e-mails to xo-info or directly with affected groups.

CTRL:
- Nothing major to report. Follow-up today with MID (on the feedback mirror) in live session.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Concerning the timing system Detector: call to DOC was received and issue was solved.

ITDM: 
- Issue reported last Monday by ITDM (data migration / GPFS): ticket was created and is under investigation.

XRO:
- Nothing to report.

LAS:
- Discussion on the electricity work on Dec. 3rd: XO would like to discuss with LAS later today.

UNSYS:
- Small issue in SA1/cell9: water in the vacuum chamber. Solved by M. Yakopov and MKK. 
- Task list is submitted.

SPB:
- Nothing to report.

FXE:
- Naresh K. reports yesterday night the Hirex was setup for next week together with Peter Z. and it was done by 01:30AM. FXE had no plans for beam usage after that.

MID:
- Feedback to XRO: last week MID changed the mirror stripes from Platinum to B4C using the macros and it worked nicely.

HED:
- Done with compensation to users beamtime; currently changing setup for next user and will not use beam during the day and only few bunches tonight.

SCS:
- Experiment running: no issues.
- Noise with Fast ADC and the ADQ412 was observed when amplifiers were ON: To be checked.

SQS:
- Nothing to report.
  361   26 Sep 2022, 10:14 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 26.09.2022
General Announcement:
- Steffen H. sent an e-mail to instruments scientists informing for a meeting on functional controls to the instruments: Please contact back Steffen H. for participation.
- A. Galler reminds that September 30th is the deadline to submit the winter maintenance period task list. For questions please contact Martin Doering.
- As PRC, Jan G. reports that machine worked nicely without issues last week. 
One issue in photon side was the malfunction of a mirror feedback in SA2 (issues that sometimes it suddenly stops after many hours of working); Another was a small SCS vacuum issue was reported and solved.

CTRL:
- Nothing to report.

DA:
- On the HED time with problems with files two weeks ago: work is in progress.

EEE:
- EEE-OCD received a call during weekend regarding SCS XRD chamber: EEE will get in touch with SCS today to investigate the issue.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- GPFS issue with SA2: data migration not functioning. It was solved but the expert will further investigation taking place today.
- On the HED files issue: looking into data analysis and will set up accordingly for this week.

XRO:
- SA2 Mirror is properly working, the issue with feedback at SA2 seems to be with software. 

LAS:
- Not present.

UNSYS:
- Issue with cell6/SA3: problem with bad connectivity. It is needed to have an access request today to fix the Ethercat card.

SPB:
- Preparing for this week experiment.

FXE:
- Observed the crosstalk when SA3 changes number of pulses when running in interleaved.

MID:
- Feedback mirror issue on Saturday; it was fixed on Sunday. Wajid E. comments it needs beam to further investigate; may be triggered by the Imager. 
CTRL will discuss offline with MID (it needs beam to further test). Jan G. points an e-log entry was done documenting the issue.
- GPFS issue happening.
- Continuously had to re-start the AGIPD pipeline (used as monitoring). P. Schmidt says that a fix may exist and additional investigation has to take place; mostly related to the wrong train-IDs. 
Jolanta A.-D. says it it is a similar problem already known at SCS and it has to filter the train in the analysis. DET and EEE shall further investigate.

HED:
- Starting tomorrow with compensation to the beamtime from 2 weeks ago (collecting into the proposal that is still open).
- Change setup on Thursday for next user starting on Friday.

SCS:
- Jan T.-D. asks on the ZZ access for the soft X-ray Mono: Raul V. is organizing together with Natalia G.

SQS:
- Continuing installation of spectrometer together with Swedish colleagues.
  360   21 Sep 2022, 10:18 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 21.09.2022
General Announcement:
- A power glitch was detected at around 05:50AM today and it was transparent for the machine. Please check your systems are also running normally.
- A reminder will be sent to xo-info for the deadline to submit the winter maintenance task list.

