Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 26 of 30  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Location Severity Subject Text Attachments
  482   02 Mar 2018, 14:36 Adriano ViolanteGeneralInformationStatus and plans after SASE1 Status/SASE3 Readiness Meeting 02.03.Photon
Run Coordinator (N. G. Kujala):


SASE1


  
  483   05 Mar 2018, 11:07 Adriano ViolanteXHEXPInformationStatus report after dispatch meeting 09.30 

SPB


Last night the beam disappeared
  
  484   05 Mar 2018, 16:37 Adriano ViolanteGeneralInformationDetails on SPB issues reported in the dispatch meetingsBelow some clarifications from R. Bean
on the issues reported in today's dispatch
meeting:
  
  485   07 Mar 2018, 11:14 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB:


Monday morning Karabo failed.
It was not possible to operate anything.
  
  486   12 Mar 2018, 08:18 Adriano ViolanteGeneralInformationStatus and plans after SASE1 Status/SASE3 Readiness Meeting 09.03Photon Run Coordinator (L. Samoylova):


Commissioning during
  
  487   12 Mar 2018, 13:18 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB (Weinhausen):


During the night there
was an interlock issue. The fast shutter
  
  488   14 Mar 2018, 10:06 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB (Weinhausen/Round/Mancuso):


Again on the fast valve was
triggering the MPS interlock system. For
  
  489   19 Mar 2018, 08:42 Adriano ViolanteGeneralInformationStatus and plans after SASE1 Status/SASE3 Readiness Meeting 16.03..Photon Run Coordinator (H. Sinn):

1.) SASE1: User experiment SPB
could be finished sucussfully after several
  
  490   19 Mar 2018, 10:24 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30No new issues to be discussed where reported
by any groups.

The status and issues reported
  
  491   21 Mar 2018, 10:02 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB

On monday there was an issue with
a detector related PLC due to misconnection
  
  493   26 Mar 2018, 13:10 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30General

Due to the triggering of the emergency
power off in FXE caused by electrical works
  
  495   28 Mar 2018, 15:22 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB


Sample delivery installed.
Tonight will be commissioned. Experiment
  
  500   09 Apr 2018, 11:50 Adriano ViolanteXHEXPInformationEmergency off test in SPB/FXE - UpdateDue to some delay in the installation of
some necessary cables, the emergency power
off test foreseen for today 06.04. in the
  
  501   09 Apr 2018, 14:25 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00General

Emergency off test in SPB is shifted.
Date to be agreed on Friday. FXE test stays
  
  502   09 Apr 2018, 14:37 Adriano ViolanteGeneralInformationKarabo deployment datesFYI

Below
the E-Mail from Hugo Santos with the Karabo
  
  503   11 Apr 2018, 13:48 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00SPB


Detector z motion would
be needed. AE checks the status of the crate.
  
  504   12 Apr 2018, 15:34 Adriano ViolanteGeneralInformationWater cooling mointenance by MKK doneDie Arbeiten an der Kühlwassersteuerung
konnten innerhalb des genannten

Zeitraums abgeschlossen werden,
  
  505   13 Apr 2018, 07:50 Adriano ViolanteGeneralInformationKarabo 2.2.3 installationHi all, for your information below a message
from Chris Youngman concerning Karabo 2.2.3
installations in SASE3.
  
  507   13 Apr 2018, 09:40 Adriano ViolanteXHEXPInformationEmergency off test in SPB/FXEEmergency power test will be performed
at the following dates:

FXE - Mon. 16.04.
  
  508   13 Apr 2018, 13:01 Adriano ViolanteXHEXPInformationDates TÜV Test SASE3 IntelrocksInterlock systems SASE3 - TÜV test

The pre test by D3 will be held
on 20.06.
  
ELOG V3.1.4-7c3fd00