Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 404     Entry time: 20 Mar 2023, 09:43
Author: Frederik Wolff-Fabris 
Location: General 
Severity: Information 
Subject: Notes XO Integration Meeting 20.03.2023 
General Announcement:
- An e-mail was sent to xo-info list about the pressurized air that is being serviced at XHEXP1. Some vacuum valves may close and please check for components connected to pressurized air. 
This intervention had to be done as the system is being reconnected due to an extension.

CTRL:
- Nothing to report.

DA:
- Nothing to report.

EEE:
- Nothing to be reported.

VAC:
- Nothing to report.

XPD:
- Nothing to report.

DET:
- Chiller from SCS taken and installed at SPB/SFX for AGIPD cooling, working fine
- MPOD problem at SPB/SFX required installation of a spare card, now working fine.

ITDM: 
- Nothing to report.

XRO:
- Nothing major to report.

LAS:
- Nothing to report.

UNSYS:
- Nothing to report.

SPB:
- Confirm that Julabo chiller was replaced and is operation.
- An MPOD was replaced and works again.

FXE:
- FXE review happening and FXE will not use night beam on Tuesday and Wednesday; SPB/SFX can use the beam.

MID:
- Nothing to report.

HED:
- Nothing to report.

SCS:
- Nothing to report.
- SCS will contact Nerea J. to discuss a question/issue.
- A. Galler asks Jan Torben D. to verify with SCS colleagues on the reported jitter due to SA2 tuning.

SQS:
- Nothing to report.

SXP:
- Nothing to report.