CTRL:
- CTRL was able to reproduce the issue locally at the Imager and the work on a fix is ongoing.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Issue with SA3 FEL IMAGER yesterday morning: a damage to the YAG was found and it was adjusted to a new position. 
A reminder for SA3 instruments: please look at the watchdogs and at higher photon intensities it is preferable to start with the Diamond screen for tuning purposes.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Issue with a stuck phase shifter in SA3 / cell16 was solved by a ZZ by placing a spare motor. Cause is likely due to radiation damage. 
Purchase of Lead shields are ordered and will be delivered next year. 

SPB:
- Nothing to report.

FXE:
- Yesterday it contacted operators to discuss the RF window for SA1 which was set shorter than the requested.
- No further information on the "ghost" beam last week. It was seen only in the detector placed at the beam when SA2 or SA3 were set to zero bunches. 

MID:
- Trouble with hexapod during the weekend, which revealed to be broken. It was removed yesterday and is impacting the sample motion. A workaround is being put in place.
- New monitoring for Agipd gets stuck with calibration. DA is looking into it.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Installing spectrometer during this and next week.
  359   19 Sep 2022, 09:54 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 19.09.2022
General Announcement:
- General announcement: reminder that on September 30th is the deadline to submit the winter maintenance task list. Tasks that are announced later may be included but it cannot be guaranteed to be 
scheduled in the planning.

CTRL:
- Nothing major to report.

DA:
- Nothing to report.

EEE:
- Update in SA3 EPS taking place today to add the SXP imagers.

VAC:
- ZZs taking place last Thursday to bring up VAC signal to North branch: currently looking into causes of XTD2 hiccups.

XPD:
- Thursday event with issues with hard X-ray PES: one channel for the digitizer saw an increased noise; also the MPODS that supply voltages did not restart and a ZZ is necessary to be brought the PES 
operational again.
- Another ZZ is requested by Naresh K. in XTD6. This is scheduled for today.

DET:
- Nothing to report.

ITDM: 
- Issue with loading of calibration factors taking long time: it did not happen again.

XRO:
- Nothing to report. As PRC Maurizio V. reported a quiet weekend.

LAS:
- Nothing to report.

UNSYS:
- Friday cell 12/SA3 phase shifter did not go below 11mm. If this is required again in the future one has to prepare working tables.

SPB:
- The 20keV operation was fine apart of the intensity slope trough the train. 

FXE:
- Nothing to report. No known issues with 12 keV operation on Friday.

MID:
- All fine at MID.

HED:
- Two user beamtimes were successful. 
- One hiccup was an issue with Cluster on Saturday night. That remain for 5-6 hours but was fixed by K. Wrona, who says that it is linked to the high number of created files. 
He increased it by a factor 10 to solve the issue. There are possibilities for improvements that will be discussed among HED, DA and ITDM. Similar experiment will happen again in two weeks.

SCS:
- Experiment taking place this week: electrical check ongoing and PLC connection also.

SQS:
- Nothing to report.
  358   14 Sep 2022, 10:11 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 14.09.2022
General Announcement:
-	 

CTRL:
- Update concerning SA2 Imager issue reported by MID: CTRL is investigating with high priority and is working to apply a fix.

DA:
- Nothing to report.

EEE:
- Next Monday there will be an update of EPS in SA3 to integrate the SXP instrument into it.
- Also work on modification of pre-absorber is to be done together with Maurizio/XRO (also SXP-related).

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Concerning AGIPD 500K at HED: issues with electronics boards were found: it was disassembled and sent to Desy for investigation. 
It was fixed and re-installed back yesterday. Calibration is ongoing and is to be ready before beamtime.

ITDM: 
- Marcin S. says it took long to load calibration factors (around 14:30-15:00 yesterday). ITDM will investigate if something happened at the time.
- Fix for the GPFS mentioned on last Monday was applied in SA2.

XRO:
- No major problems to report.

