Technical integration and coordination SASE1 Status and SASE3 Readiness
  Technical integration and coordination logbook, Contact: A. Violante, G. Wellenreuther  Not logged in ELOG logo
Message ID: 410     Entry time: 12 Apr 2023, 09:23
Author: Andreas Galler 
Location: General 
Severity: Information 
Subject: Notes XO Integration meeting 12.04.2023 

General Announcement:

  •  

CTRL:

  • not much to report

DA:

  • not much more to report

EEE:

  • not much to add

VAC:

  • successful intervention for Turbo Pump intervention of PES in XTD10

XPD:

  • Diamond Detector Study in SA2 on Thu

DET:

  • not much to report

ITDM: 

  • last week was super successful with SPB taking 5 PB of data
    • however please provede better estimations, here a factor of 5 overshoot was seen.

XRO:

  • not present

LAS:

  •  

UNSYS: 

  • one terminal SA3 cell 5 issue over the week --> replaced on Tuesday

SPB/SFX:

  • EPS issue SPB_XTD9_IMGPI out siwtch not working --> limited to two pulses --> taken out of EPS interlock
    • later repaired by XPD

FXE:

  • nothing

MID:

  • all fine

HED:

  • excellent performance of the self-seeded x-ray beam last week, for the user experiment #3326 (Fri-Sat).
    The beam is very stable both in terms of intensity (700-800 uJ constant) and the pointing jitter! Users were very happy with the performance and the experiment was successful. 

SCS:

  • issues with electronics
    • EEE contacted and Bernard going to support today

SQS:

  • not present

SXP:

  • nothing to report

DRC

  • n/a

PRC

  • n/a