Group Selection Page HELP DOC Controls Group Data Analysis Group ITDM WP76 DET Vacuum XRO EEE WP78 WP74 FXE SCS SPB MID HED SQS SXP Sample Environment Photon Commissioning Team Operation PSPO XO TS
Technical integration and coordination SASE1 Status and SASE3 Readiness
  Joint Operation and Readiness Logbook, Contact: T.Haas, A. Violante, G. Wellenreuther, Page 17 of 30  Not logged in ELOG logo
ID Date Author Location Severity Subjectdown Text Attachments
  342   24 Jul 2017, 10:38 Adriano ViolanteGeneralInformationStatus after 9.30 MeetingGeneral


The latency observed by
SPB in the GUI client has been almost completely
  
  344   26 Jul 2017, 10:35 Adriano ViolanteXHEXPInformationStatus after 9.30 MeetingGeneral


Today the machine is being
prepared to lase with 30 bunches in order
  
  129   11 Apr 2017, 12:51 Tobias HaasGeneralInformationStatus after 0930 meetingTunnel   
  199   03 May 2017, 11:04 Tobias HaasGeneralInformationStatus after 0930 meetingTunnel
Status: XTD2/4/10 closed. XTD9 open. Controlled
  
  262   24 May 2017, 10:39 Tobias HaasGeneralInformationStatus after 0930 meeting General:

    DESY will try to lase
again at higher energies during the next
  
  375   04 Sep 2017, 10:39 Tobias HaasGeneralInformationStatus after 0930 meetingSPB


Demo experiment done last
week
Flat fields taken with AGIPD
  
  376   04 Sep 2017, 12:03 Tobias HaasGeneralInformationStatus after 0930 meetingJust to clarify:


Tunnel and SPB are in different
Karabo Topics. It should not be a problem
  
  378   06 Sep 2017, 11:04 Tobias HaasGeneralInformationStatus after 0930 meetingFXE


Still working on getting
the laser on the sample
Commissioning
  
  416   06 Nov 2017, 14:13 Tobias HaasGeneralInformationStatus after 0930 meetingGeneral


Recomissioning of the FEL
has been bumpy and up to this point only
  
  417   09 Nov 2017, 13:21 Tobias HaasGeneralInformationStatus after 0930 meetingGeneral


There is currently no beam
less than 24h before user operation is supposed
  
  421   15 Nov 2017, 11:51 Tobias HaasGeneralInformationStatus after 0930 meetingInstruments


SPB:

Waiting
for beam to come in a usable condition (500
  
  423   20 Nov 2017, 10:21 Tobias HaasGeneralInformationStatus after 0930 meetingGeneral


Intensity and availability
of beam was good over the weekend
Large
  
  428   04 Dec 2017, 10:56 Tobias HaasGeneralInformationStatus after 0930 meetingGeneral:


User operation with good
beam conditions over the weekend
One
  
  143   13 Apr 2017, 13:19 Tobias HaasGeneralInformationStatus Interlock Tests TodayRadiation Interlock Tests are finished.
Tunnels XTD9 and XTD10 up to the fence at
the dump can be accessed right now. Magnet
  
  1   26 Oct 2016, 13:55 Tobias HaasGeneralInformationStart of LogbookDear Colleagues,
in the future we would like to use
this mechanism to record and exchange information
  
  28   27 Jan 2017, 09:25 Tobias HaasGeneralInformationSoftware ReportPost on behalf of S. Brockhauser
 
  
  188   28 Apr 2017, 13:24 Tobias HaasGeneralInformationSmall correction to minutes posted just beforeNote that plans for next week (points 2&
3) should refer to XTD9 and *NOT* XTD2
 
  
  207   04 May 2017, 19:40 Jan GrünertGeneralProblemSlow loading in karabo GUIThe current slow response times in the
karabo GUI are the following (some measured
times for reference):
  
  440   09 Jan 2018, 10:32 Martin DommachGeneralProblemShutdown of compressed air distribution in XTDs todayDear all,

we got the information from MKK,
that they have to fix a leak in the main
  
  509   13 Apr 2018, 13:50 NEREA JARDONGeneralInformationShutdown MicroTCA4 SPB and FXEThis entry is on behalve of Frank Babies,
if you have any doubt about it, contact him:

On 16.Apr.2018
  
ELOG V3.1.4-7c3fd00