LAS:
- SA3 PP-laser is back and running; maintenance still to be done today but laser is in good shape.
- LAS will access the other two PP-lasers for similar issues.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report; started to collect data and beamtime going accordingly to the plan.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.
  357   12 Sep 2022, 09:55 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 12.09.2022
General Announcement:
- Machine tried the switch between 24 and 20keV at SA1 during the weekend: it was tuned 24keV at 280uJ max.; 
after changes only around 150-200uJ was found and recovery took many hours. Therefore we will run for this week at 20keV for SA1 instruments.

CTRL:
- InfluxDB issue is done.

DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.
- As PRC, Raul V. comments no major issues happened during the FD week.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Follow-up of GPFS problems: ITDM got a fix that will be applied today late in the day.

XRO:
- Nothing to report.

LAS:
- SA3 PP-laser: the water and humidity in the diode was removed/ dried. Today LAS will evaluate if no humidity is found to start up laser today.

UNSYS:
- Issue with SA3 motors in undulator segments (2 motors in different positions) were solved.
- Three errors in SA2 were solved by the BKR.

SPB:
- For 20keV intensity after tuning was about 500uJ.
- Helped XRO for the FD week: small issues were solved.

FXE:
- Nothing to report; commissioning going successful.

MID:
- Ticket to CTRL on the last MID Tunnel imager was sent during the weekend (software problem) and is being investigated. A. Koch saying that changing the GUI shall restore the system. 
Wajid E. says a bug was fixed and also a work around can be applied. Alberto de Fanis also reports that this has also seen in SQS. Needs further investigation from CTRL.

HED:
- Not present.

SCS:
- Moving the chamber will likely happen on Wednesday (needs Hall crew support).

SQS:
- Nothing to report.
  356   07 Sep 2022, 10:43 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 07.09.2022
General Announcement:
- With respect to the X-ray delivery parameters table: it is pre-filled with parameters agreed during the scheduling of user program. 
Should any deviation from the original parameters occur, this has to be discussed with XO to be seen if that can be accommodated. Please do not consider it just as communication and being granted.
- Manuel I. says the commissioning of mirrors for SXP will happen this FD week and they will try to bring beam inside experimental hutch.

CTRL:
- Reminder that interruption on data logger access today due to Influx-DB maintenance;
- Issue with PP-laser has been discussed yesterday and is under investigation by LAS if proposed solution is feasible.

DA:
- Off line calibration update today taking place: with 15-20 min downtime.

EEE:
- Investigating the digitizer artefacts from SQS.
- PLC team will recalibrate slits in SA3 tomorrow.
- Meeting in cw38 is scheduled for the timing issues with PP-laser.

VAC:
- Nothing to report.

XPD:
- All XPD devices are fine;
- Follow-up from SCS / access right in XGMs: The access rights for instruments were changed. This shall impede one instrument accessing controls for another beamline XGMs. 
Similar mistakes as seen last weekend shall not happen anymore.

DET:
- Nothing to report.

ITDM: 
- Follow up with GPFS problems last Tuesday at MID: something new was found this time and an update will be done in SA2 today (shall be unnoticed by users) and tested tomorrow. If successful to SA2 then it 
goes deployed to SA1 later.

XRO:
- Not present.

LAS:
- Meeting is set with P. Gessler and Tim Wilksen.
- Test tomorrow in SA1 taking place (trigger delay device).

UNSYS:
- Nothing to report.

SPB:
- All fine.

FXE:
- Nothing to report.

MID:
- XO can expect cw38 beam parameters this evening.

HED:
- Needs to move mirrors to Platinum strip this week for the next week run at 18keV. Naresh K. comments on the HXRSS studies this weekend at different photon energies and will communicate with XRO and HED 
on a strategy.

SCS:
- Announcement that end station will be moved inside the hutch on Friday or Monday.
- On the local power outage: reason is found and understood.

SQS:
- Not present.
  355   05 Sep 2022, 10:07 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 05.09.2022
General Announcement:
- If an instrument experiences a feature of machine that does not work, please do not hesitate in contacting the PRC, who is there to support you.

CTRL:
- Nothing to report.

