Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 7 of 30  Not logged in ELOG logo
ID Datedown Author Location Severity Subject Text Attachments
  477   21 Feb 2018, 10:55 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


KB chamber being pumped
down
Smaract commissioning ongoing
Coordinate
  
  476   20 Feb 2018, 12:29 Eric BoydGeneralInformationFXE Beam Shutter KeyThe FXE beamshutter key has been installed
into the interlock system after satisfactory
completion of the FXE Chicane and Radiation
  
  475   19 Feb 2018, 09:56 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB




KB chamber being
pumped down


interaction
  
  474   18 Feb 2018, 17:20 Jan GrünertGeneralInformationCAS OCDHere is a information from Sandor on CAS
OCD Numbers
(this info is copied from the SASE1
  
  Draft   16 Feb 2018, 15:44 Adriano ViolanteGeneralInformationStatus and plans after SASE1 Status/SASE3 Readiness Meeting 16.02.Photon
Run Coordinator Report to Readiness Meeting

The
  
  472   14 Feb 2018, 14:21 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


MIddle layer karabo devices
are responsible for the det. Karabo problems.
  
  471   12 Feb 2018, 10:03 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


During operation Karabo
crashed. As soon as detector is being operated
  
  470   12 Feb 2018, 08:46 Adriano ViolanteGeneralInformationStatus and plans after SASE1 Status/SASE3 Readiness Meeting 09.02.General


"In the beginning of this
meeting SM congratulated the whole staff
  
  469   07 Feb 2018, 09:47 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB/SFX

- An AGIPD crate providing power
broke down and has been fixed already by
  
  468   05 Feb 2018, 13:18 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB

- MIrrors installation (2 horizontal
mirrors) in D.02 has started 
  
  467   05 Feb 2018, 09:11 Adriano ViolanteGeneralInformationStatus and plans after SASE1 Status/SASE3 Readiness Meeting 02.02.SPB

- Loops update OK

- Issue with SmarACT controllers.
  
  466   31 Jan 2018, 22:34 ITDM AdminGeneralInformationRe: exflgateway migrationThe migration has finished, to avoid temporary
problem with ssh you can use

ssh exflgateway -o StrictHostKeyChecking=no
  
  465   31 Jan 2018, 14:56 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00SPB/SFX:


Fixing of Karabo scenes
ongoing
Loop 5 need to be updated
  
  464   31 Jan 2018, 10:06 ITDM AdminGeneralInformationexflgateway migrationToday late in the evening (~22:00), the
exflgateway will be migrated to a new hardware.
All users will be logged out before migration
  
  463   29 Jan 2018, 14:51 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00SPB/SFX:


Problems with data loggers
==> no statements about the past.
Loop
  
  462   29 Jan 2018, 10:32 Martin DommachXTD10Informationclosing of XTD10 shifted to WednesdayDear all,

the closing of the XTD10 tunnel
is shifted to Wednesday (January 31st.) at
  
  461   29 Jan 2018, 10:02 Gerd WellenreutherGeneralInformationLink to "Access Request" gathering for tunnels after the shutdownDear all,

please enter your access requests
to the tunnels into the list provided by
  
  460   29 Jan 2018, 09:29 Gerd WellenreutherGeneralInformationStatus and plans after SASE1 Status/SASE3 Readiness Meeting 26.1.SPB/SFX:



Preparation
for the mirror installation were ongoing
  
  459   24 Jan 2018, 16:15 Bruno FernandesGeneralInformationSASE1 Timing System UpdateDear all,

the update to the SASE1 Timing
system has been perform with no problems.
  
  458   24 Jan 2018, 14:48 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00SPB/SFX:


Preparing D.02 for mirrors
installation (next 2 weeks no access to D.02)
Karabo
  
ELOG V3.1.4-7c3fd00