Message ID: 458     Entry time: 24 Jan 2018, 14:48
Author: Adriano Violante 
Location: General 
Severity: Information 
Subject: Status report after dispatch meeting 13:00 

SPB/SFX:

  • Preparing D.02 for mirrors installation (next 2 weeks no access to D.02)
  • Karabo being updated - Detector being tested, seems fine so far.
  • DAQ tests foreseen for today
  • NKB movement (Loop3) should be tested to make sure that the controls work fine before interfacing the MKB with real mirrors inside.
  • AE will check the status of the CSS crate. If ready it will be mounted and tested after the MKB.

Advanced Electronics:

  • ATM for timing has to be replaced in the balcony rooms.  downtime expected to be  15 minutes. Will happen Today at 16:00

CAS:

  • Deploy SASE1 topic in the tunnel this week.Tomorrow at 13:oo CAS would like to make the switch. A.Silenzi will write an entry in the logbook to make sure everyone is on board with that.
  • Release of the version 2.2.2. being prepared. This would mainly improve the GUI performance.

XPO

  • FXE Mono local test performed and OK. To be tested through Karabo in Feb.

CAS SASE3 (C. Youngman):

  • Gas attenuator controls being completed and tested.
  • Soft MOno local test done and only small problems found
  • EPS loop in good state - interlock test tomorrow.