DA:
- On Wednesday an update with minor interruption is due to happen.

EEE:
- DOC announcement: there will be no DOC but DRC is in place (Patrick Gessler).
- Jour-fixe meeting is happening today at 13:00.

VAC:
- Nothing to report.
XPD:
- SA3 FEL Imager: under investigation.

DET:
- Nothing major to report.

ITDM: 
- Maintenance of GPFS system on Tuesday (user system for offline storage will not be available tomorrow).

XRO:
- Ticket for follow up of the SRA XTD1 interlock (motor positions do not correspond to actual location - to be investigated by EEE).
- Maurizio V. will be in OCD for XRO this week (blue week).

LAS:
- Issues with timing and triggers: work around by switching OFF the pattern. Further discussion to take place.
- Laser-2 change caused a damage to SPB laser. No optical damage, only electronics.
- SCS reported laser “disappeared”. Meeting and work shall involve DESY group. XO will reinforce with Desy.

UNSYS:
- Nothing to report.

SPB:
- Issue with Laser;
- Issue with XGM: loose single shot. It was reported to the PRC. 
Laurent M. says they tried to setup XGM when it went down. He proposes to setup a specific Karabo device that works only with the one in use. XPD will discuss offline.

FXE:
- Work with new cryo system this week.

MID:
- Info for DRC: MID expects to use beam on Sunday during the day.

HED:
- All fine at HED.

SCS:
- Issue with BAM stabilization. It was requested but due to issues it was turned OFF during the weekend. It took time to realize it was OFF and to find experts to bring up again.
- Power outage in some devices at the experimental hutch. TS was called and came to fix it. 
- Liubov S. says problem relates to the laser interlock occurred: it searched few times before one could eventually set it.

SQS:
- Issue with ADQ digitizer of Spie devices: more than one in one crate and in interleaved mode it gives a random artefact. 
It was discussed with EEE: vendor says there is nothing what can be done. If someone else has issues please join forces with SQS.
  354   31 Aug 2022, 10:16 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 21.03.2022
General Announcement:
- Announcement from Martin Doering on the next Winter maintenance period: 1. presented timeline for the coming WMP; 2. minor changes to the maintenance task list; 3. pre-announce the electrical 
interruption that will happen on Dec. 3rd;
- Release of MTL takes place in 02.09; deadline for submitting MTL on Sep.30th; release of summary task list on Oct. 28th. WMP starts on Nov.29th.
- Electrical Interruption on December 3rd: 
Two interventions to be done (by TS and MKK1) in order to connect power to XHO1 and XHV and to upgrade transformer at XHVAC (allowing uninterrupted maintenances in future). 
Affected locations: XHQ, XHEXP1, XHWS, XHVAC, media duct XHVAC and XHPSC; tunnels XTD4,6,7,8,9,10; XSDU-1 and XSDU-2. No power on 03/Dec. from 06:00 to 18:00. No access to campus during this time.
Ramp-down of equipment on 02.12 up to 24:00: all systems have to be powered off. 
Electrical work conducted on 03/12.
Ramp-up on Sunday 04 and Monday 05 December. Sunday is for critical devices that can not wait until Monday to be switched ON.

Safety choice is to power OFF all equipment, regardless of the secondary power line; Saturday is chosen as has the least overall impact at the facility and in working conditions. 

- For questions please contact xo-planning@xfel.eu.

CTRL:
- Issue with PP-laser bunch configurator still remains and is under investigation.
DA:
- Nothing to report.

EEE:
- Nothing to report.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- FXE detector issue: problem remains but instrument manages to conduct experiment. Board has to be first exchanged by the expert who returns next week. 

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Issue with PP-laser multi pattern with CTRL.
- Random trigger issue with SA1:  had to set back-up again. DOC is investigating.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Beam operation last night: problems with 2-color in the night and also problem with a motor; both solved.
- Light from SA1 has been seen and will be investigated today.

