Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 24 of 30  Not logged in ELOG logo
ID Date Author Locationdown Severity Subject Text Attachments
  447   11 Jan 2018, 15:17 Bruno FernandesGeneralInformationFXE/SPB/PPL Timing UpdateHi everyone,

after talking with the responsabile
people, here's the timetable for the
  
  448   12 Jan 2018, 11:10 Gerd WellenreutherGeneralInformationStatus and plans after Readiness Meeting

  
  449   12 Jan 2018, 14:34 Bruno FernandesGeneralInformationUpdate Timing Firmware/Doocs ServerDear all,

with the exception of one board,
all boards in SASE1, SASE3, FXE, SPB and
  
  450   15 Jan 2018, 13:56 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00
SPB:
- The exchange
of the mc and mfpga boards has been done
and some problems were found. The boards
  
  451   17 Jan 2018, 13:54 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00
SPB:
- one mfpga
board was found malfunctioning and was replaced
with the old one. Concerning the mc the new
  
  453   17 Jan 2018, 16:53 Bruno FernandesGeneralInformationEvent #16 back to 1Hz Dear all,

I communicated today on the 13h
meeting that the Trigger #16 was back to
  
  454   19 Jan 2018, 16:06 Bruno FernandesGeneralInformationEvent #16 back (for good) to 10Hz Event trigger #16 is now back to 10Hz and
it will still that way.
  
  455   22 Jan 2018, 10:36 Gerd WellenreutherGeneralInformationStatus and plans after Readiness MeetingSPB/SFX:


2nd AGIPD intervention
will be finished today.
SE worked
  
  456   22 Jan 2018, 13:28 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00General remarks:


Stable beam only to be
expected starting from 1.03. for SASE1 instruments
  
  457   22 Jan 2018, 15:12 Bruno FernandesGeneralInformationRe: Status report after dispatch meeting 13:00Hi everyone,

there was some miscommunication
between us and DESY: only the Timing firmware
  
  458   24 Jan 2018, 14:48 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00SPB/SFX:


Preparing D.02 for mirrors
installation (next 2 weeks no access to D.02)
Karabo
  
  459   24 Jan 2018, 16:15 Bruno FernandesGeneralInformationSASE1 Timing System UpdateDear all,

the update to the SASE1 Timing
system has been perform with no problems.
  
  460   29 Jan 2018, 09:29 Gerd WellenreutherGeneralInformationStatus and plans after SASE1 Status/SASE3 Readiness Meeting 26.1.SPB/SFX:



Preparation
for the mirror installation were ongoing
  
  461   29 Jan 2018, 10:02 Gerd WellenreutherGeneralInformationLink to "Access Request" gathering for tunnels after the shutdownDear all,

please enter your access requests
to the tunnels into the list provided by
  
  463   29 Jan 2018, 14:51 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00SPB/SFX:


Problems with data loggers
==> no statements about the past.
Loop
  
  464   31 Jan 2018, 10:06 ITDM AdminGeneralInformationexflgateway migrationToday late in the evening (~22:00), the
exflgateway will be migrated to a new hardware.
All users will be logged out before migration
  
  465   31 Jan 2018, 14:56 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 13:00SPB/SFX:


Fixing of Karabo scenes
ongoing
Loop 5 need to be updated
  
  466   31 Jan 2018, 22:34 ITDM AdminGeneralInformationRe: exflgateway migrationThe migration has finished, to avoid temporary
problem with ssh you can use

ssh exflgateway -o StrictHostKeyChecking=no
  
  467   05 Feb 2018, 09:11 Adriano ViolanteGeneralInformationStatus and plans after SASE1 Status/SASE3 Readiness Meeting 02.02.SPB

- Loops update OK

- Issue with SmarACT controllers.
  
  468   05 Feb 2018, 13:18 Adriano ViolanteGeneralInformationStatus report after dispatch meeting 09.30SPB

- MIrrors installation (2 horizontal
mirrors) in D.02 has started 
  
ELOG V3.1.4-7c3fd00