SQS:
- Not present.
  353   29 Aug 2022, 09:56 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 29.08.2022
General Announcement:
- During the next Wednesday XO Integration Meeting a kick-off presentation by Martin Doering will be done to present the next winter maintenance including an electrical activity that will shutdown almost 
the entire campus.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- A ZZ together with VAC was done in SA1 tunnel yesterday night due to a failure of a terminal for a crate.
- Another ZZ to check piezo motors in SXP branch will happen today.

VAC:
- Apart of the downtime of yesterday nothing to report.

XPD:
- Nothing to report.
- Naresh K. as PRC informs that a mal function of a terminal for a VAC controller rack close to the XGM prevented vacuum operation and closed the XGM valve. After the ZZ by VAC OCD and EEE one could 
restart XGM.
- SA3 was down for 1:30 hours; after closing absorber in SA1 to allow SA3 beam only 30 bunches were allowed. To be addressed by the PRCs.
- Miscommunication with BKR operators on SAT at midnight asking for permission from SQS to change SA1 to 6keV, procedure that was done the whole week already. To be discussed with Desy RCs.

DET:
- Nothing to report. 
- As DRC Olivier Meyer informs it was a quite week, apart of the vacuum issue yesterday.

ITDM: 
- Nothing to report.

XRO:
- A ZZ together with EEE is requested today.

LAS:
- Laser operation was relatively smooth; few minor issues with trigger and timing delay; in contact with CTRL for solutions.

UNSYS:
- An OCD dedicated number for undulator issues is available: 9-4850

SPB:
- Nothing to report.

FXE:
- Problem with Jungfrau (data was noisy). Olivier M. comments that a call was received at the start of the week; an intervention was done and in his understanding no feedback from FXE was saying it was a 
show stopper.
- Changing in time by 1ns;
- E-log was giving error messages (unavailable). Patrick G. suspects of network issues but will be investigated.

MID:
- Users from two weeks ago will use beam next weekend at 12keV.

HED:
- Nothing to report; experiment was successful and has lots of data.

SCS:
- Not present.

SQS:
- Not present.
  352   24 Aug 2022, 09:28 Andreas GallerGeneralInformationNotes XO Integration Meeting 24.08.2022

General Announcement:

  •  

CTRL:

  • nothing special

DA:

  • nothing

EEE:

  • actions from Monday (SA3 PLC master update,  PNACT testing) successful

VAC:

  • vacuum ok

XPD:

  • nothing

DET:

  • nothing major to report

ITDM:

  • nothing to report

XRO:

  • nothing to discuss

LAS:

  • nothing

UNSYS: 

  • nothing

SPB/SFX:

  • nothing

FXE:

  • all fine

MID:

  • all fine

HED:

  • undulator setting off by 100 eV --> HED had means to accurately measure the delivered photon energy and compensate for that.

SCS:

  • nothing

SQS:

  • nothing

DRC

  • nothing

PRC

  • nothing

 

  351   22 Aug 2022, 09:50 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 21.03.2022
General Announcement:
- Power glitch on Saturday morning took two cryo streets down and beam was recovered more than 24:00 later.
- Naresh K. as PRC reminds instruments to retract CRLs and place beamlines in safe state after ending the beamtime on Mondays.
- P. Schmidt as DRC reports that minor issues were addressed on Sunday after beam was back.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- PLC team busy today for testing the tunnel PNACT remotely.
- SA3 PLC master upgrade also happening today from 10:00.

VAC:
- Saturday's power glitch did not affect any vacuum devices this time.

XPD:
- Nothing to report.
- Naresh K., as PRC, reports MID got 30mins more beam as agreed with operators.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Ask SCS for confirmation if it is needed to change PP-laser rep rate this week. SCS will confirm later.

UNSYS:
- Nothing to report.

SPB:
- Intervention last night was advertised 20 mins but took 1 hour.

FXE:
- Issue with digitizers for detector was solved.

MID:
- User experiment on THU/FRI went good.
- Second user experiment on SAT/SUN received about 12hs of beam delivery; no outcome.

HED:
- Nothing to report.

SCS:
- Suffered from downtime.

SQS:
- Nothing to report.
  350   17 Aug 2022, 11:19 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 17.08.2022
General Announcement:
-  Machine is currently set at 12 GeV to best accommodate the requests for the next 3 weeks.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- SA1-PP laser update is done and no problems are seen now.

VAC:
- Nothing to report.

XPD:
- Jan G. informs as PRC the machine had difficulties to tune SA1 and SA2 yesterday. However overnight intensities improved by a factor 2 and are now higher or equal than 1 mJ (6keV at SA1 and 9keV in SA2).

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Started using beam to pre-align mirrors last night.
- Intensity is lower than expected to start with. To be seen if user program will be affected.

FXE:
- FXE performed the work as planned last weekend. When changing undulator gap on Sunday beam jitter occurred.

MID:
- Still need 352 pulses for this week; Pre-tuning at 12keV was done during the night with 500uJ intensity.
- A stage has to be implemented for the user runs together with G. Giovanetti.

HED:
- Not present.

SCS:
- Nothing to report.

SQS:
- Maurizio V. asks on the last week’s photon energies (lower values) and would like to discuss with SQS the performance of the beamline transport concerning the C absorption (mirrors). SQS will look 
together with XRO.
  349   15 Aug 2022, 09:49 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 15.08.2022
General Announcement:
-  On Saturday 4AM there was a very short power glitch. Machine kept running and to our best knowledge only the SA3 GATT had to be reset afterwards. 
If any group find any other affected device, please inform XO or the PRC.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Updates for SA1 PP-laser are coordinated with LAS.
- OCD call yesterday to replace motor on site (HED?).

VAC:
- Issue with GATT on Saturday early morning. It was resolved by SQS and VAC-OCD. Under investigation; it may be related to a drop of cooling water flow.

XPD:
- Nothing to report regarding XPD and PRC duties.

DET:
- Nothing to report.

ITDM: 
- Small issue related to Graphana but fixed on Saturday.

XRO:
- Nothing to report.

LAS:
- Nothing to report.

UNSYS:
- Small issue with PS cell33/SA2: fixed and working by now.

SPB:
- Nothing to report.

FXE:
- No info on the beam usage over the weekend.

MID:
- All fine.

HED:
- Used beam from Friday until Sunday 23:00.

SCS:
- Using TOPAS for laser: some instability was found and shall be checked today together with LAS.

SQS:
- No news from the user program.
  348   10 Aug 2022, 09:56 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 10.08.2022
General Announcement:
- Machine has restarted after the cryo failure: SA3 is receiving photons and tuning in SA1 and SA2 tunings are still ongoing.
- The SA3 beam pointing position (by the crosshair) was fixed on Monday. 

CTRL:
- Request on background effects on XTD2/SA1 Imager is ready to be deployed. SPB/SFX agreed to install now as there is no beam. A. Parenti will get in touch with SPB/SFX.

DA:
- Calibration constant (low) performance issue on the GPFS cache is solved. If issues still appear please contact Philipp S.

EEE:
- Nothing to report.

VAC:
- GATT SA3 is set with Ar operation. VAC needs to make tests (30 mins) regarding the injection issue that appears eventually and it will get in touch with SQS for defining a suitable time.

XPD:
- Nothing to report.

DET:
- Nothing major to report.

ITDM: 
- Nothing to report.

XRO:
- Not present.

LAS:
- Nothing to report.
- Lasermet was contacted and no news by now.

UNSYS:
- Issue with cell33/SA2 not moving yesterday night was fixed by now.

SPB:
- Reports a misunderstanding with BKR on the requested 6keV photon energy.

FXE:
- Nothing to report.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report. SQS will contact Martin D. for the tests on the GATT.
  347   08 Aug 2022, 09:54 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 08.08.2022
General Announcement:
- The accelerator is down since Sunday morning. An oil pump of the warm compressor failed at around 7;00AM. In the afternoon a temperature of a cold compressor bearing raised and had to be exchanged. 
Cryo OK is expected today at 22:00. The operation for the current week will be updated by XO as soon as news are shared. 
- Harald Sinn as PRC informs the SA3 pointing is not so perfect (issues with crosshairs). Center of aperture is currently being used by SCS. 
SQS still has to find if actual position is good. When A. Koch is back this shall be revisited.

CTRL:
- Nothing to report.

DA:
- Nothing to report.
- Update of GPFS online analysis issues: mitigations put in place are working. 

EEE:
- One issue with a motor was solved by the DOC on Saturday.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Nothing to report.
- M2 mirror in SQS (new feature reported last week): no news.

LAS:
- FXE reported PP-laser to have long pulse duration and small beam profile at hutch. LAS is discussing and investigating with FXE. An update will be done by end of the day.
- SA3 PP-laser: SCS reported not been able to open instrument hutch. A restart /re-cycling of laser interlock was done and worked properly, consequently shall not be the issue's origin. 
SCS shall contact SRP and Lasermet. A proposition is to use dummy connector but needs to be discussed with SRP.

UNSYS:
- Nothing to report.

SPB:
- Nothing to report; Program of last week could be carried out.

FXE:
- Nothing to report.

MID:
- All fine at MID.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Nothing to report.
  346   03 Aug 2022, 10:10 Frederik Wolff-FabrisGeneralInformationNotes XO Integration Meeting 03.08.2022
General Announcement:
- Regarding the cw32 photon energies: it is expected for 8 GeV to have up to 6keV for the Hard X-ray beamlines. A third harmonic attempt at SA2 will be made. Expected photon intensities are in the order of 
500uJ.
- DOC shall run OK for operation regarding the number of available staff members. It includes people working remotely.
- SEPS interlock was approved last Monday and Tuesday. For questions please get in touch with Zunaira A.
- Harald Sinn as PRC reports: 
1. that yesterday there was a malfunction at SA1 and SA2 hutch search; together with Eric Boyd and Desy colleagues a fast replacement of devices was done; 
2. A confusion between change from SQS and SCS: not clear what time the change would have to be made and it was finally decided to do this morning; it requires Theo involvement.

CTRL:
- Follow-up of SA2 VAC loop: EEE changed the timing for the triggering updates and it seems to have improved; no slowness was seen since them. A fine tuning of the parameter will be made.

DA:
- Nothing to report.

EEE:
- Finishing the handover activities;
- PLC team working with CTRL to mitigate VAC loop issues;
- Fast electronics working with updates;
- Timing configurations were updated yesterday.

VAC:
- Apart of the VAC loop, nothing to report.

XPD:
- SXP Imager had a long exposure time but it is now fixed.

DET:
- Nothing to report.

ITDM: 
- Nothing to report.

XRO:
- Recommissioned devices after the summer maintenance period. Feedback from instruments would be highly appreciated.
- SQS and SCS found features on M2 mirror in SA3 that needs more investigation (a fresh area of the mirror to be used was found).

LAS:
- SA2 PP-laser is working.
- PP-laser beam for FXE shall be ready for today; For SPB on next Monday.
- SA3 PP-laser for SCS is handled; for SQS will be ready on Monday.

UNSYS:
- Nothing to report.

SPB:
- Yesterday XGM was not instantiated but it may be solved by EEE.

FXE:
- Not present.

MID:
- EPS system triggered limit of 300 pulses; It seems to be related to a foil / diamond detector system. MID was not informed of this change in EPS. 
Nerea J. informs that the new entry at EPS was a request from XPD. Harald S. says an option is to the machine to increase the EPS to 360 pulses.  
- RF window was allowing only 272 pulses and not the requested 352 pulses.

HED:
- Nothing to report.

SCS:
- Not present.

SQS:
- Alberto Defanis says that the new mirror region found is not fully understood by SQS staff.
- Problem with the digitizer: shows an artefact and a discussion with the manufacturer is ongoing and may require its intervention. EEE is on the loop.
ELOG V3.1.4-7c3fd00